Loading…
Loading…
15,794 results • Best match
Repair work of 1X18 00 M Span Minor bridge of Semari Raebareli Parsadepur Bara Nanauti road MDR 103C in KM 52 Dist Rae Bareli
eProcurement System Government of Uttar Pradesh Created By: MAHIPAL SINGH Created Date/Time: 25-May-2026 03:54 PM Tender Title: Repair work of 1X18 00 M Span Minor bridge of Semari Raebareli Parsadepur Bara Nanauti road MDR 103C in KM 52 Dist Rae Bareli Tender ID: 2026_CEUCZ_1148105_1
Construction of Bridge Over River Birma on Bilgaun to Mihuna Road with Approach and Additinoal Approach and Protection work in district Hamirpur
Construction of granular sub-base by providing close graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per clause 401. (GSB) [ MoRTH - 4.1, 401A(i) ]
Annual Plan-316/25-Chellanam ward 11 Shutter Bridge road Construction Near Valiyaparambil House Joint venture Project General Civil Work
OD540195/2024-2025:MoRD OD (Modified 4.11.2) Granular sub-base/base/surface course with local materials (Table 400.13) by mix in place method normal. Construction of granular sub-base by providing local material spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at once and compacting with smooth wheel roller to achieve the desired density complete as per Clause 401.4 as per Technical Specification Clause 408. <br>(ii) Using Gravel mix soil.
Repair and protective work of the approach road of the small bridge located in km 1 of the Balrampur Bahraich road to Paigapur (Pyagpur) link road.
Mild steel or iorn work in plain work such as in reinforced concrete or reinforced brick work (when not included in over all rates) wrought to required shapes as necessary and bending for the proper coppletion of the work and including supply of steel and its wastage etc. and all labour and tools and plants required for proper completion of work Note: the steel shall be bent cold and bends hooks and authorised over lapping shall be measured.
Balance work of Pre-Cast Pre-stressed Bridge and Allied Works over Kocchi Barrage for Kanhan River Project , Tal. Saoner, Dist. Nagpur.
Balance work of Pre-Cast Pre-stressed Bridge and Allied Works over Kocchi Barrage for Kanhan River Project , Tal. Saoner, Dist. Nagpur.
Renewal work including general repairs for Kilometers 1, 2, 3, 4, 5, and 6 (765) of the Datawali-Gesupur road commencing from the Kali River Bridge on Garh Road
Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m as per Technical Specification Clause 301.5