Loading…
Loading…
27,967 results • Best match
Construction work of 4 x 4 M 5 cell box culvert in place of the old damaged mini bridge, approach road and additional approach road on the Madhya Gora drain of Bhadrak Bhudia Uda in Bareilly district. FY 2025-26
Repair to Bridge over Gambharia Nallah on 2nd Km of N.H-200 to Mahulakholi Road
... specifications for road & bridge works.(4th Revision)
Repair to HL Bridge over river Udanti at 2nd KM on Pwd road to Palna_Road_Repair to bridge such as minor repair to railing,expansion joint, painting along with repair to both side approaches _At 2.200 km
... 22-Jul-2026 12:48 PM Tender Title: Repair to HL Bridge over river Udanti at 2nd ...
Construction of bridge in the upstream of Gandhisagar Dam Project
Construction of bridge in the upstream of Gandhisagar dam project
Repairing of Bituminous Road Works starting from Railway Bridge upto Baralia Road at Ward No.13 under Habra Municipality
Construction of Pachor Soyat RR Jod to Purv Kachikhedi to Brahmankheda via Pashchimi Kachikhedi road length 5.00 km PAC 678.56 lacs First Call on Road and Bridge SOR 11-04-2025 work period 365 days I/c rainy season
Repair and Renovation of Rural Road with PCC Upar Pindra New Bridge to Upar Pindra Crossing Bridge Guardwall
Repair to Bridge over Sundar Nallah at 1.20 Km on Dungripali - Buddhikomna Road Road Pathole repair of approach road PMC and SC ,Colouring for the bridge portion 1.000 to 1.400
... specification for Road and bridge work.
Repair to HL. Bridge over River Mangalajore Nala on Jogipala to Sahajpati Road_Road_Repair to bridge such as minor repair to railing deck slab etc and painting along with approaches_0.00 to 0.500
... bars, near approaches to bridge/culvert and construction joints, admixtures as approved, ...
GENERAL -Bridge safety - Enath Bridge Providing Fencing using GI tube and welded mesh to Enath bridge Pathanamthitta - General Civil Work
CONSTRUCTION OF SUBMERSIBLE BRIDGE ON KHUNADARI
... sealant near approaches to bridge/culvert and construction joints, admixtures as approved, ...
Construction of Road From Arvind Vihar Setu to Bagmugaliya Extension Road Colony Road, Bhopal (Length 5.270 Km.) PAC 1185.21 Lacs First call on Road and Bridge S.O.R. wef 11-04-25 Work Period 150 days i/c rainy season
Construction of C.C. Road From Dronachal Sultania Infantry to Sanjeev Nagar Under Pass Road Length 3.550 Km. PAC 954.45 Lacs Second call on Road and Bridge S.O.R. wef 11-04-25 Work Period 365 days i/c rainy season
Execution of P Way work and construction of Bridge in connection with the work of dismantling of UP and DN main line cross over at both ends to eliminate DN main cum UP loop facility by provision of UP loop line and island passenger Platform at Garbeta (GBA) station.
Repairs to andbori to malakwadi bridge road VR 134 km 0/00 to 4/00 Tq kinwat Dist Nanded
Sub Work Providing and Preparation of DPR for Construction of Major Bridge across Penna River from Km 16/0 to 16/6 and Improvements to road from Km 13/6 to 21/6 of Kuderu Ramasagaram road via Jayapuram Budagavi and Ramasagaram Cross road in ... main work Construction of ... Major Bridge across ...
Sub Work Providing Confirmatory bores results for Construction of Major Bridge across Penna River from Km 16/0 to 16/6 and Improvements to road from Km 13/6 to 21/6 of Kuderu Ramasagaram road via Jayapuram Budagavi and Ramasagaram Cross road in ... main work Construction of ... Major Bridge across ...
Construction of Bridge Between Mada Morkha
... sealant near approaches to bridge/culvert and construction joints, admixtures as approved, ...
Repair and Renovation of existing Damaged foot bridge at Hartrath
Repair and Maintenance of Junaswada Foot Bridge at Mandrem Goa
Construction of foot bridge at kharey khola afathey
... 27-Nov-2025 11:33 AM Tender Title: Construction of foot bridge at kharey khola afathey ...
Construction Of Wooden Bridge At Lati Mohalla
... 22-Jul-2026 09:54 PM Tender Title: Construction Of Wooden Bridge At Lati Mohalla Tender ID: ...
Construction of H.L. bridge over Ghoghar Nallah on PWD road to Amlichuan road
... of over burden soil for bridge works in all kinds of Hard soil... Specifications for Road & Bridge works (5th Revision) & including ...
Construction of R.C.C Bridge at Thayumanasundaram street odai bridge in Ward No.58.
CONSTRUCTION OF BRIDGE AT BHAGWATKHEDI KATKATKHEDI TO BHAGORA ROAD
CONSTRUCTION OF BRIDGE AT BHAGWATKHEDI KATKATKHEDI TO BHAGORA ROAD
GENERAL-Bridge Safety-Rectification of Settlement in Approach Road of Nedungadu Nayarambalam Bridge in Vypin Constituency Bridge Safety-General Civil Work
Repair to Bridge over Ustalijore Nallah at 1st Km on Ratanpur to Jayantinagar road_Road_Repair to bridge such as minor repair to railing deck slab etc and painting along with approaches_0.00 to 1.500
... 22-Jul-2026 08:23 PM Tender Title: Repair to Bridge over Ustalijore Nallah at ...
Junction Improvement Works at Bhumia Mata Bridge in Meerut City
Work of new bridge of 3x5 m span in place of damaged bridge at km0 of Bharkhare to alipur
... 24-Mar-2026 03:15 PM Tender Title: Work of new bridge of 3x5 m span in place of ...
Construction of Wooden Bridge by UC Bullah
Construction of Wooden Bridge by UC Bullah over the Darakeswar ...
Balance work for Construction of 62.00 Mtr. Span Through Type Truss Bridge at RD 5/900 of road MRL22-Symbal Choya to Kanjli Chhapanoou, under package No. JK20-3011-B1, PMGSY-III (Batch-II, 2023-24), Block Reasi, District Reasi
Construction of Karond to Palasi Bhopal Length-3.00 K.M and Karond to Badwai Bhopal Length-0.30 K.M. PAC RS. 596.76 LACS First call on on Road and Bridge S.O.R. wef 11-04-25 Work Period 365 days i/c rainy season
GENERAL-Maniyar Bridge-Soil Investigation for Reconstruction of Maniyar Bridge under Ranni Constituency in Pathanamthitta District.- Investigation Work
... Detailed Project Report of the bridge works containing alignment plan, ...
GENERAL-Fencing work -CSIND - Providing fencing and allied works on the East side of Parvathy Puthanar at the ends of approach roads from Perunelli bridge to SM Lock and both sides of Kariyal thodu outlet in Puthenpally Ward
61/01. Construction Of Minor Bridge Across Odha Near Railway Bridge At Urali Kanchan Taluka Haveli, Dist.Pune
... PM Tender Title: 61/01. Construction Of Minor Bridge Across Odha Near Railway ...
REPAIR OF 54 MTR WODDEN SUSPENSION BRIDGE AT PASSER MARWAH
Emergent repair of road from Arapanch More to Gangajoar Bridge
Repair of Road from Jamberia Bridge to Andharmani Primary School
Construction of Krashi Upaj Mandi Badora Betul Back Side to NH-47 Road. Length 1.50 Km. PAC RS. 586.05 LACS First call on on Road and Bridge S.O.R. wef 11-04-25 Work Period 240 days i/c rainy season
Construction Three Submersible Bridges Across Kshipra River 1. Bridge on Mangalnath Sidhhawat Angareshwar 2. Bridge Parallal Piplinaka Chauraha to Bhairavgarh Road 3. Bridge Parallal to Narsing Ghat Bridge From Datt Akhadha to Narsing Ghat in Ujjain
Construction of Bridges in District Ujjain :- 1-Construction of Submersible Bridge Across Kshipra River on ...
Repair to Bridge over Chouki nallah at 6.00 km on MDR 39 Papakhaya_Road_Repair of bridge railing, Guard post and approach road_At 6.000 km
... Specifications for Road & Bridge works (4th Revision)
GENERAL-Destination Challenge at Chathamangalam GP-From Koolimad Bridge to Chettikadavu Bridge-General Civil Work
PROPOSED CONSTRUCTION OF ROAD WIDENING FROM - WARD NO.- 37 AT C.C. ROAD WORK, PATEL PARA NEAR BAJRANG CHOWK, JORATARAI, WARD NO.-38 AT C.C. ROAD WORK, DUMP CHOWK TO SHIV MANDIR, STORE PARA PURAINA, WARD NO-38 AT PAVER BLOCK WORK, UNDER BRIDGE TO DUMP CHOWK TRANSFORMER, STORE PARA PURAINA RISALI(C.G.)
Construction of Foot Bridge at Bohipora (access way) near Bohipora Bridge (fresh Tender)
Construction of Bhopal Vidisha road (Near Dabar House) to Jamuniya via village Balampur (old Bawadi) Road Length 4.90 Km. PAC 562.95 lacs Second Call on Road and Bridge SOR 11-04-25 work period 300 days I/c rainy season
Repair to Bridge Over River Gobari on Sampur to Nuapada Road_Road_Repair of Bridge such as Railings, Deck Slab, Colouring and Approach road-BT-At 2.300 km
... Specifications for Road & Bridge works (4th Revision).
Emergent repairing and maintenance of protection work of Dharaikuri river bridge of Mallickhat Sitapara road at km 2.20
Restoration and Repairs of Community Toilets near Community Hall & Railway Bridge Dharmapeta, Ward no 47.
Restoration and Repairs of Community Toilets near Community Hall & Railway Bridge Dharmapeta, Ward no 47.
Construction of Foot Bridge at Dildar