Loading…
Loading…
5,106 results • Best match
RECONSTRUCTION OF DRAINAGE FOR CO-OPERATIVE HOSPITAL ROAD (RENOVATION)
Bid Documents for Annual Rate tender for Water Supply And Drainage Work For Maliya(m) Nagarpalika Maliya-morbi (2nd attempt)
As per Atteched File Of of Gujarat Water Supply & Sewerage Board SOR SOR All
Survey, Investigation and Preparation of DPR). (DEPOSIT WORK).
Survey and investigation work for providing a sewerage scheme to the National Institute of Fashion Technology (NIFT), Kangra, District Kangra, Himachal Pradesh, shall be carried out using advanced survey technologies, including Differential Global Positioning System (DGPS) and Total Station, with a precision limit of 0.5 cm. The scope of work includes preparation of a nodal plan for the sewerage network, preparation of a site contour plan for the Sewage Treatment Plant (STP), measurement and documentation of unit dimensions of existing infrastructure, geotagging of households, marking of proposed sewerage alignments, and preparation of longitudinal sections (L-sections) and cross-sections (X-sections) as required based on site conditions. A reconnaissance survey shall be conducted for the preparation of a digital contour plan with a contour interval of 1.00 meter, clearly showing features such as houses, HT lines, roads, and other major benchmarks as required. Contour plans for the sewerage system at various locations shall be prepared in accordance with the latest norms, along with detailed engineering drawings. All drawings shall be prepared using AutoCAD, and a total of four (04) sets of drawings shall be submitted in both hard copy (properly bound) and soft copy formats, complete in all respects, as per the directions of the Engineer-in-Charge.
As per NIT
Excavation in foundations trenches etc. in earth work in all kinds of soil such as pick work, jumper work, blasting work in hard/soft rocks, chiseling / wedging out of hard/soft rock including dewatering in saturated soil up to all leads and lifts stacking the excavated soil/materials not more than 3 meters clear from the edge of excavation and then returning the stacked soil in 15 centimeter layers when required into plinths side of foundations etc., consolidating each deposited layer by ramming and watering and then disposing of all surplus excavated earth within all leads and lifts as per the direction of Engineer-in-Charge
Regarding the laying of a new drainage line in place of the damaged drainage line in South Gadarkhedi under Zone No. 01, Ward No. 09.
Regarding the laying of a new drainage line in place of the damaged drainage line in South Gadarkhedi under Zone No. 01 Ward No. 09.
Under Zone No. 22, Ward No. 36, lay a new drainage line on Rewa Farm main road and connect it to the main drainage line.
Under Zone No. 22 Ward No. 36 lay a new drainage line on Rewa Farm main road and connect it to the main drainage line.