Loading…
Loading…
10,844 results • Best match
Renovation of electrical installation work including laying of incoming power cable at PWD Tent
Laying of one No. 4core 95sqmm cable through micro tunneling with 80 mm OD HD PVC ( 5 mm Thick ) pipe at suitable depth (3 meter below the ground ) and laying the cable through the pipe by cutting entry prockets at both ends a depth of 1 mtr and 0.3 mtr width and making masonary pit at both ends by brick, sand , cement etc incl. top cover as required as per direction of EIC.
ELECTRICAL WORK UNDER BUSINESS PLAN IN JURISDICTIN OF EDD DALMAU
Earthing Complete of Pole by MS Earthing Rod 20X2500 mm and 6 SWG earthing Wire etc.
ELECTRICAL WORK UNDER BUSINESS PLAN 2026-27 IN JURISDICTION OF EDD LALGANJ
Earthing of PCC/ST Pole, with Earthing Rod 20x2500 mm, and 6 SWG Earthing wire etc.. As per RESPO Norms.
ELECTRICAL WORK UNDER BUSINESS PLAN 2026-27 IN JURISDICTION OF EDD UNCHAHAR
Earthing Set For Earthing of Pole , MS Earthing Rod 20X2500 mm with 6 SWG wire etc..
ELECTRICAL WORK UNDER BUSINESS PLAN 2026-27 IN JURISDICTION OF EDD DALMAU
Cartage of other related Loose Line Materials, as Top Channel,s/s base Channel,Disc Insulators with fittings,Earthing set Complete, Stay set complete,ACSR Weasal Conductor (130 Mtr) Pin Insulators with fittings,T-OFF Channel, 11 KV Cross Arms,3 Phse AB Cable 50 sq.mm (200 Mtr), Dropper Channel and Three Phase Distribution Box from ESC Tripula to work site with loading- unloading and proper stacking at a Place. as per above Village.
ELECTRICAL WORK UNDER BUSINESS PLAN 2026-27 IN JURISDICTION OF EDD LALGANJ
Labour Charges for earthing of 250 KVA 11/0.4 KV Power Transformers completed for digging of 60 fit Borewell type pit (1.5-inch diameter) to install 60 fit long M.S. Pipe (60 fit long) with 1.5-inch diameter work followed by connection of M.S. Stirp 50X6 mm size for Suitable length to G.I. Pipe through proper welding ( Aluminium paint covering of welded joint) with tightening of nuts & bolts and fitting of spaces by homogeneous mixture of coke & sault against medium power transformer body and neutral earthing these includes connection of M.S Strip fot sepret common pit as there will be one pit of each earthing. All required material will be provided by contractor.