Loading…
Loading…
10,888 results • Best match
Custom Bid for Services - SERVICE ORDER FOR VRMP GENERAL ELECTRICAL WORKS AT VR Similar Category Operation and Maintenance Of Electrical Systems/Electrical Installations
Custom Bid for Services - SERVICE ORDER FOR VRMP GENERAL ELECTRICAL WORKS AT VR Similar Category Operation and Maintenance Of Electrical Systems/Electrical Installations
GENERAL-PWD Rest House Kozhikode -- Electrical Maintenance works at PWD Rest House Kozhikode-General Electrical Work
Electrical Maintenance works
Custom Bid for Services - COMPLETE ELECTRIFICATION WORK FOR 28 GOVERNMENT SCHOOL Similar Category Operation and Maintenance Of Electrical Systems/Electrical Installations
Custom Bid for Services - COMPLETE ELECTRIFICATION WORK FOR 28 GOVERNMENT SCHOOL Similar Category Operation and Maintenance Of Electrical Systems/Electrical Installations
Civil and Interior work, plumbing work, Electrical works, Furniture etc
1.10 modular switch, modular plate, suitable GI box and earthing
Electrical installation work for New Fire Pump station to be installed adjacent to the existing old pumping station and the existing pond in the campus of IPGMER-SSKM Hospital, Kolkata
Supply & Installation of floor cum wall mounted cubicle type indoor compartmentalized panel size 9000mm(L) X 1200mm (H) X 350mm (D) or as per requirment , 415V., 50 Hz. dust & moisture proof LT Distribution panel board with following electrical accessories fabricated from 14 SWG CRCA sheet with MS angle frame as required. The base of panel should be made with MS channel & Angle. The panel should have adequate strength & space to accommodate the incoming & outgoing switches and with all interconnection in between the switches and changeover switch with copper flat / flexible wire of suitable capacity. The panel should be provided with cable alley for facilitating connection of all the incoming & outgoing XLPE Cables with termination arrangement by S&F copper terminal stud / bolt of required sizes. The panel with earthing attachment is to be painted with powder coated paint as per direction of EIC. The panel board should consist with the followings:- [ To be installed at New Fire Panel Room]
Civil and Interior work, plumbing work, Electrical works, Furniture etc