Loading…
Loading…
47,863 results • Best match
Repairing of VCT Boiler No. WBL-6035 at Madhaipur Colliery under Pandaveswar area and Repairing of Boiler Injector and steam Pipeline 9, 1, 5 and 6 Pit of Madhaipur Colliery
New Shell extension plate & angle rolling, bending, fabrication & same position fitting welding, grinding, dressing smoothly (Material Cost)
Hadapsar-Manjari kshetriy karyalaya antargat prabhag kr.17 madhil nirniralya pathavaril khadde durusti karane.
1.00 SHREE ABHI CONSTRUCTION AND FABRICATION (GSTN-27AVOPT9247P1Z9) BID ID -7349782 558753.000 -27.900 402860.910 Four Lakh Two Thousand Eight Hundred and Sixty
Pr.Kr.17 madhye concretikarnachi va farashichi kame/pevingchi kame va dekhabhal durusti karane.
1.00 SHREE ABHI CONSTRUCTION AND FABRICATION (GSTN-27AVOPT9247P1Z9) BID ID -7349801 438620.000 -28.900 311858.820 Three Lakh Eleven Thousand Eight Hundred and Fifty Eight
Water cooler installation work in Kamlapur Primary School.
Fabrication of angle frame and Iron work etc all comp.
AS PER BOQ
... clamp, nuts, bolts & washers. Fabrication and fitting of well cap. ...
Supplying, Installation, testing and commissioning of Mono Rail Beam suitable for 5 MT loading at entrance of pump house at 12 MLD WTP Assonora. (2nd Call)
Supply, installation, testing and commissioning of suitable Monorail Gantry of length 8.5Meter suitable for loading of 5MT along with special bracings and necessary fabrication.
MTPS I BM UNIT I Boiler pressure parts AOH 2026 Rectification of buck stay beam and supports renewal of worn out buck stay pin and allied works
Charges for fabrication of 900mm length x 600 mm ...
Repairing/ Strengthening of Supporting structure for cable (60 mtr) in loading section from drive end of unit 901 to roof of section office at Moonidih Coal Washery.
Dismantling of damaged cable tray, fabrication of 60 mtr long cable tray with 50mm X 50mmX6mm MS Angle channel flats etc and assemble of cable tray
Deposit
... wire 6 SWG after providing, fabrication and fixing of guarding angle and fabrication and fixing of X-guards (Tillis) ...
Installation of Starter Panel and allied electrical items for operation of newly installed Pump-set No.3 at Tilak Vihar BPS and Pocket Aand B Block BPS in Tilak Nagar Constituency.
Fabrication and Supply of Star Delta ...
Refurbishment work at Lecture hall 4th floor at NHTC building in Dr. R. N. Cooper Hospital.
... specifications and approved fabrication drawings (which are to be... paint of 30 microns after fabrication including touching up with ...
Extension/Diversion and Dismantling of Feeder 12 in view of pump installation and providing space to hasdiha 5 in the mines under Sonepur Bazari Project.
Supply, fabrication, hoisting and erection of phase and earth bracket and painting with red oxide primer
Extension/Diversion and Dismantling of Bhatmura Feeder 2 above Sudama Shovel in the mines under Sonepur Bazari Project.
Supply, fabrication, hoisting and erection of phase and earth bracket and painting with red oxide primer
Emergency repairs to damaged OT sluice shutters of Dulla vagu, Pedda Cheruvu, Edulla Cheruvu and Kattu varigudem Cheruvu in Kallurigudem (V), Gandravari Cheruvu and Deekshithitula Kunta in Venkatapuram (V), Yathavari Kumta in Laxminarayanapuram (V), under Ammapalem Section of ISD-2, Vemsoor (M), Khammam Dist (2nd Call)
OT Sluice Gate: Fabrication, supply, erection, testing ...
Nagercoil Corporation Providing Storm water drainage Cover slab at MGR nagar in ward no.35
Supplying, fabrication and placing in position ...
Construction of Segregation shed with Paving at Vepoor H/O Vepoor Panchayat
Provision for steel tube 60.3mm OD & 3.6MM tk including fabrication and all labour charges for erecting etc complete
Construction of the road from the IIM Road main route to Anandi Mata Mandir, passing through Madhupuram Colony (Bhithauli Khurd) in Faizullaganj Ward No. 4.
M S Fabrication work
Construction of a road and drain in the colony located off Dudoli Road (in the Priti Nagar/Rahim Nagar area of Faizullaganj Ward No. 4 behind Shakuntala Building Material) extending from the colony main entrance at Shakuntala Building Material
M S Fabrication work
Construction of a road and drain in Mathura Vihar Colony, Lohramau (under Faizullaganj Ward No. 4), stretching from Akhilesh Kumar house, past Chandraprakash Verma house, up to Mullaji shop.
M S Fabrication work
NCTPS I SE MI circle RM 26 27BM DnUnit III Strengthening of corroded Damaged supporting structures in boiler walk way and operation platform at 16 Mtr to24 mtr and renewal of existing floor grill hand rails and Painting structures in 1st pass
Charges for fabrication and erection of damaged ...
Supply and installation of new air conditioning units and other equipment to replace the old air-conditioning units and equipment in Suites No. 1A 1B through 3A 3B and the meeting hall at the Transit Hostel Circuit House in Mainpuri district.
Fabrication of M.S stand for Outer unit of A.C withfixing on wall with all material & labour complete in all respect
NCTPS II M-I Circle - BM - Unit-II - AOH 2026-27-Replacement of the severely eroded and damaged C1, C2, D1 D2 stream Splitter assembly in flue gas duct at ESP inlet
Charges for fabrication and erection of Splitter assembly in flue gas duct ESP inlet. Including cost of consumables and T&P’s (The required material is under contractor scope).
NCTPS II M-I Circle - BM - Unit-II - AOH 2026-27-Replacement of the severely eroded and damaged A1, A2, B1 B2 stream Splitter assembly in flue gas duct at ESP inlet
Charges for fabrication and erection of Splitter assembly in flue gas duct ESP inlet. Including cost of consumables and T&P’s (The required material is under contractor scope).
N.I.T. No.10 EE(SDW)-XI 2026-27 ITEM NO. 2
Fabrication of U shaped protection cage from MS Flat 50mm X5mm dully welded along with wire mesh by cutting welding, grinding and making it in complete shape as per site requirement.
Nagercoil Corporation Constructionn of CC Pavement in Maps street, WCC cross street and Cave cross street at ward 23
... reinforcement grills and fabrication charges but including curing ...
Construction of Check dam across Halla near Bedar Budihal village of Badami Taluk, Bagalkot District. (Reserved to SC Category)
Design, fabrication, supply, erection and commissioning ...
Sindh Nallah - Flood Protection work on R/S at Village Shallabugh at RD 90.80 KM to 90.91 KM
... 100 mm) including proper fabrication , weaving, binding and testing ...
Repairing and Testing work of ENA-II Road WB and Dhansar Road Weighbridge-II under Kusunda Area
Fabrication of raw guarder collected from Regional Store as per shape and size of separated guarder and welding of points.
Tree trimming and replacement of damaged pole and related work of workshop feeder under Sonepur Bazari Project.
Supply, fabrication, hoisting and erection of phase and earth bracket and painting with red oxide primer
Laying of 100mm dai M.S Pipe B-Class ISI Mark at J Rishi house to Badi masjid Hnuman Mandir Paper mill Road Near of Bhatta Colony Ward 39
Fabrication with fitting of 80mm /100mm Ø M.S Band/elbow/Z complete.
Development of Centre of Excellence in Welding of Bridge Girders at Central Engineering Workshop Manmad.
Fabrication, Supply and testing and commissioning of Welding booth with table, curtain, stool as per specification attached.
Emergency Maintenance of 11KV overhead line near No 9 Pit sand bunker and repairing of 440V overhead line near 5 and 6 pit of Madhaipur Colliery
Supply & Fabrication Fixing MS Bracket (MS Angle 65mm X6mm 7 feet size
1. Reparing and rewinding of 112-kW, 550Volts, 1470 -RPM, MP make Sq. induction Motor for MMV fan and 40HP, 550V, 1470-RPM, induction Motor of Dhemomain Incline Colliery under Sodepur Area.
Cost of fabrication of wooden forma.
Providing Fencing to Kamaraj Nagar OHT Ward No 01 Seenivasapuram OH T Ward No10Weekly Shandy OHT Ward no17 in Avinashi Municipality
... as welding,grinding and fabrication charges, cost and conveyance ...
Replacement of Pumping main pipeline of Sri Satya Sai CPWS Purushothapatnam from Indukuripeta pumphouse to Gokavaram village, Est. Cost: Rs. 20.00 Lakhs , SDRF Grant
... including cost of all materials, fabrication charges, loading at Manufacturing ...
Maintenance and repairing of 440V O/H line at coal dump colony, chhotki Bauwa colony, Visthapit colony and new Dhobi Kulhi colony at GKKC under Kusunda Area.
Erection of metallic pole of 6.5 to 8 mtr. long in cement concrete 1:3:6 foundation including excavation and refilling etc. as required after fabrication.
Maintenance works (Both Civil and Sanitary Plumbing) to the Bhawanipur Guest House of the University of Burdwan (3rd Call)
Labour charge for fabrication and installation of composite... alloy aluminium sectios, fabrications, including cutting to proper ...
Annual Maintenance Work of Structural Portion at Prafulla Chandra Sen Government Medical College and Hospital, Arambagh under Hooghly Construction Sub-Division No- II, P.W.D. under Hooghly Construction Division, PWD during the year 2026-2027.
Labour charge for fabrication and installation of composite... alloy aluminium sectios, fabrications, including cutting to proper ...
Emergent Repair and Rehabilitation work of Verandah in front of C1 and C2 Ward inside the periphery of Burdwan Central Correctional Home at Purba Bardhaman under Burdwan Division, P.W.D.
... requisite shape & size, fabrication including metal arc welding conforming to ...
Strengthening of Additional Infrastructure Facilities to Existing KGBV Building at Kaddam (V) Kaddam (M) in Nirmal District NABARD-RIDF-XXIX
... etc.,complete but excluding cost of steel and its fabrication charges for finished item ...
Proposed 2 Lane Road Over Bridge in lieu of LC No.376 along with LUS at Km 455/800-900,1X42.0m steel Bow string girder between Vellanur and Pudukottai Stations.
completeassembly to be of cast steel/ fabricated structural steel,metal and
03/2026-27
... aggregate in the ratio 1:3:6 and fabrication of structure complete.
Increasing Capacity work of 09 Nos of different T/F and Installation 07 Nos of New T/F under 33/11 KV S/S Patrampur, EDSD(Second), Jaspur under the Head of Capital (SI).
Fabrication of Steel
Construction of additional class rooms in the existing Govt. High School Film Nagar, Jubliee Hills under Core Urban Region Economy in Hyderabad District
... etc.,complete but excluding cost of steel and its fabrication charges for finished item ...
Construction of additional class rooms in the existing Govt. PS Jafarguda, Jafarguda under Core Urban Region Economy in Hyderabad District
... etc.,complete but excluding cost of steel and its fabrication charges for finished item ...
Construction of additional class rooms in the existing GOVT. PS (B) Umdabazar, Umdabazar under Core Urban Region Economy in Hyderabad District
... etc.,complete but excluding cost of steel and its fabrication charges for finished item ...
Construction of additional class rooms in the existing Govt. High School Rajbhavan, Khairtabad (M) under Core Urban Region Economy in Hyderabad District
... etc.,complete but excluding cost of steel and its fabrication charges for finished item ...
Construction of the Security room at the entrance of the Hostel & Construction of Rest room near the College security Room in SV Junior college. Tirupati
... charges, but excluding cost of steel and its fabrication charges for finished item ...
Construction of additional class rooms in the existing GOVT. PS Redcross, Masab Tank under Core Urban Region Economy in Hyderabad District
... etc.,complete but excluding cost of steel and its fabrication charges for finished item ...
Construction of additional class rooms in the existing Govt. High School Chowrahjinsi, Touchowki, Near Sana Hotel, Shaikpet (M) under Core Urban Region Economy in Hyderabad District
... etc.,complete but excluding cost of steel and its fabrication charges for finished item ...