Loading…
Loading…
28,836 results • Best match
NIT 09 Work of Fabrication at RWSS Scheme in Section Mahwa
Providing, Fabrication of Mild Steel Plane Ended/ Flanged Specials like Tees, Bends, Reducers, Enlargers, Plugs, Tail Pieces and Blank Flange made from MS pipes, MS sheet strip and MS Sheet of required sizes by welding, cutting and treading as per site conditions and as directed by the Engineer- In- Charge complete in all respect.
Dismantling and erection, transporting, repairing, strengthening and fabrication of the weighment platform structure of KDH Road weighbridge No.- 01/Purnadih WB No. 03, Make ORION, Sl. No.- 13P-1302 along with installation of Lightning arrestor a
Structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete.
A)Fabrication, Erection and fitting of unit no. 215 crusher (impact crusher) outer body lining using 10 mm plate, (B)Fabrication, erection and fitting of unit no. 215 crusher motor base support using 16 mm plate C)Fabrication, erection and fitting of
A) Fabrication, Erection and fitting of unit no. 215 crusher (impact crusher) outer body lining using 10 mm plate Rigger (2 head x 2 shift x 10 days)
Repairing and fabrication of Drag Rope Tray and Fabrication of Drag Chute of Drag Drum of 24 96 Saurav and Gaurav Draglines working at Bina Project.
Inviting of bids through Central Public Procurement Portal (CPP Portal) for temporary construction of Hangar structure/auditorium, fabrication of Stalls/Pagodas using octonorm system, installation of electrical fittings, PA system, etc. on hire basis
Pagoda (5mtr.x5mtr.) structure on double plywood platfaorm/ Wooden Platform on iron frame with covering of synthetic needle punch with new laminated printed carpet of good quality, 4 LED Metal light (each of 200 watts), one octonorm table/wooden steel table (with frill) for counter 2 visitor chairs 2 multi-plug power point(four point), one new Dustbin along with the fascia (Design to be provided by NBT).
Repair and Overhauling Service - Chair Office (V2); Overhauling of Yoga Training Section at RVC Centre and College, Meerut Cantt by Supply, Fabrication and Installation of Metallic Cladding (Approx 2200 Sq Ft); Yes; Buyer Premises
Fabrication and Installation of Metallic Cladding (Approx 2200 Sq Ft); Yes; Buyer Premises