Loading…
Loading…
234 results • Best match
Revamping of selected outdoor and indoor HVAC units (Daikin Make) at IIT Patna
Supply and refilling of R-410A refrigerant after performing a proper nitrogen purge and vacuum, including necessary brazing, testing, and commissioning to ensure full operational condition of the HVAC system
HVAC WORK AT CONSTRUCTION OF Sub DISTRICT- HOSPITAL IN RAJGARH (CHURU) , RAJASTHAN
HVAC PANELS
Installation Commissioning and Testing of HVAC Compressor 4 nos at BHS Platform
Installation, Commissioning & Testing of HVAC Compressor (4 nos) at BHS Platform
Electrification and HVAC works to Chairman Chamber and Board Room at Administrative Office Building
VRV_OUTDOOR_UNITS - 20HP Lifting, Installation, Testing & Commissioning of inverter /Digital scroll air cooled compressor( multiple compressor preferably not less than 2) with Variable refrigerant system connectable to multiple indoor units. R410a Refrigerant flow rate respond to variations of the air conditioning load of the room, Outdoor unit shall be factory assembled weather proof casing constructed from heavy gauge mild steel panels. The unit shall be completely factory wired and tested with necessary controls and charged with refrigerant. The compressor shall be highly efficient Rotary/scroll type multi compressor for 16HP and more than 16HP machines. The Bluefins shall be covered with anti-corrosion resin. Unit shall be equipped with oil recovery system to ensure stable operation with long refrigerant piping. Units shall be tested and commissioned with additional refrigerant. Refrigerant shall be CFC free refrigerant suitable to green building requirement. Machine COP not less than 3.5, Including rubber pads for outdoor units etc. Including rubber pads for outdoor units etc, Required Blue fines shall be part of this line item. 415 V+/- 10%, 50 Hz, 3 phase A/C supply. All the MS Related work Shall be part of this line item, MS Related work SHOULD BE PAINTED WITH 2 COATS OF ANTI CORROSIVE PRIMER & 2 COATS OF EPOXY PAINTS shall be part of this line item, required scaffolding work shall be part of this line item, and fabrication works shall be part of this line item. Machines shall be derated to 36.11 Deg c. Contractor Should consider all kind of Clearance charges, transportations, transport insurance, loading, unloading & shifting to the respective places as per HVAC drawing. Machine shall have drain tray with drain provision to connect to nearest drain point. Required refrigerant gas shall be added part of the quote.
Maintenance of low side HVAC equipments with accessories at Mod. Labs, BARC, Trombay, Mumbai - 400085.
3.2.1 Similar Works means: Maintenance of HVAC systems or Supply, installation, testing and commissioning of HVAC system or Combination of both
COMPREHENSIVE ANNUAL MAINTENANCE CONTRACT FOR VARIOUS HVAC EQUIPMENTS INSTALLED AT REGIONAL CANCER CENTRE THIRUVANANTHAPURAM
Amount for Comprehensive annual maintenance contract for various HVAC equipments (list attached as annexure-1 of the tender document) installed at various locations of Regional Cancer Centre, Thiruvananthapuram including all labour, materials, consumables etc. for a period of one year