Loading…
Loading…
17,793 results • Best match
MTPS I BM Unit II Boiler pressure parts COH 2024 Supply and installation of Air sealants in penthouse to avoid ash leakage air ingression to the boiler and allied works
Installation of air sealants in penthouse area, riser tubes of all steam headers and drum riser tubes and expansion area of Unit-II boiler.
Refer to BOQ
Dismantling G.I. Pipe (External work) including excavation and refilling trenches after taking out the pipes manually by mechanical means including stacking of pipes within 50 mtrs lead as per direction of the Engineer in charge a) 15mm to 40mm nominal bore.
Refer to BOQ
Dismantling G.I. Pipe (External work) including excavation and refilling trenches after taking out the pipes manually by mechanical means including stacking of pipes within 50 mtrs lead as per direction of the Engineer in charge a) 15mm to 40mm nominal bore.
Refer to BOQ
Dismantling G.I. Pipe (External work) including excavation and refilling trenches after taking out the pipes manually by mechanical means including stacking of pipes within 50 mtrs lead as per direction of the Engineer in charge a) 15mm to 40mm nominal bore.
Customized AMC/CMC for Pre-owned Products - DRG325S173 Trunkey Major Overhauling and Maintenance of Gas Turbine Generator 4 at CPP Digboi Refinery; BHEL; Annual Maintenance Contract (AMC); Annually; No
Customized AMC/CMC for Pre-owned Products - DRG325S173 Trunkey Major Overhauling and Maintenance of Gas Turbine Generator 4 at CPP Digboi Refinery; BHEL; Annual Maintenance Contract (AMC); Annually; No
Routine Periodical and Breakdown mechanical maintenance at Kuttalam GTPS for 1 year
PREVENTIVE & REGULAR MAINTENANCE OF CENTRALIZED A/C COMPRESSORS & AIR HANDLING UNITS :-1) A/c Compressor : 2 Nos. 2) Air Handling Unit : 2 Nos. 3) A/c Condenser : 2 Nos. Routine check of Centralized A/c Compressor & Air Handling Unit for Oil leak, gas leak, air leak, abnormal sound, abnormal vibration, gas pressure variation, oil pressure variation, ice formation and attending the corrective action as per the direction of Engineers in - Charge. Up-keeping of the above equipments by thorough external cleaning and removing of dust and dirty oil, oil fumes, etc., and keeping the floor of the house clean and tidy. Checking the system pipe lines etc., using soap water for any leak , charging gas in the compressor, checking the belt tension, if necessary replacement of belt & alignment in AHU / A/c compressor, topping up of lube oil for compressor, external cleaning of condenser, removing the AHU water drainage pipe chocking if necessary and any other minor unforeseen works related to the mechanical maintenance of the system as directed by the Engineer in - Charge.