Loading…
Loading…
17,093 results • Best match
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - ONBOARD INS JALASHWA; RENEWAL OF MECHANICAL SEAL OF 2B MAIN FEED PUMP AS PER SCOPE OF WORK; Service Provider
and Installation of Plant Systems/Equipments (Version 2) - ONBOARD INS JALASHWA; RENEWAL OF MECHANICAL SEAL OF 2B MAIN FEED PUMP AS PER SCOPE OF WORK; Service Provider
Maintenance of various Electrical and Mechanical Services at Thyagraj Sports Complex, New Delhi. (SH- SITC of additional Tower Type Air Conditioning units and related EI work at UPS Room)
Supplying, Installation, Testing and Commissioning of Air Cooled Floor standing Tower type split Air conditioners complete with Indoor unit(IDU), Out door unit (ODU), surface / concealed copper Refrigerant piping with insulation (closed cell elastomeric nitrile rubber tubular pipe section) upto 5 Mtr (IDU to ODU), copper power cable upto 5.5 Mtr (IDU to ODU), i/c drain pipe of suitable length and size. R-32/R-410/R-407C Green Refrigerant, wireless Remote control, suitable for working between 180-260V with low & high voltage cutoff and 50 hz ,1 phase AC supply capable of performing cooling, dehumidification, air circulation of following capacity with Scroll / rotary with min 5 year Original Equipment Manufacturer (OEM) warranty both compressor and Printed Circuit Board (PCB). as specified. The system shall be able to deliver 100% of the rated capacity as per relevant IS Code. The lab testing reports as per IS: 1391 shall be submitted from National Accreditation Board for Testing and Calibration Laboratories (NABL) accredited as per International Electrotechnical Commission (IEC) 17025 standards / Central Power Research Institute (CPRI)/ Electrical Research and Development Association (ERDA)with Original Equipment Manufacturer (OEM) etc. complete as per CPWD specification and as per IS: 1391 as required. Cooling Only
Operation and routine maintenance of electrical & mechanical at ICMR-NARI, Bhosari, Pune. SH: Repalcement of damaged drinking water pump sets, refilling of fire extinguishers and Colling Tower related work.
Central Public Works Department
Standardization of rates for dismantling, fabrication and erection of pipes and pipe fittings at TNPL Main site and LSFM for the year 2025-2026.
Cleaning the Roof Tops of various buildings such as Power House, Ash Handling, Boiler, Bunker ESP 4 and 5 Control Room CWPH 2 of Unit 4 and 5 at EL 3.00m to 52.80 m and clearing away the deposits to far off places for the period from 01.04.202
Repair and maintenance of insulation works of Boilers and turbines during shutdown at TPS in Barauni Refinery.
Total Items details of "Repair and maintenance of insulation works of Boilers and turbines during shutdown at TPS in Barauni Refinery".