Loading…
Loading…
2,468 results • Best match
Track Work-Development of Track Machine alongwith infrastructure at Lasalgaon, Kajgaon, Dhule, Bhadli, Bodwad, Paras and Borgaon. (IRPSM ID- 01.01.31.25.3.10.005) WP 2025-26 PH-31
500.00 prescribed in latest edition of IRPWM including cess dressing on both sides of track. The work will include removing excess ballast from track and putting the same in crib and shoulder by leading to a maximum of 50m including crossing of track, deweeding on ballast section etc and as directed by Engineer-In charge. Unloading of ballast from Railway's Hopper Wagons, quantity distribution as per pre-defined site requirement, clearing infringements/jammed ballast, distributing the unloaded ballast uniformly over the track, profiling and boxing following all prescribed safety norms.
Urgent shifting of the 200 mm dia Manora taping and pipeline approaching in the alignment of the proposed 1200 mm dia new MS pipeline under Salaulim Water Supply Scheme.
Supplying at store or site of work including railway freight carting loading unloading stacking etc. Ductile iron Sewage double flanged manually operated Sluice Valve generally conforming to IS : 14846 - 2000 having body door dome gland in graded cast iron to IS:210 Gr. FG 260 four faces and spindle nut of leaded tin bronze to IS:318 Gr. LTB 2 inside screw of non-rising stainless steel AISI 410 IS 6603 GR 12 CR 12 spindle Flanges drilled to IS:1538 Table 4 & 6. Valves tested by closed end method only (350mm and above will be fitted with BTB and gear box. and back seat bush.) TYPE P.N. 1.6 (Class A );Dia in mm;200
Provision of Indoor and Outdoor signalling work in connection with IBS at 05 Locations between BDKN-SLN, SLN-PKX, MBDP-PHV, RBL-RUM & RBL-GANG section, addition & alteration in existing Electronic Interlocking system at Sultanpur, Pakhrauli, Maa ... signalling works at ...
Elevation & distance of foundation from track shall be in accordance with schedule of dimension for Indian Railways and as per NR practice. All items for the above works except Signal unit, LED signal, Signal post, Base and Ladder shall be supplied by the contractor including but not limited to the following: i) "U" bolt for offset brackets, ii) Wooden cross arm 1 mtr. x 1 mtr., iii) MS angle and MS sheet for blanking of ladder, iv) Supply and fixing of signal number plate (Retro reflective) with complete fittings as per standard railway practice. v) Wire mesh guard, lock for unit if required, nuts, bolts etc., for the following: (a) Installation, erection, wiring of 2 aspect color light signals.
Carrying out Zone works for period ending 30.06.2027 in Zone No-12 Kasganj (inclu.) to MHA (Excl.) up to km 253/0 KSJ (incl.) up to km 417/0 and Jafari, Malgodam colony KSJ.
Operation of all required sluice valves at Colony/ Per station including supplying valvemen to provide Month timely water supply in Railway colony both in day and night shift i/c visiting all pump houses to see whether they are runningor not and informing to SSE/W. Visiting Over head tanks to see they are filled full or not, also visitng all times during valve operation in colony to water is being supplied in Rly. Qtrs and remain all time alert complete with all man-power,T&P,GST taxes etc. (Total 02 person require per day each in day and night shift)
Carrying out Zone works for period ending 30.06.2027 on Zone No-13 Kasganj LC NO.310 to PTI (Incl.) up to km 204/0.
Operation of all required sluice valves at Colony/ Per station including supplying valvemen to provide Month timely water supply in Railway colony both in day and night shift i/c visiting all pump houses to see whether they are runningor not and informing to SSE/W. Visiting Over head tanks to see they are filled full or not, also visitng all times during valve operation in colony to water is being supplied in Rly. Qtrs and remain all time alert complete with all man-power,T&P,GST taxes etc. (Total 02 person require per day each in day and night shift)
Provision of 07 Nos. Electronic In-Motion Weighbridges(EIMWBs) over Chakradharpur Division.
Modification/Alteration (Electronic Interlocking) as per latest RDSO Alteration guidelines & TAN. It includes: Design and modification in existing Interface, Interlocking circuits and logic of EI system including modification in the VDU (Video Display Unit)/ LCP (Local Control panel), CCIP (Control cum Indication Panel) if any, Maintenance terminal (MTPC), Data Logger, Relay rack wiring etc. The complete work should comply with the latest RDSO specifications, guidelines and as per approved SIP & circuit diagrams. All the material (Interface cards/ relays/ wiring material/ connectors/ fuses /communication devices etc.) shall be provided by the contractor. The work includes the supply of modified Selection table, Interface Circuits, VDU/LCP, CCIP diagram if any etc. to suit the modified SIP. It also includes the carrying out of FAT, SAT or two rounds FAT (as applicable) jointly with Railways and satisfactory commissioning. All plans/drawings/circuits etc. should be prepared on Auto CAD. Soft copy including Auto CAD copy has to be supplied in pen drive and 06 sets of hard copies also to be supplied as a completion drawing. (a) Alteration involving modification in upto 10 routes. (For Bimalgarh, Lathikata EI Alteration) Bimalgarh & Lathikata- SIEMENS(Make). Total 3656562.00