Loading…
Loading…
2,038 results • Best match
Zonal work for General repairs and maintenance of service buildings, staff quarters and others new minor works etc. at Gholeshapur Railway Colony, sports complex and Swimming Pool under Senior Section Engineer /Works/ Gholeshapur in the jurisdiction ... / Works /II ...
A-Miscellaneous lump sum works covering all the chapters of the DSR [Ver-1]- Above/
Supply, Installation, Commissioning and Testing of Quick Watering Arrangements System at Ranchi and Hatia Railway Stations.
A-Supply, Installation, Commissioning and Testing of Quick Watering
Construction of link road in Shivalik Colony Ratnu Chak near Railway Track by way of providing and laying of RBM Filling, WBM-II, WMM and Macadamization (Under UT-Sector)
Providing and laying River Bed Material on the road surface by way of spreading the same in uniform layer not exceeding 20cm in depth, watering and compacting with vibratory power road roller of 8-10 Tonne capacity including carriage of material from source to site of work (all leads, lifts complete). The measurement is to be taken of compacted / finished work.
Construction of Road work and Bathroom in Multipurpose Ground Jassian Road Near Railway Line Ludhiana
Earth work in excavation in foundations trenches etc. in all kinds of soil where Pick-Jumper work is not involved and not exceeding 2.0 metres depth including dressing of bottom and sides of trenches, stacking the excavated soil clear from the edge of excavation and subsequent filling around masonry in 15 cm, layers with compaction including disposal of all surplus soil as directed within all lead.
Augmentation and improvement/Upgradation of Telecom infrastructure by Supply, Installation, Testing, Commissioning of IP based Intercom Exchanges & Telecom Equipments along with LAN cabling including associated works related to Fire Alarm System, ... Power Supply and ... N.E. Railway .
All work pertaining to Horizontal/Directional Drilling (HDD)/Boring and trenchless cabling. The depth of horizontal boring should be minimum 2 meter extending up to 2.5 meter from rail flange/ roadlevel/ground level as per site requirement and as per instructions of Railway Engineer incharge including insertion and supply of HDPE duct of 40/33 mm,coupling etc. (a) The Cost shall includes horizontal boring through any intermediate obstruction either natural of man 47 made or any boundary strata. (b) The rate is inclusive of all materials, equipment's and labour required for doing trenchless horizontal boring under the railway track. To this extra shall be admissible on any account than the rates as per above. All necessary arrangements are to be provided and all precautions are to be taken so that bore coming out at other end is not deviated from the horizontal level line by more than 250 mm horizontal or vertical. The bore should be capable enough for insertion of 40 mm dia HDPE duct. The bore shall be done at the depth of minimum 2000 mm from the ground level [As per Railway Board's letter No. 2006/ Tele/ TP /1 (3359379) dt. 02.01.2026].
BZA division -Provision of Electrical arrangements for the leftover works at Gudivada and Machilipatnam Railway stations [Phase II].
Supply of FRP ladder type cable tray of size 310mmx80mmx3mm thickness including 60 all accessories. The entire work has to be carried out as per the instruction and guidelines of Railway site Engineer.[makes : Fiber Tech Composite, ARTICAL INDUSTRIES, Aeron Composite Limited , Ferrotech Structurals.]