Loading…
Loading…
3,969 results • Best match
Sub-Station and Transmission Line PACKAGE-C8(1A)
Work for Carrying out routine monthly patrolling, preventing / breakdown /shutdown maintenance work of Transmission Lines under Transmission Sub-Division, Burmu for F/Y-2026-27 w.e.f. 01.06.2026 to 31.03.2027
Measurement of Earth Footing Resistance of Transmission Line Towers at an interval of 1 KM by electrical resistivity method or by ERM Method. (Total Line length- 31.5KM)
Work for Carrying out routine monthly patrolling, preventing / breakdown /shutdown maintenance work of Transmission Lines under Transmission Sub-Division, Khunti for F/Y-2026-27 w.e.f. 01.06.2026 to 31.03.2027.
Measurement of Earth Footing Resistance of Transmission Line Towers at an interval of 1 KM by electrical resistivity method or by ERM Method. (Total Line length- 63 KM)
Work for Carrying out routine monthly patrolling, preventing/breakdown/shutdown maintenance work of Transmission Lines under Transmission Sub-Division, Namkum for F/Y-2026-27 w.e.f. 01.06.2026 to 31.03.2027
Measurement of Earth Footing Resistance of Transmission Line Towers at an interval of 1 KM by electrical resistivity method or by ERM Method. (Total Line length- 126 KM)
Work for Carrying out routine monthly patrolling, preventing / breakdown /shutdown maintenance of 132KV Transmission Lines under Transmission Sub-Division, Kanke for F/Y-2026-27 w.e.f. 01.06.2026 to 31.03.2027
Measurement of Earth Footing Resistance of Transmission Line Towers at an interval of 1 KM by electrical resistivity method or by ERM Method. (Total Line length- 92.1 KM)
Work for Carrying out routine monthly patrolling, preventing / breakdown /shutdown maintenance work of Transmission Lines under Transmission Sub-Division, TAMAR for F/Y-2026-27 w.e.f. 01.06.2026 to 31.03.2027
Measurement of Earth Footing Resistance of Transmission Line Towers at an interval of 1 KM by electrical resistivity method or by ERM Method. (Total Line length- 1 KM)