Sub-Station and Transmission Line PACKAGE C8 (1B)
construction of transmission lines associated with 220 kV GSS Hemda under BN-9018002534
Detail Survey as per tentative route- Which includes the following major activities-Pegging of line route, providing of survey pillar at an interval of 3-4 KM in the line route with required jungle clearance for survey, profile preparation of approved route on graph sheet and marking of offset on either side of line, marking of side clearance for hills, sand dunes etc, as per specification and tower scheduling.
Patrolling by drone of various 132 KV Transmission Lines under ETD-II and ETD-III, Prayagraj.
Patrolling and condition monitoring (Visual & Thermal) of Over Head EHV Transmission Line by Drone for following Line under ETD-II & III, Prayagraj as per Technical Specifications & Direction of the Supervising Engineer :-
Permanent Restoration of 132 KV DC Chenani Srinagar Transmission Line by way of Re alignment of Transmission Line from J65 To J70 Near Thard
Supply of Line Material and Accessories
Carrying out patrolling, routine /breakdown/schedule maintenance of 132 KV D/C Chandankyari - Jainamore Transmission Line (41.7 Km) under Transmission Subdivision Jainamore, Bokaro for the period from 01.06.2026 to 31.03.2027
Transportation of materials by Small / Medium size truck from transmission central stores Namkum or GSS within 200KM radius to various locations of transmission line.
Carrying out patrolling, routine /breakdown/schedule maintenance of 220 KV D/C Govindpur-TTPS Transmission Line (90.5 Km) under Transmission Subdivision Govindpur, Dhanbad for the period from 01.06.2026 to 31.03.2027
Routine Monthly Patrolling of 220KV Transmission Line (90.5KM) including tree prunning, repositioning of earth wire, checking of insulators, jumpers etc., removing of soil from legs along the corridor & sort out the minor causes of tripping and vehicle with fuel & driver required for the work.