Loading…
Loading…
3,969 results • Best match
Work for Carrying out routine patrolling, preventing/breakdown/shutdown maintenance work of Transmission Lines under Transmission Sub-Division, Hatia-II for F/Y-2026-27 w.e.f. 01.06.2026 to 31.03.2027
Measurement of Earth Footing Resistance of Transmission Line Towers at an interval of 1 KM by electrical resistivity method or by ERM Method. (Total Line length- 111 KM)
Work for Carrying out routine monthly patrolling preventing/breakdown/ shutdown maintenance work of Transmission Lines under Transmission Sub-Division Lohardaga-I for F/Y-2026-27 w.e.f. 01.06.2026 to 31.03.2027.
Measurement of Earth Footing Resistance of Transmission Line Towers at an interval of 1 KM by electrical resistivity method or by ERM Method. (Total Line length- 59.2 KM)
Work for Carrying out routine monthly patrolling, preventing/breakdown/ shutdown maintenance work of Transmission Lines under Transmission Sub-Division, Lohardaga-II for F/Y-2026-27 w.e.f. 01.06.2026 to 31.03.2027.
Measurement of Earth Footing Resistance of Transmission Line Towers at an interval of 1 KM by electrical resistivity method or by ERM Method. (Total Line length- 116.8 KM)
EMPANELENMENT OF CONTRACTORS OR FIRMS FOR THE LINE SURVEY WORK PRELIMINARY SURVEY USING MODERN TECHNIQUES FOR CONSTRUCTION OR DIVERSION OF LINES UNDER ELECTRICITY TRANSMISSION CENTRAL ZONE UPPTCL LUCKNOW
Work for Carrying out routine patrolling, preventing/breakdown/shutdown maintenance work of 132KV Transmission Lines under Transmission Sub-Division, Hatia-I from 01.06.2026 to 31.03.2027 for F/Y-2026-27
Measurement of Earth Footing Resistance of Transmission Line Towers at an interval of 1 KM by electrical resistivity method or by ERM Method. (Total Line length- 44.6 KM)
AMC for of Carrying out patrolling, routine, breakdown, shutdown Maintenance of Transmission Lines Under TSD, Adityapur II (Ramchandrapur) for the F.Y. 2026-27
Routine Monthly Patrolling of 220 KV Transmission Lines (56 KM) including tree prunning, repositioning of earth wire, checking, tightening & positioning of fasteners, all Jumpers etc and back filling of Earth errosion of tower legs along the corridor and vehicle with fuel & driver required for the work.