Loading…
Loading…
3,862 results • Best match
Operation and Maintenance of Effluent/Sewage Treatment Plant - Only Maintenance Services are required for STP ETP & WTP; Only Maintenance Services are required for STP ETP & WTP; Equipments are working in good conditions but not under AMC
Operation and Maintenance of Effluent/Sewage Treatment Plant - Only Maintenance Services are required for STP ETP & WTP; Only Maintenance Services are required for STP ETP & WTP; Equipments are working in good conditions but not under AMC
Facility Management Service- Manpower based (Version 2) - Industrial; Operation and maintenance of 200 KLD capacity Sewage Treatment Plant at Nigalpani, DGPS; Unskilled, DGPS; Semi-skilled, DGPS; Skilled, DGPS; Highly-Skilled
Facility Management Service- Manpower based (Version 2) - Industrial; Operation and maintenance of 200 KLD capacity Sewage Treatment Plant at Nigalpani
Interception and Diversion works of all existing drains, conveyance network and establishment of Centralized/ De-centralized Sewage Treatment Plant(s) based on open technology, inclusive of 4 KLD Co-Treatment facility for Fecal Sludge/ Septage
Survey, Design, Procurement & Conducting a GIS-based survey and soil investigation. Performing necessary hydraulic and structural engineering and design. Procuring all required labor, materials, and Tools & Plants (T&P) for Network and Treatment Facilities. Executing Interception and Diversion (I&D) works for all existing drains and establishing a conveyance network. Establishing Centralized/ De-centralized Sewage Treatment Plant(s) (STP) based on open technology including a 4 KLD Co-Treatment facility specifically for Fecal Sludge/Septage. Constructing Civil, Electrical & Mechanical (E&M), and instrumentation works with suitable foundations for the I&D, conveyance network, and STP(s). Building STP components including an inlet chamber, pre-treatment units (including one standby unit), Primary/Secondary Treatments, and Disinfection units. Setting up Sludge Thickening and Sludge dewatering units ensuring the final treated effluent strictly complies with the latest National Green Tribunal (NGT) guidelines (BOD10mg/l, TSS20mg/l, Nitrogen-Total 10mg/l, Total Phosphorus 1mg/l, Fecal coliform100 MPN & COD50mg/l).
Detailed Design, Drawing, Construction, Supply, Installation, Testing and Commissioning of 100 KLD Sewage Treatment Plant (STP) based on MBR Technology to be Installed at Transit Accommodation Natnusa Kupwara on Turnkey Basis
Design, Supply, Installation, Testing and Commissioning of Sewage Treatment Plant (STP) based on MBR Technology as per the NIT for Transit Accommodation Natnusa Kupwara on Turnkey Basis with total sewage handling capacity of 100 KLD. STP shall include necessary chemical dosing as required by the manufacture’s design. Additionally, provision for optimum heating / thermal insulation (as per requirement) of the sewage water during winter to ensure that the STP remains operational at ambient temperatures as low as -10℃ shall be in the scope of the firm.
Detailed Design, Drawing, Construction, Supply, Installation, Testing and Commissioning of 160 KLD Sewage Treatment Plant (STP) based on MBR Technology to be Installed at Transit Accommodation Kulangam Handwara on Turnkey Basis
Design, Supply, Installation, Testing and Commissioning of Sewage Treatment Plant (STP) based on MBR Technology as per the NIT for Transit Accommodation Kulangam Handwara on Turnkey Basis with total sewage handling capacity of 160 KLD. STP shall include necessary chemical dosing as required by the manufacture’s design. Additionally, provision for optimum heating / thermal insulation (as per requirement) of the sewage water during winter to ensure that the STP remains operational at ambient temperatures as low as -10℃ shall be in the scope of the firm.
Design, Supply, Transportation, Construction, Installation, Testing, and Commissioning of 2 Nos. of Sewage Treatment Plants at Demow MB in Activated Sludge Process Technology with Co-treatment of Faecal Sludge for 6 KLD and Namrup MB in ASP
Design, supply, erection, testing and commissioning of all Mechanical works for STP including Coarse Bar Screen, Fine Stainless-Steel Screen, Raw Sewage Transfer pump from STP Inlet Wet Well to Pre-treatment Units, Chlorine Dosing Pump, Chlorine Dosing tank agitator, Electro-Magnetic Flow Meter, Pen stock gate/sluice gate valve for inlet sewage For Coarse Screen Chamber Inlet Gate, Pressure Gauge, Level Sensors (For All Pumps), Pipe & fittings with all accessories, PH meter, Dissolved Oxygen Meter, Valve & fittings, etc and all associated components installed and completed in accordance with the Employer's Requirements.