Loading…
Loading…
3,489 results • Best match
Operation, Maintenance and Repair of Electro Mechanical Components of 1.2 MLD Sewage Treatment Plant (STP) along with Existing Sewerage Network and allied works at Patnitop, Udhampur for 05 (Five) Years Contract No SDJ/W/ 44/2026-27
Operators, skilled (03 N0.) 1 for each shift of (8 hour/day) Day/Night and one Operator on rotational/assisting basis with 02 years experience in a sewage treatment plant certified by the officer for whome employee has worked. The wages to the skilled operators are to be paid @Rs.483 per person per day as per minimum wages act in vogue in UT of J&K.
Design, Construction, Testing, Commissioning of All The Components of Interception and Diversion Based Sewage Treatment Plant (STP) Work Including 05 Years of Operation and Maintenance of The Entire System in NAGAR PANCHAYAT, DEVKARunder SBM 2.0
Design, Construction, Testing, Commissioning of all the Components of Interception and Diversion Based Sewage Treatment Plant (STP) work Including05 Years of Operation and Maintenance of the Entire System In NAGAR PANCHAYAT,GURUR under SBM 2.0
Design, Construction, Planning, Supply, Installation, Testing and Commissioning of Sewage Treatment Plant (STP) of 130 KLD Capacity based on MBBR-Technology on EPC Mode including operation and maintenance for Two Years at Transit Accommodation P_II
1. Civil Work:- Construction of Bar Screen Chamber, Oil and grease chamber, Equilisation Tank, Anoxic Tank, Sludge Holding Tank, Tube setting Tank, Filter Feed Tank, Filter Feed pump, Activated carbon filter, Screw Pump, Poly dosing System, Water storage tank including operator cum pannel room, sokage pit and STP pipe network including other ancillary civil works as per approved vetted drawings. 2. Electro-Mechanical Equipments:- Design, supply, Construction, installation, testing, and commissioning of all electro-mechanical equipment required for the STP, including but not limited to pumps, blowers, mixers, diffusers,PSF, ACF, Disinfection, Dosing system, sludge handling systems, valves, actuators, instrumentation, automation, Control Panels, Servo, system piping, Lifting equipment and associated accessories, complete in all respects on EPC Mode. All equipment shall be suitably rated for the specified capacity and operating conditions, provided with necessary protections, and integrated with the electrical and PLC based automation system for efficient and reliable operation. The work shall also include all cabling, interconnections,earthing, supports,illumination and appurtenances required for a fully functional system, complete in all respects, in accordance with the Scope and Specifications given in Section B of Annexure C. 3. Operation & Maintenance (O&M): Operation and maintenance of the 130 KLD STP for a period of 02 (two) years from the date of successful completion of 60 days Trial Run , including deployment of required manpower, supply of consumables and chemicals, routine maintenance, repairs, and upkeep of all civil, electro-mechanical, electrical, and automation systems. The Contractor shall ensure continuous and efficient operation of the plant, maintaining the specified effluent quality standards at all times, and shall hand over the plant in fully functional condition at the end of the O&M period complete in all respects, in accordance with the Scope and Specifications given in Section D of Annexure C.
Design, Construction, Planning, Supply, Installation, Testing and Commissioning of Sewage Treatment Plant (STP) of 130 KLD Capacity based on MBBR-Technology on EPC Mode including operation and maintenance for Two Years at Transit Accommodation P_I
1. Civil Work:- Construction of Bar Screen Chamber, Oil and grease chamber, Equilisation Tank, Anoxic Tank, Sludge Holding Tank, Tube setting Tank, Filter Feed Tank, Filter Feed pump, Activated carbon filter, Screw Pump, Poly dosing System, Water storage tank including operator cum pannel room, sokage pit and STP pipe network including other ancillary civil works as per approved vetted drawings. 2. Electro-Mechanical Equipments:- Design, supply, Construction, installation, testing, and commissioning of all electro-mechanical equipment required for the STP, including but not limited to pumps, blowers, mixers, diffusers,PSF, ACF, Disinfection, Dosing system, sludge handling systems, valves, actuators, instrumentation, automation, Control Panels, Servo, system piping, Lifting equipment and associated accessories, complete in all respects on EPC Mode. All equipment shall be suitably rated for the specified capacity and operating conditions, provided with necessary protections, and integrated with the electrical and PLC based automation system for efficient and reliable operation. The work shall also include all cabling, interconnections,earthing, supports,illumination and appurtenances required for a fully functional system, complete in all respects, in accordance with the Scope and Specifications given in Section B of Annexure C. 3. Operation & Maintenance (O&M): Operation and maintenance of the 130 KLD STP for a period of 02 (two) years from the date of successful completion of 60 days Trial Run , including deployment of required manpower, supply of consumables and chemicals, routine maintenance, repairs, and upkeep of all civil, electro-mechanical, electrical, and automation systems. The Contractor shall ensure continuous and efficient operation of the plant, maintaining the specified effluent quality standards at all times, and shall hand over the plant in fully functional condition at the end of the O&M period complete in all respects, in accordance with the Scope and Specifications given in Section D of Annexure C.
Supply Installation Testing and commissioning of self healing MPP MP type shunt capacitor banks for Improving Power factor to drainage Pumping stations and Sewage Treatment Plants in Circle II area