Loading…
Loading…
3,892 results • Best match
Construction of 40 Women Barrack at Bn Hqrs 23RD Bn Lalpool under FTR SSB Tezpur Assam
Providing and applying integral crystalline slurry of hydrophilic in nature for waterproofing treatment to the RCC structures like retaining walls of the basement, water tanks, roof slabs, podiums, reservior, sewage & water treatment plant, tunnels / subway and bridge deck etc., prepared by mixing in the ratio of 5 : 2 (5 parts integral crystalline slurry : 2 parts water) for vertical surfaces and 3 : 1 (3 parts integral crystalline slurry : 1 part water) for horizontal surfaces and applying the same from negative (internal) side with the help of synthetic fiber brush. The material shall meet the requirements as specified in ACI-212-3R-2010 i.e by reducing permeability of concrete by more than 90% compared with control concrete as per DIN 1048 and resistant to 16 bar hydrostatic pressure on negative side. The crystalline slurry shall be capable of self-healing of cracks up to a width of 0.50 mm. The work shall be carried out all complete as per specification and the direction of the engineer-in-charge. The product performance shall carry guarantee for 10 years against any leakage. For horizontal surface one coat @1.10 kg per sqm.
Construction of 40 Women Barrack at Bn Hqrs 37TH Bn Mangaldoi under FTR SSB Tezpur Assam
Providing and applying integral crystalline slurry of hydrophilic in nature for waterproofing treatment to the RCC structures like retaining walls of the basement, water tanks, roof slabs, podiums, reservior, sewage & water treatment plant, tunnels / subway and bridge deck etc., prepared by mixing in the ratio of 5 : 2 (5 parts integral crystalline slurry : 2 parts water) for vertical surfaces and 3 : 1 (3 parts integral crystalline slurry : 1 part water) for horizontal surfaces and applying the same from negative (internal) side with the help of synthetic fiber brush. The material shall meet the requirements as specified in ACI-212-3R-2010 i.e by reducing permeability of concrete by more than 90% compared with control concrete as per DIN 1048 and resistant to 16 bar hydrostatic pressure on negative side. The crystalline slurry shall be capable of self-healing of cracks up to a width of 0.50 mm. The work shall be carried out all complete as per specification and the direction of the engineer-in-charge. The product performance shall carry guarantee for 10 years against any leakage. For horizontal surface one coat @1.10 kg per sqm.
Construction of Pedestrian Subway underpass between PGI and Punjab University Chandigarh
Providing and applying integral crystalline (dry shake) of hydrophilic in nature for waterproofing treatment to the RCC structures like basement raft, foundation slab, sewage & water treatment plant slab, warehouses floor, parking structures and water tank base slab etc. sprinkled @0.60 kg per sqm or higher as recommended by the manufacturer’s specification over the lean concrete of above cited structures. The material shall meet the requirements as specified in ACI-212-3R-2010 i.e. by reducing permeability of concrete by more than 85%, compared control concrete as per DIN 1048 and resistant to 16 bar hydrostatic pressure on negative side. The crystalline dry-shake shall be capable of self-healing of cracks up to a width of 0.50 mm. The work shall be carried out all complete as per specification and the direction of the Engineer-in-charge. The product performance shall carry guarantee for 10 years against any leakage. DSR 22.24
REPAIR/ MAINT TO ROOF TREATMENT, SUNKEN FLOOR TO CERTAIN BUILDINGS AND MISC B/R AT PINTO PARK AREA UNDER AGE B/R-II AT GE (AF) PALAM DELHI CANTT
M&L for special treatment for sunken portion of WCs/Bath & toilet etc executed in following stages:- Stage 1: Cleaning of all foreign material such as fungus, mass, dust etc by brushing and dusting, sprinkle water on surface, surface shall be levelled with a layer of 20 mm thick CM (1:4) mixed with water proofing admixture WPC @3% by weight of as per manufacturer's insturctions. State 2 : Primer-Mix Tarfelt LM of STP Ltd (diluted with water in ratio 1:1) @ 250 gms/sqm and apply the primer on the plastered surfaces. Stage 3 : Application of 1st coat of Tarfelt LM of STP Ltd (without dilution with water) @ 1Kg/Sqm by brush all as per manufacturer's instructions. Stage 4: Laying fibre glass cloth (weight not less than 50gram/ Sqm) over the 1st coat while the coated surface is still sticky. Stage 5: After 6 to 7 hours interval, apply second coat i.e. final coat of Tarfet LM of STP Ltd (without Dilution with water) @ 1kg/ Sqm by brush as per manufacturer's instructions. Stage 6: Providing 15mm thick protective plaster in CM (1:3) mixed with STP No. 1 @ 250ml/50 Kg cement all as per manufacturer's instructions. Stage 7: Carryout ponding test for 48 hours to ensure water tightness of repaired sunken portion. NOTES :- (i) Mode of measurement shall be actual area treated (floor and adjoining walls).
REPAIR/ MAINT TO ROOF TREATMENT, SUNKEN FLOOR TO CERTAIN BUILDINGS AT CAMP AREA, MAUDE LINE ETC UNDER AGE B/R-II AT GE (AF) PALAM DELHI CANTT
M&L for special treatment for sunken portion of WCs/Bath & toilet etc executed in following stages:- Stage 1: Cleaning of all foreign material such as fungus, mass, dust etc by brushing and dusting, sprinkle water on surface, surface shall be levelled with a layer of 20 mm thick CM (1:4) mixed with water proofing admixture WPC @3% by weight of as per manufacturer's insturctions. State 2 : Primer-Mix Tarfelt LM of STP Ltd (diluted with water in ratio 1:1) @ 250 gms/sqm and apply the primer on the plastered surfaces. Stage 3 : Application of 1st coat of Tarfelt LM of STP Ltd (without dilution with water) @ 1Kg/Sqm by brush all as per manufacturer's instructions. Stage 4: Laying fibre glass cloth (weight not less than 50gram/ Sqm) over the 1st coat while the coated surface is still sticky. Stage 5: After 6 to 7 hours interval, apply second coat i.e. final coat of Tarfet LM of STP Ltd (without Dilution with water) @ 1kg/ Sqm by brush as per manufacturer's instructions. Stage 6: Providing 15mm thick protective plaster in CM (1:3) mixed with STP No. 1 @ 250ml/50 Kg cement all as per manufacturer's instructions. Stage 7: Carryout ponding test for 48 hours to ensure water tightness of repaired sunken portion. NOTES :- (i) Mode of measurement shall be actual area treated (floor and adjoining walls).
REPAIR CLEANING OF SEWAGE LINE MAN HOLES GULLY TRAPS AND SEPTIC TANKS OF ZONE 1 AREA OF MCEME UNDER GE MCEME SECUNDERABAD
Attending daily routine complaints for clearing all blockages in gully trap, floor trap, EWC, IWC, Kitchen sink and traps, WHB, P or S Traps etc cleaning of blockage by sucking by suction pumps etc including flushing and removing of grit, grease, sludge in entire Zone II area of MCEME. Clearing the sewage line between the overflowing Manholes, inspection chamber and from 1st manhole to branch sewer line, main sewer line, manholes of any size and depth and desludging completely including and and removal of foreign materials manually or mechanically or by way of any other suitable means and rodding with 6mm dia MS round bars / plain flexible Bamboo pieces tied with protective cushion / waste cloth on top till clearing the sewer lines between the blocked manholes and keeping the sewage line all time functional including periodical enspection using methods like manhole observation upto septic tank or central sewage treatment plant and / or soakage well complete (working in foul condition with taking suitable precautionary measures). The sludge obtained from the manholes and sewage line shall be removed and away from MD land.Note : Note 1 : Contractor will deploy 2 Nos sweeper and 3 Nos helper per day in the MES Office/ Complaint cell and they will report to the concerned JE / Engr-in-Charge daily at 9.00 AM to 5.00 PM. In case of emergency, cleaning labour will attend work on sunday/ holiday also. Note 2 : If any of the sweeper / helper fails to report daily to the concerned authority, a sum of Rs. 827/- will be deducted per men/day from the payment of the contractor. Note 3 : The sweeper / helper will always be in posession of the cleaning tools like 6mm MS round bar / rod, plain flexible bamboo pieces and cleaning pump with wooden / PVC handle. The rate quoted is deemed to be inclusive of the cost of T & P for maintenance/ cleaning work. Note 4 : The sweeper / helper shall always be used hand glow, Mask and gum boot for working in foul condition and follow the necessary precautionary hygiene measures to prevent infections.