Loading…
Loading…
20,769 results • Latest
High Mast Light near Sai Baba Temple MouzaChalki GPGopalnagarII JL no 103 BlockBongaon Fund PMAJAY
A4 and Legal Size Multifunction Printer (MFP) (Q2) (3 (3 ))
1/2(half) INCH SOFT SEATED CHECK VALVE
Printed circuit Board (PCB) Type: PPB 47
Flexible Shunt [Short] of Pantograph
Sulphuric Acid (V2) Conforming to IS 266 (Q3), Hydrochloric Acid (V3) Conforming to IS 265 (Q3)
REPAIRING AND RENOVATION OF GOBRAPUR AWC AT GANRAPOTA GP UNDER BONGAON DEVELOPMENT BLOCK
Custom Bid for Services - CAMC of Computer and peripherals Similar Category AMC/CAMC of Hydro Energy Power Plants
Supply and Installation of High - Temperature Chamber (Muffle) Furnace
Live Cell Imaging System
Repair and renovation work of Ashok Nath Shastri Road From Goutam Sangha Club To D.N Kalisthan on Ward No 18 under Rajpur Sonarpur Municipal area.
Repair and renovation work of Aurabinda Pally T.G Road) From Barun Pauls House To Ashit Roy via Sukumar Biswass House on Ward No 18 under Rajpur Sonarpur Municipal area.
Medimages ECG Machine 1 Channel Brand: Medimages (Detailed Description/Specification as per Product # 1 of GeM Contract No. GEMC-511687708114759 dt.18/08/2026)
Fabrication and supply of 1 in 8.5 Diamond Crossing with Double Slips to RDSO Drg. No. T- 6494/alteration -3 complete with [Curved Switch] BG for 60 Kg Rails [UIC] on PSC sleepers layout with CMS Acu
AIR FILTER
ARC CHUTE ASSEMBLY MODIFIED
MODIFIED DRIVE SHAFT
Purchase of 8"X8" Brake Cylinder etc.
REPAIRING AND RENOVATION OF CHANDA KALITALA AWC AT GANRAPOTA G.P. UNDER BONGAON DEVELOPMENT BLOCK
Construction of Pucca Drain from Bhulat FP School to Kodalia river at Bhulat within sundarpur gp under Bangaon Panchayat samity Activity Code 112800737
Security Guarding, Sweeping and Cleaning and Up Keeping of entire Maulana Abul Kalam Azad Bhavan compound , Lift Lobby, all Toilet Blocks and attached toilet, Office establishment (from ground floor to 7th Floor and Roof), Salt Lake, Kolkata-700064
Supply of Stationary Items
Country Jute Twine (V2) as per IS 1912 (Q3) (3 (3 ))
Establishment of Modern Traffic Control Room at the 7th Flr of Araksha Bhawan-Supply, Installation, Testing and Commissioning of Video Wall, Operator Console, Access Control, UPS and Other IT related Works Including Internet Leased Line Connectivity.
Establishment of Modern Traffic Control Room at the 7th Floor of Araksha Bhawan - Supply and Fixing of modular furniture along with Air-Conditioning System. (1st Call)
Day to Day repair Operation and maintenance of OHR/CI/DI/HDPE/UPVC/AC/GI Rising main and Distribution system for BANSGHATA water supply scheme under Bongaon Sub-Division P.H.E.Dte.
Engagement of Agency for providing Manpower for Security, Maintenance and Accounts personnel on contractual basis at West Bengal Co-Operative Milk Producers Federation Ltd.
Providing Flood Lighting arrangement with Stadium High Mast at Jawpur Santan Sangha Udyan at ward no 15.
Construction of Flag Mast and Installation of National Flag near Jawpur Santan Sangha Club under South Dum Dum Municipality at ward no 15.
Establishment of Modern Traffic Control Room at the 7th Floor of Araksha Bhawan-General Civil and Electrical Works. (1st Call)
Day to Day repair Operation and maintenance of OHR/CI/DI/HDPE/UPVC/AC/GI Rising main and Distribution system for HELENCHA water supply scheme under Bongaon Sub-Division, P.H.E.Dte.
Procurement of WIAWIS Make Archery Equipment for RC Kolkata
supply of Stationery Items, Hiring of Laptops, Printers, DEOs, etc, Infrastructure like Decoration of Venue etc, Supply of Food items, Hiring of Vehicle and Publicity towards official purpose and different Government Programs including RAMP 2026-27
Operation and Maintenance of Iron Elimination Plant at Chikanpara W/S Scheme under Bongaon Sub-Division, P.H.E. Dte. Period from 01.03.2024 to 28.02.2025
Repair and Renovation of ECSU, 9th Floor, S.N. Bose Bhavan at ISI, Kolkata-700 108.
Installation of New Aqualite 100 Ltr. PHS (RO) water Purifier with 8/44 Iron Removal Vessel (Make TATA Steel) at different places under South Dum Dum Municipality.
Urgent dismantling of damaged RCC Water Storage Tank on the roof of RS Hostel (West Side) and installation of New PVC Water Storage Tanks (East and West Side) on the roof including necessary Civil and Plumbing Works at 205 B.T. Road ISI, Kolkata-108.
IMPROVEMENT OF THE UTILITY ZONES URROUNDING AREAS ATTACH WITH THE MODULE-1 HAVING CAPACITY 20MGD POTABLE WATER, UNDER IGWTP.
Clearing and removing water hyacinth under AMC for the period of 365 days including thick and thorny jungles of Choita River from ch 0.0 km to 5.0 km within Block and P.S. Gaighata Dist North 24 Pgs
Repair and Overhauling Service - monitor; HP, MILINIUM; Yes; Buyer Premises
Installation of New 80 Ltr. Storage Water Cooler.
Construction of Black top road rest portion at Nataberia road at Bagdah block.
Clearing and removing water hyacinth under AMC for the period of 12 months including thick and thorny jungles of Sonai River and Sonai Khal from Daharkanda ( 0.00 km) to Bayerghata wooden bridge(10.00 km) for the length of 7.50 km. at G.PBithari
SUPPLY, INSTALLATION, COMMISSIONING OF LABORATORY ITEMS
Maintenance of Central median and both side separator including southern part flank partly portion of Street No 931 in Action Area III Newtown Kolkata For 01 One year
Clearing and removing water hyacinth under AMC for a period of 12 months on the river Sunti from 0.60 Km. to 27.17 KM. for a length of 26.57 Km. including removal of debris in Barasat Block - I And II And Barasat Municipality P.S. DuttapukurandBarasa
Operation and Maintenance of Iron Elimination Plant at Helencha W/S Scheme under Bongaon Sub-Division, P.H.E. Dte. Period from 01.03.2024 to 28.02.2025
supplying Stationery Forms Printing and Computer articles and Furniture articles for the period from April 2025 to March 2026
Clearing and removal of water hyacinth under AMC for a period of 12 months from 12.00 km to 43.170 km over river Nonagong in BlockDegangaBarastI And ii and Ashoknagar-Kalyangarh Municipality in DistNorth 24 Parganas.
Clearing and removal of water hyacinth under AMC for a period of 12 months on Banikantha Khal from 0.14 km to 12.30 km. including removal of debris under Barasat Block-IIMadhyamgram and Barasat MunicipalityP.S. Madhyamgram and Barasat,Dist.North24Pgs