Loading…
Loading…
20,801 results • Latest
Purchase of 8"X8" Brake Cylinder etc.
REPAIRING AND RENOVATION OF CHANDA KALITALA AWC AT GANRAPOTA G.P. UNDER BONGAON DEVELOPMENT BLOCK
Construction of Pucca Drain from Bhulat FP School to Kodalia river at Bhulat within sundarpur gp under Bangaon Panchayat samity Activity Code 112800737
Security Guarding, Sweeping and Cleaning and Up Keeping of entire Maulana Abul Kalam Azad Bhavan compound , Lift Lobby, all Toilet Blocks and attached toilet, Office establishment (from ground floor to 7th Floor and Roof), Salt Lake, Kolkata-700064
Supply of Stationary Items
Country Jute Twine (V2) as per IS 1912 (Q3) (3 (3 ))
Establishment of Modern Traffic Control Room at the 7th Flr of Araksha Bhawan-Supply, Installation, Testing and Commissioning of Video Wall, Operator Console, Access Control, UPS and Other IT related Works Including Internet Leased Line Connectivity.
Establishment of Modern Traffic Control Room at the 7th Floor of Araksha Bhawan - Supply and Fixing of modular furniture along with Air-Conditioning System. (1st Call)
Day to Day repair Operation and maintenance of OHR/CI/DI/HDPE/UPVC/AC/GI Rising main and Distribution system for BANSGHATA water supply scheme under Bongaon Sub-Division P.H.E.Dte.
Engagement of Agency for providing Manpower for Security, Maintenance and Accounts personnel on contractual basis at West Bengal Co-Operative Milk Producers Federation Ltd.
Providing Flood Lighting arrangement with Stadium High Mast at Jawpur Santan Sangha Udyan at ward no 15.
Construction of Flag Mast and Installation of National Flag near Jawpur Santan Sangha Club under South Dum Dum Municipality at ward no 15.
Establishment of Modern Traffic Control Room at the 7th Floor of Araksha Bhawan-General Civil and Electrical Works. (1st Call)
Day to Day repair Operation and maintenance of OHR/CI/DI/HDPE/UPVC/AC/GI Rising main and Distribution system for HELENCHA water supply scheme under Bongaon Sub-Division, P.H.E.Dte.
Procurement of WIAWIS Make Archery Equipment for RC Kolkata
supply of Stationery Items, Hiring of Laptops, Printers, DEOs, etc, Infrastructure like Decoration of Venue etc, Supply of Food items, Hiring of Vehicle and Publicity towards official purpose and different Government Programs including RAMP 2026-27
Operation and Maintenance of Iron Elimination Plant at Chikanpara W/S Scheme under Bongaon Sub-Division, P.H.E. Dte. Period from 01.03.2024 to 28.02.2025
Repair and Renovation of ECSU, 9th Floor, S.N. Bose Bhavan at ISI, Kolkata-700 108.
Installation of New Aqualite 100 Ltr. PHS (RO) water Purifier with 8/44 Iron Removal Vessel (Make TATA Steel) at different places under South Dum Dum Municipality.
Urgent dismantling of damaged RCC Water Storage Tank on the roof of RS Hostel (West Side) and installation of New PVC Water Storage Tanks (East and West Side) on the roof including necessary Civil and Plumbing Works at 205 B.T. Road ISI, Kolkata-108.
IMPROVEMENT OF THE UTILITY ZONES URROUNDING AREAS ATTACH WITH THE MODULE-1 HAVING CAPACITY 20MGD POTABLE WATER, UNDER IGWTP.
Clearing and removing water hyacinth under AMC for the period of 365 days including thick and thorny jungles of Choita River from ch 0.0 km to 5.0 km within Block and P.S. Gaighata Dist North 24 Pgs
Repair and Overhauling Service - monitor; HP, MILINIUM; Yes; Buyer Premises
Installation of New 80 Ltr. Storage Water Cooler.
Construction of Black top road rest portion at Nataberia road at Bagdah block.
Clearing and removing water hyacinth under AMC for the period of 12 months including thick and thorny jungles of Sonai River and Sonai Khal from Daharkanda ( 0.00 km) to Bayerghata wooden bridge(10.00 km) for the length of 7.50 km. at G.PBithari
SUPPLY, INSTALLATION, COMMISSIONING OF LABORATORY ITEMS
Maintenance of Central median and both side separator including southern part flank partly portion of Street No 931 in Action Area III Newtown Kolkata For 01 One year
Clearing and removing water hyacinth under AMC for a period of 12 months on the river Sunti from 0.60 Km. to 27.17 KM. for a length of 26.57 Km. including removal of debris in Barasat Block - I And II And Barasat Municipality P.S. DuttapukurandBarasa
Operation and Maintenance of Iron Elimination Plant at Helencha W/S Scheme under Bongaon Sub-Division, P.H.E. Dte. Period from 01.03.2024 to 28.02.2025
supplying Stationery Forms Printing and Computer articles and Furniture articles for the period from April 2025 to March 2026
Clearing and removal of water hyacinth under AMC for a period of 12 months from 12.00 km to 43.170 km over river Nonagong in BlockDegangaBarastI And ii and Ashoknagar-Kalyangarh Municipality in DistNorth 24 Parganas.
Clearing and removal of water hyacinth under AMC for a period of 12 months on Banikantha Khal from 0.14 km to 12.30 km. including removal of debris under Barasat Block-IIMadhyamgram and Barasat MunicipalityP.S. Madhyamgram and Barasat,Dist.North24Pgs
Day to Day repair Operation and maintenance of OHR/CI/DI/HDPE/UPVC/AC/GI Rising main and Distribution system for MATIAGACHA water supply scheme under Bongaon Sub-Division, P.H.E.Dte.
Renovation and Repairing works for Flat No 403 G_10 RHE Swayambhara at Salt Lake repair and painting all rooms modification of wardrobe in kitchen and extension of shoe rack with some S and P works
Memo No. 1657 /E-1375262 /EE-E/NKDA/ Elect/ 2025-26- Provision of Street Light along with GI Octagonal pole at extension of Street No. 852 at AA-III, at NKDA Area, New Town, Kolkata
Construction of Wooden bridge over Padma Khal at Ch. 5.40 Km Mouza- Kumra Block-Habra-I P.S.-Habra Dist.- North 24 Pgs.
Memo. No. 10009 /E-1246931/ EE-E/NKDA/2025-26
Emergent restoration of right bank of river Jamuna and Ichamati near Tipi park at mouza-Tipi within Block and P.S.-Swarupnagar Dist. North 24 Parganas.
Supplying and Laying of Clear Water Rising Main network with D.I...in all respect for Water Supply Scheme within Baduria Municipality, District North 24 Parganas under AMRUT 2.0 a)PHED source to CWR b)CWR To 5 nos. Zonal OHRs
light fittings and connected accessories for maintenance of Main Administrative Building of NKDA New Town Kolkata
Annual maintenance and repairing of L.T HT electrical installations incl. operation of three nos. lift of Adibashi Bhavan maintained by the Central Mechanical Division of UDMA Department for one year.
Construction of Boundary wall infront of the main gate at office campus under Bidyadhari Drainage Sub-Division 24 Pgs North Length -45.00 m.
Jungle Cutting and Pond Cleaning cleaning of internal drains and cleaning of office floor inside of Bidyadhari Drainage Division Colony Campus at Barasat Taki Road in the District of North 24 Parganas.
Design, development, hosting, operation and maintenance of a secure online portal for publication of re-evaluated TET 20XX results and download of updated TET 20XX Certificates
Engagement of an Agency for providing partial conservancy services at ESI Hospital Baltikuri
TENDER DOCUMENT FOR STATE ARCHIVES
Erection of temporary water proof pandals and making of other necessary arrangements INSIDE of Madinat-ul-Hujjaj compound (Hajj House), Rajarhat, New Town, Kolkata in connection with Haj Yatra - 2023.
ReConstruction of a Wooden Bridge over River Sunti at 8.20 Km. of Mouza - Bagberia Srikrishnapur, G.P.- Kemia Khamarpara, Block - Barasat II in P.S.- Barasat, Dist. - North 24 Parganas
Rehabilitation of 5 Vent Sluice at the confluence of Bagjola Part-II Khal consisting of 5 Nos. Vertical Draw Shutter, 5 Nos. Flap Shutter with new hoisting arrangement including Winch System at Baroj Khal, P.S. Harora, Dist.- North 24 Parganas.