Loading…
Loading…
110 results • Latest
Improvements to the road the riding surface to old Madras road leading Ambativaripalem road from km 3/0 to 5/0 in Bapatla District
Improvement to Badminton Court at Repalle Town of Bapatla District
Improvements to Kolluru - Kolluru ferry Road (SH 336) from km 0/0 to 0/650 in Bapatla District.4th call
Annual Maintenance of State Highways in (R&B) Section, Inkollu for the year 2026-27 (SH Package No 08)
AS PER BOQ AND TENDER DOCUMENT
Providing CC Drain from SVRM College Quarters to Goddumothu Canal at Anajaneyaswamy temple of Nagaram GP of Nagaram Mandal in Bapatla District.Est.Cost.25.00 Lakhs
Improvements to DW Tank in Nagulapalem Village of Parchur Mandal of Bapatla District.Est.Cost.10.00 Lakhs
RENEWAL TO WOODEN FURNITURE AND STEEL FURNITURE AGAINST BER FURNITURE UNDER AGE (I) AF SURYALANKA
REPAIRS/REPLACEMENT OF INTERNAL WIRING, FITTINGS, FIXTURES, UG CABLES, LT PANEL, ACSR CONDUCTOR AND ALLIED SERVICES AT AF STN SURYALANKA
Construction of Community Hall at Velamuripadu (V) of Addanki (M) Est Cost Rs 30.00 Lakhs
Construction of Community Hall at 8th Ward in Addanki Town of Addanki (M) Est Cost Rs 30.00 Lakhs
UPGRADE THE EXISTING CCTV SURVEILLANCE SYSTEM ALONGWITH ACCESSORIES AT ICGS NIZAMPATNAM
Improvements to the road IM Road to NH5 Road from km 0/0 to 1/2 in Bapatla District
Providing BT to the Road from Govada-Kavuru Reach-4 in Amarthaluru (M) Est Cost Rs 10.00 Lakhs
REPAIRS / REPLACEMENT OF EXISTING EARTHING, LIGHTENING ARRESTER AND ASSOCIATED MISC WORK AT AF STN SURYALANKA
PROVN OF SUMP AND PUMP ROOM ALONG WITH WATER PIPE LINE AND CONNECTED SERVICES AT AF STATION SURYALANKA.
REPAIR/REPLACEMENT TO OLD RUSTED CONCERTINA COIL, BARBED WIRE, CHAIN LINK FENCING, STORM WATER DRAIN, STEEL GATES and REPAIR TO SECURITY WALL AT AFS SURYALANKA
PROVN OF SUN SHED AT MAIN GATE AND DG SET FOR GDCC SERVER ROOM AT AFS SURYALANKA.
REPAIRS TO FLOORING, PLINTH PROTECTION, BRICK WORK, PLASTERING, REPLACEMENT OF PVC WATER TANK, PIPE LINE, SANITARY FITTINGS WATER PROOFING , ANTITERMITE TREATMENT WITH CONNECTED ITEMS AT AFS SURYALANKA
Providing BT to the Road from Govada-Kavuru Reach-2 in Amarthaluru (M) Est Cost Rs 20.00 Lakhs
Construction of Community Hall at Venkatapuram (V) of Addanki (M) Est Cost Rs 30.00 Lakhs
Construction of Community Hall at Ramayapalem (V) of Addanki (M) Est Cost Rs 30.00 Lakhs
Construction of Community Hall at Dharmavaram (V) of Addanki (M) Est Cost Rs 30.00 Lakhs
Re-Construction of Sri Parvathi Sametha Manjunadha swamy Temple, Baitamanjulurur(V) ,J Panguluru(M), Bapatla District
Reconstruction of Sri Someswara Swamy Temple, Bapatla (T&M), Bapatla District.
Laying of CC Road from Dumpa Ramalakshmi house (D.No.2-43-33/1) to Basi Seethamma house (D.No.3-4-14), in Vital Nagar, Ward No.27
Construction of Community Hall at LEF Nagar in Addanki Town of Addanki (M) Est Cost Rs 30.00 Lakhs
Construction of Community Hall at Ward-3 of Namburivaripalem (V) of Addanki (M) Est Cost Rs 30.00 Lakhs
Providing BT to the Road from Govada-Kavuru Reach-1 in Amarthaluru (M) Est Cost Rs 20.00 Lakhs
Construction of Community Hall at Chakrayapalem (V) of Addanki (M) Est Cost Rs 30.00 Lakhs
Providing BT to the Road from Govada-Kavuru Reach-3 in Amarthaluru (M) Est Cost Rs 10.00 Lakhs
Construction of Community Hall at Gowada (V) of Addanki (M) Est Cost Rs 30.00 Lakhs
Construction of Community Hall in Gopal Nagar , Kothapeta Panchayat, Vetapalem (M) Est Cost Rs 25.00 Lakhs
Construction of Anganwadi Center Building in Perali-4 of Perali (V) of Karlapalem (M) Est Cost Rs 10.00 Lakhs
Construction of CC Road from Peravali Charamma (H) to Donam Muslaiah (H) in Peravalipalem (V) of Vemuru (M) Est Cost Rs 6.75 Lakhs
Construction of CC Road from Peravali James (H) to Peravali Abraham (H) in Peravalipalem (V) of Vemuru (M) Est Cost Rs 9.00 Lakhs
Providing Drinking Water Facilities to Muttupalli GP in Nizampatnam Mandal of Bapatla District.Est.Cost.15.00 Lakhs
Construction of Foot Bridge in Hindu Burial Ground in Chinapulivarru(V) of Kolluru (M) Est Cost Rs 7.00 Lakhs
Laying of CC Road from Satyanarayana swamy temple to Davuluri Sarala house (D.No.17-14-2), in Ward No.21
Laying of CC road from Yamala Rani House (D.No.7-5-14) to Nukathoti Vardhan rao House (D.No.7-5-41) at Santhinagar in ward No-3 in Chirala Municipality
Laying of CC Road from Brahamgari Chettu to Damarla Siva Parvathi house (D.No.23-2-23), in Ward No.15
Laying of CC Road from Gorrela Amarnath house (EP No.SS97/C67/15/1/4) to Dandubata road EP No.SS97/C67/15/1/7, in Yanadi Sangam Vykuntapuram, Ward No.23
Providing CC road and Constrution of CC drain from Vetapalem Venkateswarlu house to Dasari Venkata Subba Rao house at Vykuntapuram in ward No.23
Construction of Health and Wellness Center Building at Karamchedu-2 (V) of Karamchedu (M) Est Cost Rs 36.00 Lakhs
Completion of Incomplete GP Office Building in Epurupalem GP of Chirala (M) Est Cost Rs 25.00 Lakhs
Annual Maintenance of MDRs in (R&B) Section, Repalle for the year 2026-27(MDRs Package No 01)
REPAIRS OF ROADS AND JOINT FILLING OF ROADS AT CERTAIN LOCATIONS AT AF STATION SURYALANKA.
Repairs and Renovation to Rural Live Stock Unit at Mantripalem G.P of Nagaram (M) Est Cost Rs 4.00 Lakhs
Repairs and Renovation to Rural Live Stock Unit at Dhulipudi G.P of Nagaram (M) Est Cost Rs 3.00 Lakhs
Providing Mosquito Meshes to 6 Govt. B.C. welfare Hostels i.e.., Boys Hostel at Duddukuru, Gilrs Hostel at Chinnaganjam, Boys Hostel at Pandillapalli, College Gilrs Hostel at Chirala, Boys Hostel at Inkollu & College Boys Hostel at Inkollu in Bapatla District. as Package - III