Loading…
Loading…
606 results • Latest
Construction of a drain and CC road from Manoj Kumars house to Sheila Devis house in Ward-02 (Jatavpura Neem Chowk).
Construction of a boundary wall for the pond at Kanha Gaushala in Ward 37.
Construction of edging for flower beds along the pathways in Bankhandinath Vatika.
Construction of a boundary wall, changing room, bathroom, and veranda for the Daswangar (ritual site) alongside the railway line, adjacent to the primary school in Ward-45 (Maheshpur Atariya).
Construction of RCC Nala and roadside patri, from Nahar Puliya to Shyamcharan house in ward no.3
Laying/Connection of water supply pipeline from Prempal boring to Netram House ward no.03
Construction of RCC Nala and roadside patri from Corner of Janki prasad house to Kabristan in ward no.3
Laying/connection of water-supply pipeline from Bahadur Gangwar house to Pappu house ward no.12
Installation work of water supply pipeline in ward no.7
Construction of RCC Nala and interlock roadside patri, from Chand Babu to S Z Hospital in ward no.3