Loading…
Loading…
21,045 results • Latest
MAINTENANCE OF FW AND UFW SUPPLY NETWORK INCLUDING REPAIRING OF URINALS PIPE AND OTHER ALLIED WORKS AT MAHARSHI DEBANDRA ROAD AND DIFFERENT LOCATIONS IN WARD NO-22
Supply of Chemicals for the Amtala Sub-District Laboratory, PHED at South 24-Pgs. Water Supply Sub-Divn.-II under South 24-Pgs. Water Supply Divn.-I, PHE Dte.
Model Estimate of Electrical works for Supply, Delivery, Erection an Installation of 20 No 12.5 Mtr. Polygonal High Mass Tower LED light system (having 8 Nos 150W Flood Light LED luminaires) with 24 hr an Twilight Dual Channel Timer Operation compris
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - Office Space; Electrical System or Installation; Service Provider
Windows 11 Professional
RENOVATION OF PAY AND USE TOILET NEAR NEW ALIPORE PETROL PUMP IN WD-81,BR-X
REPAIRING OF UTTARAN PASSAGES AT HARISH NEYOGI ROAD AND SURROUNDING AREAS BY LAYING CEMENT CONCRETE IN WARD NO 14 UNDER BOROUGH III
REPAIRING AND RENOVATION WORK OF PUBLIC TOILET AT TARATALA MORE IN WARD NO. -81 ,BOROUGH-X(K.M.C) UNDER ODF SCHEME
MAINTENANCE OF SEWER AND SEWER ADJUNCTS AT 168V,168Z KESHAB CHANDRA SEN STREET AND OTHER ADJACENT UTTARAN AREAS IN WARD NO -37,UNDER BOROUGH V
INSTALLATION OF LIGHTING SYSTEM AND OTHER ACCESSORIES AT 59/B/H/4 SAMBHUBABU LANE AND ITS ADJACENT AREA IN WARD NO 55
Urgent rewinding of rotor including replacement of damaged and burnt out components of 6 KV, 360 KW, NGEF make slip ring induction motor for 100 cusec capacity SWF pump unit. G at DLPS.
Day to day operation of 2 Two nos. Bed Cum 15 Passenger Lift for 3 three shifts installed at Central Block and Birla Block of Chittaranjan Seva Sadan, COGCH, Kolkata. for the period of three years
INSTALLATION OF MINI MAST LIGHT AND OTHER ACCESSORIES AT 7 L.M.B ROAD AND ITS ADJACENT AREA IN WARD NO 55
Day to day operation of 2 (Two) nos. Bed Cum 15 Passenger Lift for three shifts installed at Gplus5 storied Mother and Child Hub Building of Chittaranjan Seva Sadan, COGCH, Kolkata.for the period of three years
ANNUAL MAINTENANCE SERVICES FOR WATER PURIFICATION AND CONDITIONING SYSTEM (Version 2) - Potable water purification system with inbuilt water cooler.; 7 to 9; PACKAGE-5 : Water purifier and conditioning system maintenance involving basic servicing, f.., ANNUAL MAINTENANCE SERVICES FOR WATER PURIFICATION AND CONDITIONING SYSTEM (Version 2) - Potable Water Purification System Reverse Osmosis Or UV Based; 10 and above; PACKAGE-5 : Water purifier and conditioning system maintenance involving basic servi..
EI WORKS INCLUDING SOUND SYSTEM FOR UPGRADATION OF A ROOM NO 89 INTO SMART CLASS ROOM IN ORGANIC CHEMISTRY DEPT Of RAJABAZAR SCIENCE COLLEGE CAMPUS, C.U.
E-Tender for REFURBISHMENT, REPLACEMENT and RECONDITIONING OF BLOOD COLLECTION and TRANSPORTATION VANS (BCTV), STBC, HEALTH AND FAMILY WELFARE DEPARTMENT, GOVERNMENT OF WEST BENGAL.
Supply, Installation, Testing and Commissioning of 2.0 Ton Split (3 Star and 100 Percent Copper) Inverter Ac Machine at Ro Section, 1st Floor, Darbhanga Building, College Street Campus, University of Calcutta.
CUTTING, STACKING AND STORING OF RAW MATERIALS OF MACHINE SHOP AND CARPENTRY SHOPS FOR PRODUCTION OF VARIOUS ESSENTIAL PRODUCTS AND OTHER ALLIED WORKS UNDER EWS
ROOF TREATMENT WORKS BY BITUMINOUS WATER PROOFING MEMBRENE ( APP ) OVER THE ROOF OF TRANSFORMER ROOM, PANEL ROOM, BOILER ROOMS,ANALYTICAL CHEMISTRY ROOM AND STAFF QUARTER ROOM IN INSTITUTE JUTE TECHNOLOGY BUILDING UNDER UNIVERSITY OF CALCUTTA.
Manpower Outsourcing Services - Minimum wage - Unskilled; Not Required; Others, Manpower Outsourcing Services - Minimum wage - Skilled; Not Required; Others
Supply and delivery of different size customized pressed ply wood, wooden bit with necessary allied works for manufacturing of different types of office furniture at Carpentry shop
Electrical repair and renovation works of emergent nature related to internal and external electrification works at different buildings within the campus of Sambhunath Pandit Hospital, PG Polyclinic under SSKM (H) Electrical Sub-Division.
Fabrication work of DG Shed
Manufacturing, delivery and supply of special type Tools and Safety items with other allied works at Machine shop under EWS
Supply, Installation,Testing and Commissioning of Fire Detection and Alarm system at Shambhunath Pandit Hospital, Kolkata_20_ Urgent Spare parts of different make in existing Fire Detection System.
Air Conditioning Work for Reno. of Paediatric Surgery Wards and allied doctors room, Sister rooms, Teaching rooms at central portion of 2nd and 3rd fl. of main Bldg. within the campus of IPGMER_SSKM hosp., Kol._SITC of Fire Detection an Alarm system
REPAIRING OF DRAINAGE SYSTEM ALONG WITH SANITARY LINE BEHIND THE FOUNDRY WORKSHOP ALONG WITH OTHER ALLIED CIVIL WORK AT E.W.S.
ACM of Fire Detection System instal at dift. bldgs. in the campus of IPGMER-SSKM Hosp., Kol. and its Annex Hospitals and Inst. of Psychiatry, Kolkata under SSKM (H) Electrical Sub-Division, P.W.Dte._For 1 year
SITC of Feeder Pillar Panel For Power Distribution Segregation at Cardiology Building under I.P.G.M.E.R.-S.S.K.M. Hospital, Kolkata
INSTALLATION OF INSULATING MATERIALS ON THE STREET LIGHT POLES AT DIFFERENT PLACES IN WARD NO 17 UNDER BR II
Erection of Strong Barricading with Allied Works on different stretches of road for different programmes of Govt. of West Bengal and movement of VVIPs during the year 2026 2027 Surrounding area of Bidhannagar
INSTALLATION OF INSULATING MATERIALS ON THE STREET LIGHT POLES AT DIFFERENT PLACES IN WARD NO 16 UNDER BR II
INSTALLATION OF INSULATING MATERIALS ON THE STREET LIGHT POLES AT DIFFERENT PLACES IN WARD NO 15 UNDER BR II
Urgent replacement of battery for 110 V battery bank installed at 33 6 KV GIS Sub Station in the Premises of IPGMER-SSKM Hospital, Kolkata. (Electrical Work)
Erection of Strong Barricading with Allied Works on different stretches of road for different programmes of Govt. of West Bengal and movement of VVIPs during the year 2026 2027 Surrounding area of Central West Kolkata
Modification and Expansion of Existing CCTV Room and Creation of New Rest Room for OC Outpost with necessary Electrical and Airconditioning Work in Ground Floor of Emergency Building at IPGMER-SSKM Hospital
SITC of Air Conditioning system and allied electrical installation works for the Paediatric Cathlab of the Department of Cardiology in the campus of IPGMER_SSKM Hospital Kolkata_Air Conditioning works.
SITC of Fire Detection and Alarm System at Main Building, Annex Building and Curved Building at Kolkata Police Hospital, IPGMER-SSKM annex-VI-Electrical Installation Works
Air Conditioning work at Neonatology SSKM
Erection of Strong Barricading with Allied Works on different stretches of road for different programmes of Govt. of West Bengal and movement of VVIPs during the year 2026 2027 Surrounding area of Central East Kolkata
Emergent rep. of dilapidated portion including up gradation of floor and toilets and face lifting of Gr 1st 2nd fl. cabins total 19 nos cabin and other ancillary works at cardiology building,under IPGMER-SSKM, during the year 24_25_E.I. Work
Electrical Installation work in the DNB Quarters present within the campus of Bijoygarh State General Hospital, South 24 Pgs.
ENGAGEMENT OF LABOUR FOR DAILY MAINTENANCE OF GARDENS AT DIFFERENT PLACES AND GOABAGAN PARK FOR FINACIAL YEAR 2026-2027 IN WARD 16, BR-II
Addition and alteration of existing Electrical Installation for Up-gradation as PWD Standard of Bijoygarh State General Hospital, South 24 Parganas-SITC OF DG Set
LED Luminaire For Road And Street Lights Conforming To IS 10322 (Part 5/Section 3) (V3) (Under BIS Scheme - II) (Q2)
Electrical work for the power supply to the new dedicated sprinkler Pump at Vidyasagar SGH Behala South 24 Parganas
Annual Maintenance Service - Photocopier Machine - Photocopier Machines ( Monochrome, Laser, Separate Drum & Tonner, High range); Canon; OEM Authorised Service Provider
Erection of Strong Barricading with Allied Works on different stretches of road for different programmes of Govt. of West Bengal and movement of VVIPs during the year 2026 2027 Surrounding area of South West Kolkata
Supplying and commissioning of Desktop (HP/DELL or Equivalent) and 2 KVA UPS for office of Botany Department (DBT-Builder) in Ballygunge Science College Campus under the University of Calcutta.