Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
1,276 results • Latest
Repair and Maintenance of CHC building at Nirmand
Monthly Basis Cab and Taxi Hiring Service - Without Fuel - MUV; Mahindra Bolero Camper (BS-VI or higher)/Multi Utility vehicle (2600CC or higher); 2025; The date of registration of the vehicle to be deployed shall not be more than 90 days old as on d..
(SH Construction of wet well, toe wall, intake chamber and manual coarse bar screen chamber)
Garlic (Lahsun) Fresh
C.O. Jhajar Pul to Choki road Km 0.000 to 4.215 HP06392
Construction of road from Thachwi to Ladher Km 0.000 to 5.390 HP06373
Upgradation of link road from Dwahkenchi to Badari Km 0.000 to 5.775 HP06382
Upgradation of road from Kalog to Shilli Himri Km 0.000 to 15.740 HP06360
C.O. road from Taluna to Nisani KM 0.000 to 4.945 HP06372
C.O. Khanag Shush Takrasi upto Baloo road Km 0.000 to 18.000 HP06369
C.O. Link road from Bagipul to Nagadi Km 0.000 to 2/610 HP06364
Annual Maintenance Service - Photocopier Machine - Photocopier Machine; Xerox; OEM Authorised Service Provider
Construction of road from NH305 to Kanal via Bagtroi Km 0.000 to 3.510 HP06374
Up-gradation of road from Dohgad to Khalair Km 0.000 to 2.700 HP06363
Construction of breast wall of Gantry structure between Tower No. 61 and 62 of 220 kV DC Charor Banala Transmission Line under HPPTCL PIU Sarabai, District Kullu, H.P. 175125
Chili (??? ?????) (Q4), Fenugreek (????) (Q4), Turmeric (Haldi) (?????) (Q3), Tamarind (????) (Q3), Black Pepper (???? ?????) (Q4), Cloves (????) (Q3), Cumin (????) (Q4), Large Cardamom (Badi Elaichi) as per IS 13446 (Q4), Spices And Condiments - Coriander, Whole And Ground (V2) Conforming to IS 2443 (Q3) (3 (3 ))
(SH Source Strengthening of WSS Kullu Town by tapping additional water source though lift for Ward No-4,7,10 and 11 by drilling and Lowering 2 Nos borewell near Shishamati Bihal)
(SH Operation, running, repair and maintenance of water treatment plant at Charor Nallah for 6 Months.)
SH Providing fabrication and errection of MS Zinc Aluminium Steel storage tank of 40000 ltr at Tosh Under PDNA
Upgradation of Punan to Gaad Deem road Km 0.000 to 10.345 HP06361
Construction of road from Romali to Deem Km 0.000 to 6.400 HP06359
Construction of Link road from Tikkar to Tirkridal via Challown upto Punan Khad Km 0.000 to 5.500 HP06379
Construction of Link road from Sisri to Takrasi Tharvi Km 0.000 to 4.350 HP06371
Construction of retaining wall in front of type-II qtr. 6 Nos at Jail Kullu Distt. Kullu (HP).
SPARES FOR GEN SET 50 KVA MAKE ESCORTS
Supply and Installation of Modular Workstations
Inj Diazepam 2ml amp, Isabgol husk, Gloves non sterile pkt of 50, Turpentine oil, Magnesium sulphate, Inj Prednisolone 10ml, Inj Dexamethasone 30ml, Kol L bott of 500ml, Urine culture bottle 50ml, Liq Glycerin, Inj Normal saline bott of 1000ml
Restoration of Rain Damage on Brow to Poshna road Km 0/000 to 13/180
A/R and M/O non residential building under Outer Seraj Division Nirmand
R.R. Damages on Ranabag Karshaigad road km 0/000 to 14/510
REPAIR/ REPLACEMENT TO WOOVEN, WOODEN, PVC AND OTHER WORKS AT DGRE RDC, MANALI
Annual maintenance Plan-1 for the year 2025-26 on Lower Badah to Upper Badah Km 0/00 to 0/430 (SH Providing and laying G-III and 25 mm thick Bitumen concrete in Km. 0/00 to 0/430
(SH- C/O wire crates embankments for protection of Existing pump, sedimentation tank filter bed and allied civil structure)
Annual maintenance Plan-1 for the year 2025-26 on Mohal Soh to PWD Workshop Km 0/00 to 01/00 (SH Providing and laying G-III and 25 mm thick Bitumen concrete in Km. 0/00 to 1/00 (OTMNP
Annual maintenance Plan-1 for the year 2025-26 on approach road to Bhutnath Bridge Km 0/00 to 0/750 (SH Providing and laying G-III and 25 mm thick Bitumen concrete in Km. 0/00 to 1/750
Annual maintenance Plan-1 for the year 2025-26 on Sainik Chowk Bhunter to Ramshilla Manali left Bank Road Km 7/00 to 13/500 (SH Providing and laying G-III and 25 mm thick Bitumen concrete in Km. 7/00 to 13/00 (MDR).
SH- Providing and laying G-III and using 25 mm thick Bituminous concrete in Km 0/00 to 4/00 and 2.5mm thick (10cm wide)thermoplastic paint in Km 0/00 to 4/00 (PMGSY Roads
Purchase of spare parts for Flowmore Make Cooling Water
Repair and Maintenance of 200 Rmts Span Motorized over River Beas at Chulla to Seoh Sub Head Tightening Track rope and haulage rope of ropeway replacement of Old Uclamps and MS Pulley
Repair restoration work of Boundary Wall Construction of retaining wall for GPS Mariage Block Naggar Distt Kullu HP under PDNA 2023
Construction of Boundary Wall for GPS Rajgiri Block Kullu I Distt Kullu HP under PDNA 2023
Restoration of rain damages on Raichi to Khani road Km 0/00 to 2/065
Restoration of rain damages on various roads under Anni Sub-Division under Khanag Section
RRD on Kais Soyal Sour Kotadhar road
Restortaion of work and sanititation project in cities of CO sewarge network adjoining in area of Sainik Chowk Bhunter Ramshilla Kullu Manali left bank road
RRD on Siyal Balsari road
Soil investigation for CO 75 mtr span double lane PSC Box Girder over river Beas at 15 miles Distt Kullu
RRD on Ramshilla Bhekhali Beaser road
RRD on link raod from Katrain to HPMC road