Loading…
Loading…
Published at tender.apeprocurement.gov.in, Andhra Pradesh's official e-procurement portal.
1,943 results • Latest
Construction of CC Drain in Various Places of Kothuru area in Nandamuru village of Kovvur Mandal. Est. Cost: Rs. 15.00 Lakhs
Construction of CC drains in various places of Ballipadu village of Tallapudi(M) Est. Cost: Rs. 10.00 Lakhs
Annual maintenance contract of Residual Chlorine for Town Service Reservoirs under AE(WSM) -25 TSR section in GVMC, Visakhapatnam for the year 2026-27
Annual Maintenance Contract of Disinfection of Raiwada clear water at 1500 KL GLSR at Padmanabhapuram under AE (WS)-HWWs section in GVMC, Visakhapatnam for the period of 4 months.(from 01-12-2026 to 31-03-2027)
Annual Maintenance Contract of Supply and delivery of Aluminum Ferric Alum to 15.00 MGD Raiwada Water Treatment Plant at Narava of GVMC under AE (WS)-HWWs section in GVMC, Visakhapatnam for the period of 4 months.(from 01-12-2026 to 31-03-2027)
Annual Maintenance Contract of Removal of weed growth, nachu and any other obstructions under water from Irrigation Raiwada left canal from Dam Main regulator to GVMC head sluice at 0.00 Km in Devarapalli under AE (WS)-HWWs section in GVMC, Visakhapatnam for the period of 4 months.(from 01-12-2026 to 31-03-2027)
Hire and engage of vehicles for patrolling the Raiwada link canal from 0.00 km to 58.43kmunder AE (WS)-HWWs section in GVMC, Visakhapatnam for the period of 4 months. (from 01-12-2026 to 31-03-2027)
Annual Maintenance Contract of Repairs, reconditioning and maintenance of damaged existing suitable CI, DI D/F gear wheel type sluice valves in 15.00 MGD WTP at Narava under AE (WS)-HWWs section in GVMC, Visakhapatnam for the period of 4 months.(from 01-12-2026 to 31-03-2027)
Annual Maintenance Contract of 1000mm dia PSC, 800mm dia CI (Pumping), 800mm dia PSC and 600mm dia Gravity main (Raiwada Pipe line) and replacement of damaged valves (15 MGD WTP) from Narava Filtration plant to TSR under AE (WS)-HWWs section in GVMC, Visakhapatnam for the period of 4 months.(from 01-12-2026 to 31-03-2027)
Annual Maintenance Contract of Arresting leaks, breaches and removal of silt and weed on raiwada Link Canal from Davarapalli to narava under AE (WS)-HWWs in GVMC, Visakhapatnam for the period of 4 months.(from 01-12-2026 to 31-03-2027)
Annual Maintenance Contract of Disinfection of clear water at Block No. 15,18,22,24 and Tatichetlapalem for Raiwada 15MGD Water Treatment plantunder AE (WS)-HWWs section in GVMC, Visakhapatnam for the period of 4 months.(from 01-12-2026 to 31-03-2027)
Annual Maintenance Contract of Cleaning of 15MGD Water treatment plant clarifiers, 1500KL Clear water sump at Narava and Padmanabha puram under AE (WS)-HWWs section in GVMC, Visakhapatnam for the period of 4 months.(from 01-12-2026 to 31-03-2027)
Annual Maintenance Contract of Removal of weed growth, nachu and any other obstructions under water from chainage of 0.00 Km to 14.00 KM in Raiwada link canal under AE (WS)-HWWs section in GVMC, Visakhapatnam for the period of 4 months.(from 01-12-2026 to 31-03-2027)
Construction of Bhavitha Centre (for CWSN/Disabled Children) at MPPS Mosayyapeta of Chodapalli Village in Atchuthapuram Mandal
Erection of 33kV 7.2 MVAR Capacitor Bank with series reactors and NCT along with associated bay equipment at 132kV Parvathipuram Substation under RMI scheme 22 23
Construction of Bhavitha Centre for CWSN/Disabled Children at MPPS Butchayyapeta Village in Butchayyapeta Mandal.
Construction of Bhavitha Centre for CWSN Disabled Children at MPPS Devarapalli Main Village in Devarapalli Mandal
Construction of Bhavitha Centre for CWSN Disabled Children at ZPHS Boys V Madugula Mandal
Construction of Bhavitha Centre for CWSN Disabled Children at MPPS Rolugunta Main Village in Rolugunta Mandal
Improvements to Existing Buildings of Govt Polytechnic Narsipatnam in Narasipatnam Village and Mandal in Anakapalli District
Erection of 33kV, 7.2 MVAR Capacitor Bank with series reactors and NCT along with associated bay equipment at 132kV Saluru Substation under RMI scheme for 2022-23.
Rescue and Fire Fighting Equipment required for conducting Rescue operations during emergencies
Operation and maintenance of Lotus water fountain at Pedagadili Junction BRTS Simhachalam Road in Ward No.12, East Zone of GVMC for one year
Improvements and Special Repairs to Sri Malleswara Swamy Temple, Siragarapalli(V), Yalamanchili(M), West Godavari dist
Improvements and Special Repairs to Sri Visweswara Swamy Temple, Rusthumbada (V), Narasapuram Town, West Godavari Dist
Improvements and Special Repairs to Sri Seetharama Swamy Temple, Medicherlapalem(V), Malkipuram(M), Dr.B.R.Ambedkar konaseema dist
Improvements and Special Repairs to Sri Chandra Shekara Swamy Temple, Deva Penugonda(V), Penugonda(M), West Godavari dist
Improvements and Special Repairs to Sri Markandeya Swamy Temple, Gudugallabaga(V), K Gangavaram(M), Dr.B.R.Ambedkar Konaseema Distr
Improvements and Special Repairs to Sri Gowthameswara Swamy Temple, Ravipadu(V), Palakollu(M), West Godavari Dist
Consruction of Compound wall and Walking track at Bhaskarapuram Park beside of ELSR in 12th Division of Machilipatnam Municipal Corporation.
Construction of Compound wall and Shelter to Hindu Burial Ground, in Gilakaladindi, Division No.20 in Machilipatnam Municipal Corporation.
Improvements and Special Repairs to Sri Vydhyanandheswara Swamy Temple, Penumarru(V), Yalamanchili(M), West Godavari dist
Improvements and Special Repairs to Sri Agastheswara Swamy Temple, Vadali(V), Penugonda(M), West Godavari Dist
Improvements and Special Repairs to Sri Venkateswara Swamy Temple, Vasthaduvaripeta(V), Narasapuram Town, West Godavari Dist
Improvements and Special Repairs to Sri Venugopala Swamy Temple, Illaparru(V), Penugonda (M), West Godavari dist
Improvements and Special Repairs to Sri Rameswara Swamy Temple, Achanta (V), (M), West Godavri Dist
Improvements and Special Repairs to Sri Narendra Swamy Temple, Kaza(V), Yalamanchili(M), West Godavari DT
Improvements and Special Repairs to Sri Madana Gopala Swamy Temple, Achanta(V) (M), West Godavri Dist
Providing and Fixing GI Steps for Access to the Ambedkar Statue at Judge Bungalow Reservoirs in the 50th Division of RMC.
Upgradation of BT Road to CC Road at D.No.69-21-9/A to D.No.69-21-8/2, Bhaskar Nagar Internal Roads in 50th Division of RMC.
Providing CC Road and CC Drain from Door No.16-1-2/4 to 16-1-2/2 and from Door No.16-1-2/6 to 16-1-2/7 at Sri Ram Nagar in 41st Division of RMC.
Upgradation of CC Drain near Sarangadhara Metta Temple Streets in the 48th Division of RMC.
Procurement of 24W to 72W LED Drivers for the Maintenance of Street Lighting from 1 to 50 Divisions of RMC.
Construction of Community Hall in SC Colony(Madigapalli) of Uppugunduru (V) of NG Padu (M) Est cost 25.00
Procurement of 90W LED Drivers for the Maintenance of Street Lighting from 1 to 50 Divisions of RMC. (2nd Call)
Maintenance and Repairs to Swarna Ward Building (70, 71) in Seethampeta at 38th Division of RMC.
Providing Compound Wall and Roof Sheet for Toilets & Parapet wall to MPL PS Veerabhadrapuram Special School in 36th Division of RMC.
Construction of Community Hall in SC Colony of Rachavaripalem v of Maddipadu M Est cost 15.00
Construction of Fishermen Nets Storage Building in Chinvaripalem Habitation of Gundamala GP of Kothapatnam Mandal.
Construction of Comunity Hall at Pinnivaripalem Habitation in Gundamala GP of Kothapatnam Mandal Grant National Panchayat Award funds utilization Est cost 7.50L