Loading…
Loading…
15,354 results • Latest
C/o Sangnali to upper chalhar via tharu road km. 0/00 to 0/800 (SH- C/O R/wall at Rd 0/070 to 0/085 on Link road juction starts from RD 0/600) 5054 RB
RRD on Rada Nallah to Dhandal road from km. 0/00 to 2/900. (SH- P/L cement concrete on both side between RD 01/340 to 1/760) Under PDNA 2023
Balance work of link road from IPH Colony to Khilroo Bindraban connecting Jamwal Colony Katoch Awadi CVD Khalet at Lekh Raj house Km 0/00 to 4/00 (SW- P/L RCC Slab 2.00 mtrs span RCC Slab Culvert)
RRD on Ganpati Kun Ka Tar road km. 0/00 to 21/500. (SH- C/o B/wall at Rd 0/860 to 0/910) under PDNA 2023
.
Balance Work of Interlocking Tile work of Path towards the house of Umma Sharma, Sanjiv Sharma and other at Khilroo (MC Deposit) (SW- P/L Interlocking Tile work at RD 0/050 to 0/113 and Edge wall 0/075 to 0/086)
Repair and Rewinding of 75 HP motor of LWSS Tarapur Patengli alongwith P/F of MCCB volt meter, copper cable, main switch etc. repair of starter, pannel board, P/F kit kat and sluice valve etc. at LWSS Kogi Shalli, P/F of start button, ampere meter,
RRD on Sain Sadoh Road km. 0/00 to 14/00 (SH - C/O RCC Slab culvert at Rd 0/420) PDNA 2025
Balance work of C/o Science Lab at Govt. Sr. Sec. School at Rajpur Tehsil Palampur Distt. Kangra (HP) (SW-Cutting work and stone Breaking).
Construction of footpath bridge Sh. Jagat Ram S/o Late Sh. Tulsi Ram House ward no. 6 Village Sanyardi P.O. Talyahar Tehsil sadar District Mandi (H.P) M.C. Deposit
E-Tender for Partial Turn-Key Basis for Prov. 11 KV HT Line, 11/.4 KV 2x100 KVA an 2x63 KVA Sub-Station and CT/PT unit along with metering equipment for SOP to LWSS Jakhal and adjoining village GP Thoantha Jakhal GP Kota Pab and GP Sankholi in ESTimb
Balance work of Interlocking Tile work from main road Dharamshala Yol Dadh towards the house of Colonel Chamaru Ram (MC Deposit) (SW- P/L Interlocking Tile work at RD 0/015 to 0/060)
Balance work on Rada Nallah to Dhandal road km. 0/00 to 2/900. (SH- C/O PCC R/wall at Rd 2/898.50 to 2/906) PDNA 2023
pipes of various dia etc. ) under PDNA.2023 (Job No.I)
RRD on Gatterabag Upperla Thanout via Sehli road km. 0/00 to 8/200 (SH- C/O R/wall in PCC at RD 1/220 TO 1/233, PL RCC HPC 600mm Dia at RD 1/225), under PDNA 2025
Balance work of C/o road from House of Sh. Dinesh Sood to Sh. Raman Sood house Ward No.4 (SW- P/L 60 MM thick Interlocking Paver Block at RD 0/103 to 0/211 (MMGSY).
RRD on Rada Nallah to karkoh Arthi road Km. 0/00 to 12/300. (Sh- C/O PCC R/wall at Rd 04/135 to 04/147) PDNA 2025
Restoration of rain damage on Motipur Dudar road km. 0/00 to 2/500. (SH- Construction of R/wall in km. 0/065 to 0/072) Under PDNA 2023
Supplying installation testing and commissioning of 500 KVA D.G. set control gear cables and 5 years CMC in the premises of national institute of fashion and technology at Chheb in Distt. Kangra (H.P).
Restoration of rain damages on Jhajjakothi Matiyund road km 0/0 to 3/550 (SH Providing R/wall at Rd 3/320 TO 3/344 (Under PDNA 2023)
.
Restoration of rain damages on Jhajjakothi Matiyund road km 0/0 to 3/550 (SH Providing R/wall at Rd 0/115 to 0/128, 3/280 to 3/310 and Drain between Rd 2/200 to 2/230 (Under PDNA 2023)
in pump house etc. ) under PDNA.2023.
Restoration of raind damages on Khalanoo to Mahan road km. 0/00 to 2/800. (SH- C/O Balance wall at Rd 2/680 to 2/706) Under PDNA
.
C/O U-shape drain
Rewinding and repair of 40HP motor LWSS Jagyalru 1st stage and Rewinding and repair of 40HP motor starter at LWSS Mehli Pujarli Stage -ll and repair of stater of LWSS Lambidhar Lindidhar Phase-ll etc.)
Restoration of rain damages on Jhajjakothi Matiyund road km 0/0 to 3/550 (SH Providing R/wall at Rd 0/040 to 0/050 and 0/250 to 0/865 (under PDNA 2023)
various dia in Distribution system, and replacement of old filter media etc.) under PDNA.2023.
.
.
.
Construction of link road Village Kothi in G.P. Kothi SH Formation cuting at RD 0/330 and Construction of R.C.C Slab culvert 3.00 mtr span at Rd 0/340 Under MMSY
.
.
Construction of link road from Kullarun to DAV School to Civil Court Ghumarwin SH Construction of Hume Pipe Culvert at RD 0/040 and Interlocking Paver Blocks at km 0/00 to 0/080Under DMFT
C/o R/wall at Rd 1/510 to 1/522 and 1/735 to 1/740 (BASP)
.
RRD on Deodhar Kheelgalo road km. 0/00 to 24/500. (SH- P/L 80mm thick interlocking paver block at RD 10/175 to 10/210 and U-shape drain at various Rds) Under PDNA 2023
Restoration of rain damages on Barota to Kudi Ghat road km 0/00 to 1/500 SH Providng and laying Cement concrete pavement at RD 0/900 to 1/016.50 and R/wall at RD 1/305 to 1/315 under PDNA year 2023.
.
Construction of link road to Lower Dakhyut from Dangar Chokhna road G.P. Dangar SH Providing and laying Cement concrete pavement at various damage reaches Under MMSY
Restoration work of 22 KV HT Line damaged due to heavy Rain/ land sliding at Noti Khad (Chaba 1 and Chaba 2 Double Ckt under Electrical Sub-Division HPSEBL Sunni
Restoration work of 22 KV HT Line damaged due to heavy Rain/ land sliding at Noti Khad (Kadharghat and Old Sunni Feeder under Electrical Sub-Division HPSEBL, Sunni and Jalog
Repair of 1.00 mtr span Culvert at RD 7/150 and R/wall at RD 7/152 to 7/156
Construction of link road Chimba Basti G.P. Seu SH Providing and laying cement concrete pavement at RD 0/00 to 0/100 AND 0/240 to 0/400 Under SDRF/NDRF
Providng and laying L CC pavement
RRD on Khadkalyana Dolra Balh road 0/00 to 6/200 (SH- Protection of Abutment of slab culvert at Rd 1/050).