Loading…
Loading…
15,354 results • Latest
HPSEBL/GPHD/DB-9/2026-27-45
Providing and fixing of Insulation Mat Class A, Class B - Blue and Orange for Control Room, LT Room, Machine Hall of 2x11.25MW Ganvi Power House Stage 1.
Removal of Slips (i) Eversunny to Golcha Bhont road km.0/00 to 6/270 (ii) Eversunny to Pagog road km. 0/00 to 5/00) (Excluding GST
Supply of Mineral Turpentine Oil (MT Oil) for power house under Ganvi Power House Division, HPSEBL, Jeori
Construction of R/Wall between Rd 0/450 to 0/465
C/O R/Wall at Rd 4/295 to 4/310
Maintaining/Observation of Water Level at Forebay of Ganvi Power House Stage 1 round the clock and conveying the same to intake and control room of Ganvi Power House Stage 1 and cleaning of trash rack at Forebay wef 01.08.2026 to30.11.2026 (122 days)
Repair of Store Shutter Shed No.2, Weighing all the scrap and providing steel gate for fencing of the divisional store at Kotla
A/R and M/O of Road from Koti to Mundaghat via Moi Jubber Km 0/00 to 5/130 2. A/R and M/O of Road from Koti to Padechi. Km 0/00 to 7/080
Restoration of R R masonary wall RD 20.00 to 40.00m upstream of right side guide wall of trench weir damaged/ washed away during the month of 08/2025.
Periodic Maintenance of Earthern Shoulder, Drain , Culvert, Sign Board, 200 meter stone, Kilometer stone and White Washing of Parapets in Km RD 12/375 to 22/375
C/O Hill cutting and removal of earth between km. 1/360 to 1/500 and up lift of protection wall km.1/502 in wire crate near Via duct pier of NHAI (BALANCE WORK) (Excluding GST
Restoration of damaged river side protection wall of 2x11.25MW Ganvi-I d/s of left abutment of bailley bridge RD 25.00 to 50.00m by c/o cement concrete wall which was damaged due to heavy flood in Ganvi khad on dated 13.08.2025. under Ganvi Power H
A/R and M/O on Providing staff for maintenance of Shoghi Mehli Junga Sadhupul road in Km 12/375 to 48/925 under Junga Sub-Division
O and M of Ganvi Power House Stage 2
C/o retaining wall RD 0.00m to 18.00m for the protection of high mask light structure at Ganvi stage-II intake damaged due to heavy flood in Ganvi khad on on dated 13.08.2025 . under Ganvi Power House Division HPSEBL Jeori.
Construction of R/Wall between Rd 0/700 to 0/719
Construction of 120mtr span bridge at Rampur on Una Santoshgarh road at RD.1.760 in Distt. Una (SH General Arrangement Drawings Structural design of substructure and superstructu
CO Pump house,CO16 Nos Outlet,CO Delivery Tank and laying jointing and testing of 140mm, 160 mm,180mm 200mm dia HDPE pipe in distribution system) Tube well NO 23 at Chuharpur
Construction of 120 mtr. span bridge at Rampur on Una Santoshgarh road at RD.1.760 in Distt. Una (SH Preparation of Hydraulic data and soil bearing capacity for construction of bridge)
Restoration of rain damages on Bhuthi Bhalyani road km 0/00 to 4/500 (SH-Construction of Retaining Wall at RD 0/090 to 0/105,0/380 to 0/390, 2/200 to 2/210 and 2/300 to 2/308) under PDNA
Restoration of rain damages on Darka Bhumteer road Km 0/000 to 7/000 (SH- Construction of wire crated Breast wall at Km 0/125 to 0/145).
Restoration of rain damages to LWSS Dehrian under JSV
Tender for providing cutting and lopping of tree branches underneath 22 KV HT Lines line LT line (E) Section Charkhari,Rohanda Behli under ESD ,HPSEB,LTD. Nihri
P/FMS Jafri and polycarbonate in Type-V and VI at Kasumpti Shimla.) (Excluding GST
Restoration of rain damages on Darka Bhumteer road Km 0/00 to 7/00 (SH- Construction of Retaining wall from Km 3/970 to 4/00).
Proposedsite for strengthening of valley side on Khalanoo to Mahan road Km. 0/00 to 2/800 (SH- Bio engineering works at Triambi at KM 1/780 to 1/810.
Tender for providing cutting and lopping of tree branches underneath 22 KV HT Lines line LT line (E) Section Nihri-Ist , Nihri-IInd Kumharu under ESD ,HPSEB,LTD. Nihri
RRD on Saigaloo Sukka Kun road km. 0/00 to 4/00 (SH- C/O PCC R/wall at Rd 0/380 to 3/090) under PDNA 2025
RRD on Saigaloo Nalhog road km. 0/00 to 6/400. (SH- C/O PCC R/wall at Rd 06/330 to 6/336) Under PDNA 2025
RRD on Rada Nallah to Dhandal road km. 0/00 to 2/900 (SH- P/L cement on both side berms between Rd 02/040 to 02/320) under PDNA 2023
RRD on Rada Nallah to Dhandal road from Km. 0/00 to 2/900. (SH- P/L cement concrete on both side berms between RD 1/760 to 2/040) Under PDNA 2023
RRD on Pandoh Seyog road km. 0/00 to 4/00. (SH-C/o U-Shape drain in Km. 2/825 to 3/045) Under PDNA 2023.
Hiring of Crawler Mounted Hydraulic vath Be Excavator Operating Weight 20 22 Tonnes With Bucket Capacity not less than 1.10 Cum for Removal of Formation Deficiencies including Cutting
Removal of slips and landslides at various reaches
Deposit estimate for providing SOP to Summit Digital Infrastructure Pvt. Limited by Aug. of 63 KVA 11/0.4 KV Khund DTR to 100 KVA in (E) Section Urla under ESD, HPSEBL, Padhar.
C/o Bailey Bridge over Marathu Khad on Link road to village Lohat, Supplying and erection of 33.54 mtr span DSR Bailey Bridge at site over Marathu Khad on Link road to Village Lohat
SH Construction of 900mm dia hume pipe culvert at RD 3.645 providing and laying cement concrete pavement at RD 0.360 to 0.550 3.100 to 3.795
Tender for restoration of 33 KV HT Bijni Padhar line affected with land sliding near 132 / 66 / 33 kV Sub- Station Bijani by rerouting existing 33 KV Line under Electrical Sub- Division Padhar.
Estimate for replacement of lengthy service wire and LT extension from various existing Sub-Stations in (E) Sections Local and Khaddar under ESD, HPSEBL, Lad Bharol.
SH C.O R.wall from Km. 0.420 to 0.445
SH C.O R.wall from Km. 0.315 to 0.340
Deposit estimate for shifting of 3-Phase L.T. Line passing over the plot of Sh. Kamlesh Kumar at Village Balakrupi in (E) Section Balakrupi under ESD No I, HPSEBL, Joginder Nagar.
SH Painting, Distempering, wall ceiling and flooring etc. in Mortuary Hall and Dr s residence
SH providing and laying interlocking paver block pavement at RD 3.050 to 3.125 cement concrete pavement at RD 3.315 to 3.415 and construction of edge wall and U shape drain at RD 3.315 to 3.450 LHS
Estimate for Aug. of 63KVA 11/0.4 KV Machkehar DTR to 100 KVA and LT extension in (E) Section Local and Ahju under ESD, HPSEBL, Chauntra.
(SH- Operation and maintenance the schemes for 6 months)
Providing and laying bituminous concrete at RD 0/415 to 0/535, 0/970 to 2/350, 3/400 to 3/490 and 4/0 to 4/500 on damaged portion patches at various RDs
Restoration of Rain Damages on Sh. Naina Devi ji Bhakra road
Providing and laying bituminous concrete at RD 63/320 to 65/320 and 60/320 to 62/335 on damages portion patches at various RDs