Loading…
Loading…
8,804 results • Latest
RWD/CBSA/STPKG/02/2024-25
RWD/CBSA/STPKG/01/2024-25
RWD/CBSA/STPKG/06/2023-24
Construction of PCC Road From Main Road to Ayushman Arogay Mandir Kabri Goindi and Bandua Block Garu and saryu Distt Latehar
BILL OF QUANTITIES FOR THE PROPOSED CONSTRUCTION OF MULTIPURPOSE CENTRE AT KARAMTOLI DIST RANCHI
Construction of E.G.S./I.C.D.S. Centre (Anganwadi) Building at Mahathadih Bhuiya Dhoura Under Baghmara Block, Dist. Dhanbad.
Construction of E.G.S./I.C.D.S. Centre (Anganwadi) Building at Dagdho (NPS Dagdho) Under Baghmara Block, Dist. Dhanbad
Revival of Defunct IM II hand pumps by Changing of 32 mm dia. RRP Connecting rod C.I Cylinder (wherever required) etc. in Rural Area within the jurisdiction of D.W and S. Div. No. 2, Dumka for the year 2026-27 (RRP-JAR-1)
Construction of Road from Gram Chhencha P.W.D. Road to R.E.O. Road via Yadav Tola (L-0.550 Km.)
Revival of Defunct IM II hand pumps by Changing of 32 mm dia. RRP Connecting rod C.I Cylinder (wherever required) etc. in Rural Area within the jurisdiction of D.W and S. Div. No. 2, Dumka for the year 2026-27 (RRP-JAM-2)
CONSTRUCTION OF BRIDGE IN MAHABURU CHOKEHUTUB NALA ON ROAD FROM VILLAGE JANGIBURU TO BICHABURU ATEKE IN PANCHAYAT PANGA UNDER BLOCK MANJHARI, DISTRICT-WEST SINGHBHUM DISTRICT.
supply of Medicines and Consumables in DH, CHC,PHC ,AAM in Ramgarh district
Constuction of 1000 meter Boundary wall, Guard Room and Main Gate at Model Degree College Goa, Latehar (Part-II) at Panchayat Jalimkhurd of Block Latehar under Latehar District.
Construction of Additional Class Room in 01 Existing Secondary and Higher Secondary Schools located at Suriya Block of Giridih District of North Chotanagpur Division of Jharkhand.
Remodelling of HSC as Labour Room under Belgaria Township Dhanbad
Construction of Water Supply Scheme with 1 HP DC Solar motor pump complete set and sanitary well for Panchayat- Forest Block, Village- Forest Block, Tola- Kolabariya (Jojodih Tola), Block Gurabandha in the District East Singhbhum. GUR/Drinking-04
Construction of High Level Bridge over Baskijore Nala at chainage 5th km in Sarath - Chitra Road (including construction of approach road) under Road Division, Deoghar
Construction of Boundary Wall at the balance portion and Installation of entrance gate at phase I,II and III of Belgaria Township, Dhanbad.
Construction of Health Sub Center KHURA KALA in Vill KHURA KALA, GP KHURA KALA, Block CHAINPUR District PALAMU under Zila Parishad, Palamu.
construction of P.C.C. road from Sonu Ansari house to Jarina Khatoon and Raza Ansari house to Sonu Medical via Karoo Ansari house at ward no 36, under Giridih Municipal Corporation, Giridih, Jharkhand.
CONSTRUCTION OF HEALTH SUB-CENTRE AT BASRIYA UNDER BLOCK SILLI, RANCHI
Construction of Drain from Sahara India more to Taxi stand at ward no.17 , under Giridih Municipal Corporation, Giridih Jharkhand.
CONSTRUCTION OF HEALTH SUB-CENTRE AT TUMANG UNDER BLOCK KHALRI RANCHI
Construction of PCC road from kali babu hata to Rajendra nagar Main road babhantoli to House of Ramesh Mishra at ward no 31.
Construction of PCC road and drain from Indra Colony more to BBC Road Kumhartoli and Different Galies at ward no 16, Under GMC.
CONSTRUCTION OF CHIEF MINISTER SOLAR LIFT IRRIGATION SCHEME AT BADIA UNDER BLOCK- KARRON, DISTRICT- DEOGHAR
Construction of RCC Drain in RMK4 Colony from rmk4-314 via rmk4-305 to culvert and rmk4-300 via rmk4-292 to culvert and from lions public school via rmk4-214 to culvert and rmk4-04 via rmk4-01 to culvert and M,L Type colony from L-356, L-307 to culve
Construction of PCC road from Gandey main road to kali Manda via sanjay ram house at ward no.12, under Giridih Municipal Corporation, Giridih Jharkhand.
construction of drain from ashok hadi home to thakur chowk via sarkari kali manda to chhat ghat at ward no.28 under giridih municipal corporation ,giridih jharkhand
CONSTRUCTION OF HSC AT SOHGADA, PANCHAYAT RANADIH, BLOCK KANDI, DISTRICT GARHWA
RWD/EE/GODDA/13/2024-25, Construction of Road from Basuara Karu House to Sarotia Main Road via Jagir (L-1.000 Km.)
CONSTRUCTION OF HSC AT BAHAHARA, PANCHAYAT BAHAHARA, BLOCK RANKA, DISTRICT GARHWA
CONSTRUCTION OF HSC AT MAKARI, PANCHAYAT BIRBAL, BLOCK SAGMA, DISTRICT GARHWA
RWD/EE/GODDA/38/2024-25, Construction of Road from Pasai to Badairadih (L-1.300 Km.)
CONSTRUCTION OF HSC AT HETAR KALA, PANCHAYAT HETAR KALA, BLOCK CHINIA, DISTRICT GARHWA
CONSTRUCTION OF HSC AT BILAITIKAIR, PANCHAYAT BILAITIKHAIR, BLOCK CHINIA, DISTRICT GARHWA
CONSTRUCTION OF SHG TRANING CENTRE AT VILL-TARANAGAR GP-TARANAGAR UNDER PAKUR BLOCK DIST-PAKUR
Revival of Defunct IM II Hand Pumps by Changing their Rotten Riser Pipes, damaged connecting rods, damaged C.I. Cylinders and other spare parts (wherever required) in Kuru Block of Lohardaga District under D.W. and S. Division, Lohardaga (Gr. 4)
Revival of Defunct IM II Hand Pumps by Changing their Rotten Riser Pipes, damaged connecting rods, damaged C.I. Cylinders and other spare parts (wherever required) in Kairo Block of Lohardaga District under D.W.and S. Division, Lohardaga (Gr 6)
Construction of Health Sub-Centre at JHINJHIPAHARI, Block -Baghmara, District - Dhanbad (Jharkhand)
Construction of RCC drain in Rajpati sah colony from Rohit jee house to Anuj kr.sinha house,Balram mahato house to Bada drain ,Near Ganga bhawan and Link gali in ward no 30 under DMC Dhanbad
Renovation of Chelwa Ahar, Village- Kadlaga, GP.-Damdoeya, Block-Chatra, Dist.-Chatra. (Gr.No.-05)
Construction of RCC Culvert at Rugututand REO road at Pakartand
Construction of RCC Culvert 1x1.5x1 at Chundiyari village and Haldibera village at Pakartand
Ordinary Repair (Pots and Patch) of Bahirgram-Patharghatta Road from 0.00 to 9.00 Km. under Road Division Pakur for the year 2025-26. (Non Plan Head).
Construction of PCC Road at village Jampani to Bambalkera Road in Panchayat Bambalkera Block Thethaltangar in Simdega Part-1