Loading…
Loading…
5,079 results • Latest
RENOVATION AND AUGMENTATION OF DUTY OFFICER ROOM AT GUARDROOM, INS SATAVAHANA
DCS system for Bitumen Tanks Project
Custom Bid for Services - Outsourcing of DGPS Marinestar correction signal subscription Similar Category E-content Service Subscription Based Model
Automatic third harmonic resistance current measurement kit
Re-Construction of Temple, Mukhamandapam and Re-Errection of Dwajam of Sri Annapurna Sametha Sri Mallikarjuna Swamy Temple Patchava(V) Jarugumalli(M),Prakasam District
Construction CC Drain From H No.128 Chnammala Vssudeva Rao House to H No.216 Amalapuram Jagadeesh house in Devinagar at Ward No.22
Construction of CC Drain from Door No.168 to Door No.138
Laying of CC Drain both sides from H.No.11-107, Peketi Narayana house to D.No.157,Gas Godown back side at Yathaveedhi in ward no 11 of Parvathipuram Municipality.
Construction of Compound wall to Burial ground opposite to Agnigangamma temple in ward No.22 of Parvathipuram Municipality.
Laying of CC Road from Door No.168 to Door No.138 in Agraharam Veedhi in ward No.20 of Parvathipuram Municipality
Construction of CC Road at Navadurga Medical Shop to E.P No S129/B9 in Cheruvu Gatuu Veedhi in Ward No.22 of Parvathipuram Municipality.
Construction of CC Road from D.No.292 Marrapu tatababu house to D. No.108 KSR in Vivek colony 20th ward of Parvathipuram Municipality
Construction of CC Drain from Alajangi Shankar rao house D.No 120 to Janjavathi canal EP No. SS 25/A12 at Rajeev colony main road 6th ward of Parvathipuram Municipality.
Construction of CC Drain from Opp. Ep No. SS-25A10/2(at Yeturi kusaraju house) to Opp. D.No. 121 (Alajangi Dinesh house) at Rajeev colony 6th ward of parvathipuram municipality
Construction of SW CC Drain from D.No 180 (Gavara lakshmi house) to D.No 134 (Ganta anuradha house back side) in vijayaramaraju colony in ward No.8 Parvathipuram municipality
Construction of SW CC Drain from D.No 174 (Patnayakuni vimala kumari house) to D.No 135 (Devakoti sankar rao house) in vijayaramaraju colony in Ward No.8 Parvathipuram municipality
Construction of SW Drain from Door No 239 G Sri rama murthy House to Door no 324 in YKM Colony in Ward No.19 of Parvathipuram Municipality.
Laying of CC Road From E.P SS64/A9 to E.P S171/A6 at Venkateswara Colony , 2nd ward in Parvathipuram Municipality
Construction of CC Drain from D.No.140 Behara Parvathi house to D.No.170 Peddinti Parvathi house at Chinamadiga Veedhi Back side and from H.No. 8-1-100 Yemmala Venkati house to H.No.8-1-134 Vujula Ankamma house at Mondipanda veedhi in Ward No.9 of Parvathipuram municipality
Laying of CC Road from Door No 239 G Sri rama murthy House to Door no 324 in YKM Colony in Ward No.19 of Parvathipuram Municipality.
Procurement of Spares for Screens-5&6 available in crusher House
INSTALLATION OF 100 KVA STABILIZER FOR POWER SUPPLY OF NCN KAKINADA AND SPECIAL REPAIRS FOR REPLACEMENT OF BER FIRE FIGHTING PUMP SETS AND SEWAGE PUMPS UNDER GE (U-II) VISAKHAPATNAM
SPECIAL REPAIR FOR RENEWAL OF OLD EXISTING FIRE FIGHTING SYSTEM AT NCB AND NOFRA UNDER GE (U-II) VISAKHAPATNAM
MAINTENANCE AND REPAIR / REPLACEMENT OF SERVICE PIPE LINES, FLOAT VALVES, CLEANING OF SERVICE TANKS INCLUDING REPAIR / REPLACEMENT OF SERVICE TANKS AT SVN COLONY, NIRMAN PARK AND 104 AREA UNDER GE (UTILITY-II) VISAKHAPATNAM
PROVN OF COMMON TOILET FOR SHOPPING COMPLEX AT K SECTOR DOLPHIN HILL UNDER GE (NB), VISAKHAPATNAM
REPAIRS AND CLEANING OF SEWAGE LINES AND SEPTIC TANKS, MAN HOLES AND ITS CONNECTED WORKS AT RESIDENTIAL AREA OF NSTL, VISAKHAPATNAM
SUPPLY OF GLASSWARE AND POLYTHENEWARE ITEMS REQUIRED FOR CHEMICAL DIVISION-II
Appointment of PGMS Agency for providing Project General Management Services for Chief Administrative Officer (Construction), South Coast Railway, Visakhapatnam, A.P.
Engagement of Project Management Consultant (PMC) for Providing MEP like high and low side Electrical, HVAC, Fire Protection System, Lifts, Fire Alarm and Public Address System and plumbing works ,Facade with Lighting and Interiors in Integrated Andhra Pradesh State Secretariat and HoD Offices (GAD Tower,Tower 1 and 2,Tower 3 and 4) in Amaravati Government Complex, Andhra Pradesh)
Construction of CC Road from H.No.8-1-100 Yemala Venkati house to H.No.8-1-134 Vujula Ankamma house at Mondipanda Veedhi Back side in ward No.9 of Parvathipuram municipality
Construction of Connecting CC Drain from D.No.9-5-74, Sweeper Veedhi to D.No.81-1-141 (Back Side) 900mm drain of Sweeper veedhi in Ward No.9 of Parvathipuram municipality
Construction of CC Drain EP No. SS 21/A2/6 Opposite to Yathaveedhi Junction at Neyyalaveedhi in ward No.10 of Parvathipuram Municipality.
DR.MVR RTPP- CHP- EMD- PROCUREMENT OF 90KW, 3PH, 50HZ, 415V LT MOTOR WITH DOUBLE ENDED SHAFT(MAKE: KIRLOSKAR)FOR WT-1&2 AND 110KW, 415V, 182AMPS,1482RPM,50HZ,FRAME:LD315MKII INDUCTION MOTOR.
1) MOLYKOTE 33M Grease (Silicon Base) 2) MOLYKOTE 55. Grease (01 kg Tin)
Comprehensive Annual Maintenance Contract of M/s. Laxven make Microprocessor based control and Fault Diagnostic System (MPCS) version "V3" fitted in Conventional Electric Locomotives for a period of 02 Years through OEM at Electric Loco Shed, Guntakal
Fire Breathing Apparatus SCBA as per IS 10245 (Part 2) (Q3) (3 (3 ))