Loading…
Loading…
69,428 results • Latest
Providing and laying of Domestic Sewer Network at Devanahalli General Industrial Area, Phase-2, Devanahalli Taluk, Bengaluru Rural District
Providing and laying of Effluent Network at Devanahalli General Industrial Area, Phase-2, Devanahalli Taluk, Bengaluru Rural District.
Survey, Investigation, Design, Supply, Installation, Erection, Laying, Construction and Commissioning Jackwell cum pump house, M S pipe Rising Main from Yetinahole Gravity canal to MS Gravity pipe near KWIN City including Pumping Machineries and allied works inside the pump houses, SCADA, Land Acquisition & 5 years of O&M for Providing & supplying fresh water to the industrial areas in districts around Bengaluru on EPC Basis. (Package-6)
construction Anjaneya swamy temple doddakodli village in somwarpet taluk
E-tender for extraction and transportation of Acacia pulpwood at unit no-19/2024-25 Simse-2016 plantation of N R Pura Unit, Chikkamagaluru Division
Consultancy Services for Preparation of DPR/DTS for Construction of Series of Shirpur Pattern Check Dams, Deepening & Widening of Nala & Recharge Shaft Works in Kalaburagi District
Construction of Muslim Samudaya Bhavan at Nalwar village in Chittapur Taluka under MLA LAD for the year 2024-25. (Continuation work)
Construction of Shadi Mahal at Nimbarga Village in Aland Taluka District Kalaburagi (Under Deposit work for the year 2024-25)
Providing Borewell pumping Machinary and Gescom work in SC ward at Arjunagi village in Afzalapur Taluka , PRoviding BOrewell pumping machinery and Gescom work in SC ward at Arjunagi Tanda in Afzalapur Taluka and Providing Borewell Rising main and Gescom work at Ghattarga HW in Afzalapur Taluka under KKRDB
CONSTRUCTION OF 4 CLASS ROOMS AND OTHER WORKS,GREEN BOARD AND SOFT BOARD,TOILET AND BOREWELL TO GOVERNMENT HIGHER PRIMARY SCHOOL AT DHUTTARGAON VILLAGE IN ALAND TALUKA (KLB257213592) (Work Reserved for Category-I)
Annual maintenance of Chintamani Gauribidanur (SH-259) Road from Ch. 15.82 km to 17.02 km, 19.02 km to 23.72 km, and 28.22 km to 38.23 km for the year 2026-27 in Chintamani Taluk, Chikkaballapur District. (Ch 0.00 km to 38.23 km) (NH-69 overlap of 0.28 km) (Others Category)
Improvements of approach road (ODC Road) connecting Baikampady Industrial Area from Y Junction, Mangaluru Taluk, Dakshina Kannada District.
Impact Evaluation of Ganga Kalyana, Land purchase, Self-employment, and Micro Credit Schemes of SCSP-TSP implemented by Karnataka Scheduled Caste & Scheduled Tribes Nomadic Development Corporation for the period from 2019-20 to 2023-24
Construction of Checkdam cum LLC/Bridge across Kushavathi Halla, near Mindagal village and restoration of Existing check dams cum LLC across Kushavathi halla near Bramanrahalli village, Yesagalahalli village and Kariyappanahalli village in Chintamani Taluk, Chikkaballapur District
Attending pipeline leakages in Badami & Kerur towns under O&M of Providing Water Supply Scheme to Badami-Kerur towns & 18 Enroute Villages with Almatti Dam Back water as source (Lumpsum).
Providing additional 3rd 5 MVA, 33/11KV power transformer at 33/11KV sub-station Katakol in Ramdurg Taluk, Belagavi District in 33KV S&L Division, Belagavi on PTK basis (5 MVA Power Transformer will be supplied by departmentally)
Annual Maintenance to MDR-14024-Road from Bharamasagara connecting Hosadurga (on SH225) via Nandihalli, Hemanaghatta, Bahaddurgatta, Muchanur, Bilchodu, Asagodu-JGL-3 From Ch 9.08 to 9.54 and 15.84 to 28.57 Km for the Year 2026-27 in Jagalur taluk, Davanagere Dist.
Repairs to C.D. from Padsawali to Hebali village in Aland Taluka under 5054 for the year 2025-26.
Drilling of Borewell and laying of Pipeline in Bhavani Nagar opposite Pujari Arch at ward no 5 in Kalaburagi City (Est Cost Rs. 2.2674 Lakhs) (Category-SC) (SFC Drinking Water 2019-20 to 2025-26 Savings)
Construction of 08 Class Rooms and Others to Govt Higher Primary School at Sitaramwadi in Chittapur Taluka Dise Code 29040411807 under KKRDB MICRO Akshara Avishkara for the year 2025-26 and 2026-27.
Raising of Plantation at Pastapur to Huvinbhavi (Road Side)3km in Chincholi Taluka-2026-27
Re-construction of Road from Sulepeth village to Kupnoor village 0.00 km to 3.00km in Chincholi Taluka under 5054 for the year 2025-26 (for S.C. Bidders only)
Construction of Retaining wall along SH149 at chainage km 29.55 Near Maradagi Village In Chittapur Talua Kalaburgi Dist. Under 5054-80-190-0-01-132 for the year 2025-26
Construction of Samuday Bhavan in ward no 40 Kalaburagi Taluka under BCM CM Special fund for the year 2024-25 (for S.C. Bidders only)
Construction of 3 class rooms to Govt. Higher Primary School at Gundalli village in Sedam Taluka under MP Lad for the year 2025-26
Providing Irrigation Facility by Drilling Borewell to Land Sy No. 189/1 of Samya Jairam in Waraknalli (Munderga) Village of Yadgir Taluka Yadgir District (UNDER SCP FOR THE YEAR 2025-26)
PROVIDING IRRIGATION FACILITIES THROUGH BOREWELL TO 1) SY NO.6/1 OF MUKANNA S/O HANAMANTRAY OF CHOWDESHWARIHAL VILLAGE 2)SY NO.57/1 OF RAGHAVENDRA S/O GOVINDAPPA OF WAGHANAGERA(JALIBENCHI) VILLAGEI 3) SY NO.27 OF SHARANAMMA W/O SHIVAPPA OF BADYAPUR VILLAGE IN SURPUR TALUKA YADGIR DISTRICT UNDER TSP FOR THE YEAR 2025-26
Drilling of Borewell and providing motor pipleine to Chaplanaik Tanda in Chincholi taluka and Providing Rising main pipeline at Dharmsagar village in Chincholi Taluka under KKRDB
Construction of OHT Motor and Pipeline at Ganjagera Tanda in Chincholi Taluka and Drilling of Borewell and providing motor pipeline to Ranapur Tanda in Chincholi Taluka under KKRDB
Repair to the existing cable duct in the station yard and other allied works at 220kV R/S Sedam.
Providing pumping machinary to existing borewell and providing rising main to OHT and DS at Udagi village drilling borewell and providng pumping machinery and rising main to OHT at Survar village providing Rising main existing borewell to OHT at Totanalli village Repair to OHT and laying of pipleine at Bijjanhalli village Construction of new OHT near GP office in Kukkunda village in Sedam Taluka under DMF
Comprehensive development of road drains and providing water supply and other allied work at minorities dominated Slum area Raichur Assembly Constituency.
Unbranded Lapi Patra (Putty Applicator) Size(length X Width) 6 4 inch 0.5 mm thick
Unbranded Silicone Carbide Sand Paper (Defense), Length 280 millimeter
Disconnection of cables, Supply, Laying of various sizes of LT cables along with Supply and commissioning of Dewatering pumps and accessories for cable trenches at Transformer bay
procurement of Water Supply Items and motor repair, rewinding items for Induvalu Grama panchayath
DISPOSAL OF FISHING RIGHTS OF UDDURU HONNEGOWDANA KERE OF HUNSUR TALUK FROM 2026-27 TO 2030-31 FOR A PERIOD OF FIVE YEAARS
DISPOSAL OF FISHING RIGHTS OF ASWALU TURUKANAKATTE KERE OF HUNSUR TALUK FROM 2026-27 TO 2030-21 (RESERVATION SC)
DISPOSAL OF FISHING RIGHTS OF GAVADAGERE KERE OF HUNSUR TALUK FROM 2026-27 TO 2030-31 FOR A PERIOD OF FIVE YEARS
Restoration of bad reaches and pothole to Bannerghatta Main Road From Dairy Circle (elevated metro train starting) to Vega City Mall
Improvements to road from Karknalli to Changlera From KM 0.00 to 0.55 in Chitguppa Taluka Bidar District Under KKRDB Macro for 2025-26. BDR254103185. (Reserved for 2A)
Proposed construction of Office Room, Store Room, Gallery, Balance works and Additional Works to Indoor stadium in First grade college Ground at Holenarasipura Town in Hassan District
Annual Maintenance to Gumballi to K Devarahalli joining Road via Yeragamballi, Dasanahundi From Ch.0.00 to 10.00KM in Yelandur Taluk.(YLN-15-T)
Tender for the work of Providing, Laying Pipe of 457mm dia-6.4mm thick MS Water Supply Pipeline Linking from 457mm dia MS feeder water pipeline from Central Avenue, RMZ Ecoworld Campus 30 to facilitate water supply facility to M/s RMZ Eco world Campus 20 & 21 coming under Doddakanahalli Service Station of AEE (E-4-2) Sub Division.
PROVIDE CANTEEN FACILITIES AT VANI VILAS HOSPITAL BMCRI
Providing Consultancy Services for the Preparation of DPR, Architectural, Structural and other services design and drawings for the work of Construction of an Integrated 200 Bedded Cancer Hospital and Institute, Inclusive of linear accelerator with Bunkers, Along With Necessary Equipment and Furniture at BMCRC, Ballari
Sag mill full set of liners as per attached specifications and drawings. The delivery schedule is as per NIT
Supply of Stainless Steel Unique ID Plates
Unbranded 5 liter Oil of Turpentine
Unbranded Cotton Yarn Waste as per IS 5485