Loading…
Loading…
5,832 live3,833 closing this weekmost from Department of Local Government and Department of Water Resources
5,832 results • Latest
Supply, Installation, Testing and Commissioning of Isothermal Calorimeter
Supply & Installation of Fire Water pumps with Diesel Engines at Bhatinda LPG Plant
Battery Operated Reciprocating Saw (Q3)
Minus 80 Degree Freezer
Near Infrared Spectroscopy System
Mild Steel Wirefor General Engineering Purposeasper IS280 (Q2)
Special repair replacement of BER furniture of OTM JCOs and OR Md Accn at Mil Stn Kpt under GE Kapurthala
SPECIAL REPAIR REPLACEMENT OF BER FURNITURE OF HQ COY 55 I MECH BDE AT MIL STN BEAS UNDER GE KAPURTHALA
Procurement of spares for window split Package AC at GGSSTP Ropar
Procurement of consumable spares for Air Compressors installed at main plant and DFAH GGSSTP, Rupnagar.
Structural Rehabilitation Measures, Basic Facilities Improvement Works at PERCH DAM Distt. S.A.S. Nagar Punjab under DRIP Project
SUPPLY INSTALLATION TESTING AND COMMISSIONING OF ULTRAFILTRATION SYSTEM FOR MILK PROTEIN CONCENTRATION
Disposal off, Sale the scrap material on annual basis
Estimate for reconstruction of Water Course of Outlet RD 14651/14652/R of new Tarmala Link channel Part III
Estimate for reconstruction of Water Course of Outlet RD 14651/14652/R of new Tarmala Link channel Part II
MultiYear Rate Contract for empanelment of contractors and discovery of percentage premium or discount over the departmental base rate for complete route plan surveys of 66KV,132KV,220KV 400 KV transmission lines
Entry and Mid Level Laptop - Notebook (Q2), Scanner (V3) (Q2) Projector (MMP) (Q2), Projector Screen (V2) (Q3) Desktop Computer (Q2), A4 and Legal Size Multifunction Printer (MFP) (Q2) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No
Smart periodical services for OTM Accn and Md Accn at Zone C and D at Mil Stn Kapurthala under GE Kapurthala.
Manufacture, Testing, Supply and Delivery of 14175 kgs Silica Gel of size 6mm to 10mm for the Breathers of Power Transformers installed at various 66 kV Substations under CE/P and M, PSPCL, Ludhiana
Upgradation of Terminal Automation System involving Design Supply Installation Testing and Commissioning and its CAMC along with CAMC of existing TAS system and equipment at Bathinda Terminal Punjab under Punjab State Office.
To hire the 03 Nos. Vehicle (Hydraulic bucket lift with Driver Cum Operator) with working height (2 nos.) 14 mtr and (01 no.) 11 mtr for All divisions under Gurdaspur Circle.
PROV AND INSTALLING 1 NO DEEP BOREWELL PF CI FITTING NEW PUMPING MACHINARY PROV FIXING LAYING JOINTING GI PIPE LINE IN VILLAGE HARA BLOCK DHAR KALAN DISTT PATHANKOT UNDER DMF
Smart periodical services for JCO/ORs Md Accn including central amenities/institutions at Old Mil Stn Kapurthala under GE Kapurthala
DXH 500 Lyse 0 point 5 L Beckman Coulter, DEX 500 Diluent 10 L Beckman Coulter, DXH 500 Cleaner 0 point 5 L Beckman Coulter, FP DXH 500 Control 6 X 2 point 3 ml Beckman Coulter
Custom Bid for Services - ---- Similar Category Manpower Outsourcing Services - Man-days based Manpower Outsourcing Services - Man-days based Manpower Outsourcing Services - Man-days based
Melt Flow Index Test
LIGHT RECOVERY VEHICLE 7 TON & ABOVE (4X4)
Limited Oxygen Index Tester
Body Composition Analyzer (Q3)
Drinking Water Coolers (V4) ISI Marked To IS 1475 (Q2), Reverse Osmosis based Water Treatment System above 50 LPH Capacity (V2) (Q2) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No
Television (V3) (Q2), Portable Electric Indoor Air Purifier Conforming To IS 17531 (Q2) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No
Fluorescence Imaging System
SPL REPAIRS TO OLD PIPELINE FOR MAIN WATER SUPPLY AT JOGINDER SINGH ENCLAVE AND FAFA ACCN AT OLD AMRITSAR CANTT
REPAIR/MAINTENANCE OF GEYSERS/SOLAR WATER HEATER AND DAY TO DAY COMPLAINTS AND MISC/FITTINGS FIXTURE AT AMRITSAR CANTT
ADDN/ ALTERATION TO BLDG. NO. P-1 (LIFTS) OF MH JRC UNDER GE (EAST) JALANDHAR CANTT
PROVN OF 35 KVA GENERATOR SET AND REPLACEMENT OF 82.5 KVA DG SET QTY 02 AND PROVN OF TWO 100 KVA THREE PHASE ONLINE UPS WITH 45 MINUTES BACKUP TIME AND 160 KVA TRANSFORMER AND CONNECTED WORK
Estimate of UGPL for 1 No. Deep T/Well at Vill.- Phukapur (Block- Nurpur Bedi) in Distt. Rupnagar (Under 502 No. Deep Twell Scheme) (Part - B)
Permanent Restoration of damaged portion of stretch from Km 23 00 to 24 00 and Km 44 00 to 45 00 and Km 56 00 to 60 860 and construction of additional culverts in Jalandhar kapurthala Sultanpur Lodhi Makhu road sectionofNH703A intheStateofPunjab