Loading…
Loading…
15,597 results • Latest
Construction of BALLAH PILLING WORK AT Manikpur Subhas Block and Naskar Para in WARD NO.23 within Rajpur Sonarpur Municipality.
M/R at ch 28.00 of LBMC in connection with Turga Irrigation Scheme under Purulia Irrigation Division at Block and P.S- Baghmundi, Dist- Purulia .
Emergent restoration of Sundarban Embankment Damaged due to Full Moon Kotal occurred on 29/07/2026 at facing River- Metia (R/B) near Bholanath Patra fishery for a length 55.00 m, Mouza- Mohanpur, G.P.-Mohanpur, Block-Minakhan of Haroa Irrigation Su
Emergent restoration of Sundarban Embankment Bantala Sluice damaged occurred on dated 31.07.2026 during the Full Moon kotal facing River Bidyadhari (L/B) for a length 100.0 m, Mouza-Nazat G.P.- Nazat-II , Block- Sandeshkhali-I of Haroa Irrigation
M/R to CD Structure at ch. 65.00 of Main Canal to facilitate storm water in c/w Kestobazar Irrigation Scheme at Block and P.S- Baghmundi, Dist- Purulia under Purulia Irrigation Division.
Supply rate of different materials to be used in different works under VB-G RAM G Scheme for CHINGRA GP
CONSTRUCTION OF CONCRETE COVER DRAIN WITH SLAB FROM NEAR OF SHYAMAL MALAKAR TO NEARTHE HOUSE OF SAMBHU MALAKAR AT KANKURIA UNDER KAKURIA GP OF 2025-26
Construction of outlet Structure at different chainages of Dy Canal and Minor Canal in c/w Khairabera Irrigation Scheme at Block and P.S- Baghmundi, Dist- Purulia.
MR to fall structure Dy I and Dy 2 of Kulbera Main Canal with us protection work in between Ch 0.00 and Ch 1.00 under Kulbera (I) Scheme.
Emergent restoration of damaged one (01) nos. Sluice Faidakati occurred on 16.07.26 along right bank of river Kalindi at Mouza- Malekanghumti, Block-Hingalganj, under Hingalganj Irrigation Sub-Division of Basirhat Irrigation Division in the District