Loading…
Loading…
500 results • Best match
Installation of Deep Tube Well by DTH Rig Boring including necessary accessories for water supply arrangement at Rajaduar Ananda Nagar, North Guwahati under Guwahati Division No.-l under SOPD-G for the year 2025-26
PROVN OF DEEP BOREWELL AT SHANTIPUR UNDER GE GUWAHATI
Installation of Solar Powered Medium Deep Tube well Irrigation system at Biplob Das s paddy field of village Harharia under RIDF-XXVIII (NABARD) for the year 2022-23
Installation of Solar Shallow Tube Well scheme 4 Points at Karimganj South LAC under RIDF-XXX NABARD for the year 2024-25under Karimganj North-Karimganj South BadarpurDivision Package_42
Installation of Solar Shallow Tube Well scheme 4 Points at Karimganj North LAC underRIDF-XXX NABARD for the year 2024-25 under Karimganj North-Karimganj South BadarpurDivision Package_43
PROVIDING FITTING FIXING AND PLACING OF 6 INCH DIA GI WATER LINE FROM NEW DEEP TUBE WELL INSIDE 100 TPD PLANT AREA TO IR PLANT AT APL NAMRUP
Construction of 50,000 liters capacity RCC Over Head Water Tank 200mm Dia Deep Tube Well including Distribution Network for Proposed Industrial Park at Mechaki Tongani Sisiborgaon Dist Dhemaji
Installation of 6 nos. of Solar and Electrically Operated Hybrid Tube Well Scheme under Jalukbari LAC under SOPDG for the year 2022-23 in 2 Two groups
Construction of Latrine, Bathroom, Electrification with safety Tank and overhead Tank water facility (Tube well) and eater supply motor with electrification at Bedlengbmari under SOPD Social Forestry Division Kokrajhar, BTC for the year 2023-24.
SPL REPAIR AND REPLACEMENT OF BOREWELLS AT SECT A SECT C OLD EME AND ENGR REGT PUMP HOUSE AT DINJAN
Handpump Seal Kit, Cable 136, Tie Rod 133, Tie Rod 132, Control Leaver Vertical Assy, Radiator Top Hose, Hose Oil Drain, Hose Lover Radiator, Air Filter Element Outer, Pull Cable Leader Arm, Isolator, Seat Belt Assy, Spring, Bolt, Top Rod Mtg Rubber Pad, Grease Nipple For Hood, Hose Clamp 33.3x57.2, Hose Clamp 19.1x454.5, Worm Drive Clip Composite 16-2, Drain Plug M18X2.5
INSTALLATION OF SOLAR POWERED TUBE WELL SCHEMES UNDER PRADHAN MANTRI KRISHI SINCHAI YOJANA_PMKSY_ HAR KHET KO PANI_HKKP_ACCESS TO GROUND WATER _PH-I_FOR THE YEAR 2019-20_BALANCE 65 PTS.
Installation of 20 Nos. of Solar Tube Well Points from villlageDandua to Barapujia in Morigaon LAC under RIDF-XXX NABARD for the year 2024-25under Morigaon-Laharighat- JagiroadDivision Package_49
Installation of solar and electrically operated hybrid tube well scheme Under Rangia_Kamalpur LAC_10 Points each_ in Kamrup District under SOPD_G during the year 2022_23_Group III_5 Pts at Kamalpur LAC
Installation of Solar Powered Shallow Tube Well Irrigation Scheme at Sadiya LAC (4 Points) under RIDF-XXX (NABARD) for the year 2024-25 under Sadiya-Doomdooma Division Pkg-3
INSTALLATION OF SOLAR AND ELECTRICALLY OPERATED HYBRID TUBE WELL SCHEMES UNDER DHOLAI SONAI LAC 11 PTS UNDER RIDF_XXIX NABARD FOR THE YEAR 2023_24 UNDER DHOLAI SONAI DIVISION I DHOLAI
Construction of 1 No 120 Men Barrack at 54th Bn ITBP, Bhalukpong (Assam) (SH: Installation of 1 no submersible pump of capacity 3 HP in existing Deep Tube Well)
PROVN OF BOREWELL AT MOUNTAIN SHADOW UNDER GE AF BORJHAR
Installation of Deep Tube Well By DTH Rig Boring Including Necessary Accessories For Water Supply Arrangement at Rangagara Village and Bandhab Nagar, North Guwahati Under Guwahati Division No-I under SOPD-G For The Year 2024-25
Empanelment of manufacturers or their authorized dealers distributors for Parallel Rate Contract for supply of ISI marked India Mark III Deep Well Hand Pump and Assembly conforming to BIS specifications with up to date amendment at stores of Assam
Installation of Solar Powered Medium Deep Tube well Irrigation system at Binoy Kumar Baro s paddy field of village Uttarkuchi (Amguri) under RIDF-XXVIII (NABARD) for the year 2022-23
Construction of 70 KL capacity RCC Over Head Tank, Laying of Water Supply Distribution Pipe Line, Installation of Deep Tube Well and Fencing at Plastic Park, Tinsukia, Dist.- Tinsukia, Assam.
Re tender for Installation of Deep Tube Well Construction of RCC Over Head Tank and Construction of Pump House for Industrial Estate at Belkhuti Kumarikat, Dist Baksa Group No 1
Installation of MDTW 5 Pts at Rangapara LAC _ 1 Pt. at Tezpur LAC under SOPD-G Tube Well Scheme for the year 2024-25 under Tezpur Rangapar Division I Package_7
Providing Water Supply Arrangement by Installation of Deep Tube Well, construction of UGR and laying of distribution network at Dirgheswari, Nepali Basti, North Guwahati, Kamrup under Guwahati Division No.-l under SOPD-G for the year 2025-26
REPLACEMENT/RENEWAL OF BOREWELL AT CHANGSARI MIL STN UNDER GE RANGIA
SPL REPAIR / REPLACEMENT OF 02 X BOREWELL UNDER GE (S) TEZPUR
Custom Bid for Services - Permanent GI Pipe structure including chain pulley arrangement for Nine number of Bore well for repair and maint of Submersible pump under GE Jorhat Similar Category Operation And Maintenance Of Water Supply Systems
Construction of an Assam Type Building consisting of one hall room, one office room with toilet and tube well facility at Vill-Dakhin Pub Dologaon under Baksa District. TN-30-2
C/O 4 nos UG Tanks 25,000 ltr. Capacity (plus 3750 ltr. Free board)including RCC motor shed , Iron removal filter and 7 nos. deep tube wells at variouslocations - i) Central Library, Maths, Law, Earth Science, Library Science, ii) NearBengali and Lin
Installation of 3 HP Solar Tube Well schemes upto a depth of 54 meter under Dholai LAC in Cachar Districtunder RIDF-XXX _NABARD_ for the year 2024-25 under Dholai-Sonai DivisionPackage_12
Installation of solar and electrically operated hybrid tube well scheme Under Rangia Kamalpur LAC 10 Points each in Kamrup District under SOPDG during the year 2022_23 Group I_10 Pts at Rangia LAC
Installation of deep tube well including 500 lit R.O. drinking water plant at State Drug Testing Laboratory (SDTL) building under Commissioner of FDA, Assam at Govt. Ayurvedic College Campus, Jalukbari, Guwahati-14
Construction of Boundary wall with iron Gate, RCC Stagging with Deep Tube well and Filter Unit system for drinking water facilities at Krishnaguru Sebashram at Udalguri in Udalguri District. PKG No.514_2
Installation of solar and electrically operated hybrid tube well scheme Under Rangia Kamalpur LAC 10 Points each in Kamrup District under SOPDG during the year 2022_23 Group II_5 Pts at Kamalpur LAC
Installation of Tube Well
SPECIAL REPAIR/REPLACEMENT OF BOREWELL AT CHABUA AGAINST BER UNDER GE DINJAN
SPL REPAIR OF BOREWELL AT CHARDUAR PUMP HOUSE UNDER GE (N) TEZPUR
PARA 35 WORK FOR PROVN OF BOREWELLS ALONGWITH CONNECTED ITEMS FOR POTABLE WATER SUPPLY AT LEKHAPANI MIL STN UNDER GE DINJAN NO 2
Installation of Solar and Electrically operated Hybrid Tube Well Schemes under Jaleswar LAC (6 Nos. of points) under SOPD-G for the year 2022-23 at (i) Haldibari Village, Pt No.1 (ii) Gomaijhar Village Pt. No.2, (iii) Gomaijhar Village Pt. No.3, (iv)
CO 3 nos UG Tanks 25,000 ltr. Capacity (plus 3750 ltr. Free board) including RCC motor shed, Iron removal filter and one deep tube well near ladies Hostel 6 at Assam University Silchar.
Installation of 3 HP Solar Tube Well scheme 4 Points upto a depth of 54 metre under Katigoraha LAC under RIDF-XXX NABARD for the year 2024-25 under Borkhola-Katigora Division Package_8
Installation of Solar Shallow Tube Well (5 Points) Scheme under Biswanath LAC at village/ward (L.B. Road, Borbheti, L.B. Road, Charaijonia, Bamunipathar) in Biswanath District under SOPD-G for the year 2024-25
C/O Deep tube well (10 dia) near water supply treatment plant with iron removal filter, U.G. storage tank of 2 lac ltr. Capacity, pipe line and motor shed at Assam University Silchar
CO Deep tube well near Ladies Hostel and 2, near Lecturer quarter and Renovation of water supply pipe line from warden complex to Boys Hostel 1 via Boys Hostel 2 Assam University Silchar.
Empanelment and Approval of Manufacturing Companies/Brand owner Companies for supply of Electric Motor Pump and Diesel Pump sets for Shallow Tube Well / Bore Well/ Open Well/Pond/River/ Storage Tank etc. under the scheme PMKSY-Per Drop More Crop- Ot
Installation of Solar and Electrically operated Hybrid Tube Well Schemes under Goalpara West LAC (6 Nos. of points) under SOPD-G for the year 2022-23 at (i) Rangsapara Village, Pt No.1 (ii) Rangsapara Village Pt. No.2, (iii) Ravapara Pt. II Villag
Work services to carry out water quality test before filteration and after filtration of borewells pumps houses installed at 764 ASC Bn and Nepalipatti
Development of existing tube well and providing new tube well with submersible pump at FSD Changsari
Repair/maint existing borewell and panel of Gen room at BN HQ Lokra