Loading…
Loading…
1,343 results • Best match
Construction of 17 (seventeen) Nos. Small bore (150 mm x 100 mm) Deep tube well by manual means and equipment by the contractor including installation of pump set electrical panel board under Durga Chowmuhani RD Block. (Gr.-XIX).
Construction of 09(nine) nos Small Bore Deep Tube Well including extension of pipeline, FHTC with post and platform as per AAP 2020-21, 2021-22 and 2022-23 under JJM under DWS Sub Division Padmabil (Gr-I).
Construction of 09(nine) nos Small Bore Deep Tube Well including extension of pipeline, FHTC with post and platform as per AAP 2020-21, 2021-22 and 2022-23 under JJM under DWS Sub Division Mungiakami (Gr-III).
Construction of 17 (seventeen) Nos. Small bore (150 mm x 100 mm) Deep tube well by manual means and equipment by the contractor including installation of pump set electrical panel board under Durga Chowmuhani RD Block. (Gr.-XII).
Construction of 09(nine) nos Small Bore Deep Tube Well including extension of pipeline, FHTC with post and platform as per AAP 2020-21, 2021-22 and 2022-23 under JJM under DWS Sub Division Mungiakami (Gr-XXIII).
Construction of 09(nine) nos Small Bore Deep Tube Well including extension of pipeline, FHTC with post and platform as per AAP 2020-21, 2021-22 and 2022-23 under JJM under DWS Sub Division Mungiakami (Gr-VII).
Construction of 17 (seventeen) Nos. Small bore (150 mm x 100 mm) Deep tube well by manual means and equipment by the contractor including installation of pump set electrical panel board under Durga Chowmuhani RD Block. (Gr.-XXII).
Construction of 09(nine) nos Small Bore Deep Tube Well including extension of pipeline, FHTC with post and platform as per AAP 2020-21, 2021-22 and 2022-23 under JJM under DWS Sub Division Mungiakami (Gr-II).
Construction of 09(Nine) nos. Small Bore Deep Tube Well including extension of pipeline, FHTC with post and platform as per AAP 2023-24 and 2024-25 under JJM at different locations under DWS Division Kalyanpur(Gr-II).
Sinking of 06 Nos. SBDTW by Contractor Mini Rig and providing of distribution pipe line, electrical accessories, construction of masonry chamber,etc. commissioning of the tube well complete in different location under DWS Sub-Division KLS Gr-VII
Water Supply scheme under JJM / SH Sinking of 18 nos. Small bore (150mm x 100mm) tube well at different locations of Durgachoumuhani R.D Block during the year 2020-21/S.H- construction of 5(Five) Nos SBDTW (Gr-II).
Construction of 09(nine) nos Small Bore Deep Tube Well including extension of pipeline, FHTC with post and platform as per AAP 2020-21, 2021-22 and 2022-23 under JJM under DWS Sub Division Mungiakami (Gr-XII).
Construction of 17 (seventeen) Nos. Small bore (150 mm x 100 mm) Deep tube well by manual means and equipment by the contractor including installation of pump set electrical panel board under Durga Chowmuhani RD Block. (Gr.-XV).
Construction of Deep Tube Well under Mohanpur RD Block during the year 2023 24 SH Drilling and Development of DTW with Contractors direct rotary drilling rig and other machineries and equipment, Construction of pump house, installation of submersib
Construction of 09(nine) nos Small Bore Deep Tube Well including extension of pipeline, FHTC with post and platform as per AAP 2020-21, 2021-22 and 2022-23 under JJM under DWS Sub Division Mungiakami (Gr-XXVI).
Construction of 09(nine) nos Small Bore Deep Tube Well including extension of pipeline, FHTC with post and platform as per AAP 2020-21, 2021-22 and 2022-23 under JJM under DWS Sub Division Mungiakami (Gr-XV).
Construction of 17 (seventeen) Nos. Small bore (150 mm x 100 mm) Deep tube well by manual means and equipment by the contractor including installation of pump set electrical panel board under Durga Chowmuhani RD Block. (Gr.-XIV).
Construction of village knowledge centre at Bagbassa S.S. Store under Panisagar R.D. Block North Tripura /Installation of Mini Deep Tube Well of 125 x 100 mm size with Submersible pump set having capacity 2000GPH at 30.00 mtr. Head
Construction of 2 (Two) nos Small Bore Deep Tube Well with storage tank, Installation of Submersible Pump Motor set including other allied works at Gangaprasad Para and Ganiram Para under Baikhora GP under Bokafa Block during 2019-20.
Sinking of Small Bore Tube Well (155mm x 100 mm dia.) near the house of Kamal Debbarma in the land of Sunil Debbarma, S_o. Lt. Sushil Debbarma, Dayaram Para, Jampuijala Block, Sepahijala District, during the year 2023-24
Drilling and Development of 06 six nos Deep tube well at different places of Water Resource Sub Division Mohanpur by using contrators own reverse circulatory rig machin with all accessories under RIDF XXVI during the year 2021 22
Construction of 09(nine) nos Small Bore Deep Tube Well including extension of pipeline, FHTC with post and platform as per AAP 2020-21, 2021-22 and 2022-23 under JJM under DWS Sub Division Khowai (Gr-II).
Construction of 09(nine) nos Small Bore Deep Tube Well including extension of pipeline, FHTC with post and platform as per AAP 2020-21, 2021-22 and 2022-23 under JJM under DWS Sub Division Mungiakami (Gr-IV).
Construction of 17 (seventeen) Nos. Small bore (150 mm x 100 mm) Deep tube well by manual means and equipment by the contractor including installation of pump set electrical panel board under Durga Chowmuhani RD Block. (Gr.-XVII).
Deposit work during the year 2025-26/ SH- Installation of 1( One ) no Mark-II tube well along with lifting facility at Hurua TSR Camp of 13th Bn TSR(IR-IX) under Kalacherra RD Block, Dharmanagar North Tripura
Drinking water supply scheme under Boxanagar RD Block/ Construction of 3(Three) Nos. Small Bore Deep Tube Well (SBDTW) (150mmX100mm) along with installation of pump set, laying o0f distribution system etc. at Ashabari, Boxanagar and Manikyanagar GP u
Cleaning and washing of borewell at BOP Pathachera of 122 BN BSF under SHQ BSF Udaipur
Provn of Borewell incl allied services for supplying water to KLP at Teliamura of 28 AR
Establishment of 05 nos Farmers Knowledge Centre at different locations under South Dist SH Inst of 5 nos small bore deep tube well (100 mm X 100 mm) dia NB with UPVC casing pipes and ribbed screen pipes assembly I c inst of 1 HP submersible pump
Construction of 17 (seventeen) Nos. Small bore (150 mm x 100 mm) Deep tube well by manual means and equipment by the contractor including installation of pump set electrical panel board to be installed under Manu RD Block gr_XI
Construction of 1 (One) No. Small Bore Deep Tube Well Scheme (150 mm X 100 mm) including installation of Pump Motor sets and laying of distribution system etc. at Indiranagar GP area under Rajnagar R.D. Block (FFC Tied Grant).
Construction of village knowledge centre including drinking water filter of 3280 litre capacity at Noagoan under Durgachowmuni R.D. Block Dhalai Tripura /Installation of Mini Deep Tube Well of 125 x 100 mm size with Submersible pump set having capac
Construction of 12 (Twelve) nos Small Bore Deep Tube Well, Laying of various dia Pipe Lines, Installation of Submersible Pump Motor set including other allied works at Different Locations of Hrishyamukh Block under DWS Sub-Division, Belonia (Gr-I)
Mtc of South Baruakandi DTW Scheme of Algapur GP under Dharmanagar WR Sub Division North Tripura during the year 2020 21 SH Drilling and development of Deep Tube Well with Departmental Reverse Circulation Drilling Rig and other accessories and
Construction of 2 nos Small Bore Deep Tube Well, Laying of Pipe Lines, Installation of Submersible Pump Motor set and other works under Paschim Sabroom G.P. within the jurisdiction of DWS Sub-Division Sabroom during 2019-20 (Deposit Work).
Construction of 2 (Two) nos Small Bore Deep Tube Well with storage tank, Laying of various dia Pipe Lines, Installation of Submersible Pump Motor set at Basanta Choudhury Para and Amra Mog Para under Satchand Block during 2019-20.
JJM Scheme_Construction of 03 (three) Nos. Small bore deep tube well at i) Natun tila ii) Sitlabari tila iii) Salgara Madhyapara within Tepania R.D. Block under DWS Sub-Division-II, Gomati Tripura during the year 2020-21(Gr-II).
Construction of 07 nos Small Bore Deep Tube Well, Laying of various dia Pipe Lines, Installation of Submersible Pump Motor set including other allied works at Different Locations of Mohininagar VC under DWS Sub-Division, Belonia during 2021-22.
Construction of Deep Tube Well at Malapati para near the land of Ranjit Debbarma under Lefunga Block during the year 22_23 SH Construction of pump house installation of pump motor laying of distribution lines and other works under RIDF_XXVI
Construction of 17 (seventeen) Nos. Small bore (150 mm x 100 mm) Deep tube well by manual means and equipment by the contractor including installation of pump set electrical panel board to be installed under Manu RD Block gr_XIII
Construction of 01(One) No. Deep Tube Well at Dhalai Judicial District Court Complex with contractors high capacity direct rotary drilling rig machine and other machineries equipments in/c providing of ERW pipes, pea gravels and construction of s
Construction of 17 (seventeen) Nos. Small bore (150 mm x 100 mm) Deep tube well by manual means and equipment by the contractor including installation of pump set electrical panel board to be installed under Manu RD Block gr_X
Construction of 03 nos Small Bore Deep Tube Well , Laying of Pipe Lines , Installation of submersible Pump Motor set at different location under Purba Harina G.P. within the jurisdiction of DWS Sub-Division Sabroom during 2019-20 (Deposit Work).
Construction of 06 nos SBTW 155mm x 100mm dia x 90 mtr depth in Dhalai District Tripura during the year 2023 24 SH Construction of 06 six nos Small bore deep tube well at under Ambassa R.D Block area.
Sinking of 01 (One) No. Deep Tube Well at Ashapurna Roaja Para under Ashapurna Roaja Para GP under DWS Sub-Division, Salema/S.H-Construction of Semi-permanent pump house, electrification, and supplying, laying and distribution of pipeline. (2nd Cal)
Water supply Arrangement at Regional Survey Training Institute, A.D.Nagar, Agartala, Tripura / Sinking of 1(one) no. Small Bore Deep Tube Well along with pump set along with installation commissioning of 10000 litre capacity package type IRP in/c. a
Sinking of Deep Tube Well at Kalapania of Bamutia Block under Water Resource Sub Division Mohanpur during the year 2020 21 SH Construction of pump house installation of pump motor laying of distribution lines and other works under BADP
Drilling and Development of 04 four nos Deep Tube well at different places of West Tripura District under Water Resource Sub Division Jirania by using contractors own reverse circulatory rig machine with all accessories under NABARD RIDF XXVII during
Maintenance of different small bore deep tube well (SBDTW) by way of lowering lifting of pump and motor, leakage and spare parts of DTW Schemes with other allied works etc under DWS Sub-Division Salema.(Group-I)(2nd Call).
MI Schemes under the jurisdiction of Water Resource Division No II during the year 2019 20 SH Drilling and development Sinking Re sinking of 04 Four nos Deep tube well by the departmental reverse circulatory drilling Rig and equipment