Loading…
Loading…
1,343 results • Best match
Construction of 09(Nine) nos. Small Bore Deep Tube Well including extension of pipeline, FHTC with post and platform as per AAP 2023-24 under JJM at different locations under Tulashikhar DWS Sub Division (Gr-II).
Construction of 09(Nine) nos. Small Bore Deep Tube Well including extension of pipeline, FHTC with post and platform as per AAP 2023-24 under JJM at different locations under Padmabil DWS Sub Division (Gr-II).
Drilling and Development of 01 Deep Tube Well for Bru settlement with Contractors own high capacity direct rotary and other machineries and equipments at Kalajari Range under Amarpur, Gomati District Tripura during the year 2020-21 (Deposit work)
Please refer to DNIeT
Construction of 17 (seventeen) Nos. Small bore (150 mm x 100 mm) Deep tube well by manual means and equipment by the contractor including installation of pump set electrical panel board under Salema RD Block. (Gr.-XIII).
Maintenance of different small bore deep tube well (SBDTW) by way of lowering lifting of pump and motor, leakage and spare parts of DTW Schemes with other allied works etc under DWS Sub-Division Salema.(Group-II).
Construction of 2 nos Small Bore Deep Tube Well , Laying of various dia Pipe Lines , Installation of Submersible Pump Motor set under Brajendra G.P. within the jurisdiction of DWS Sub-Division Sabroom during 2019-20 (Deposit Work).
Construction of 01 (one) no SBDTW at Patiroy Para of Karnamani Para VC by manual means providing and laying of pipeline etc commissioning of the tube well of Ganganagar RD Block under DWS Division Ambassa(GR-IV)
Water supply scheme in Sepahijala District under JJM/ SH Re-Development of old serviceable Deep Tube Well with Contractors air compressor (1100CFM and 300PSI) in different places of Sepahijala District under DWS Division, Bishalgarh during the year
Construction of 17 (seventeen) Nos. Small bore (150 mm x 100 mm) Deep tube well by manual means and equipment by the contractor including installation of pump set electrical panel board under Salema RD Block. (Gr.-XII).
Construction of 17 (seventeen) Nos. Small bore (150 mm x 100 mm) Deep tube well by manual means and equipment by the contractor including installation of pump set electrical panel board under Salema RD Block. (Gr.-XV).
Re-development of old serviceable 35 (Thirty Five) nos. Deep Tube Well with departmental air compressor (450 cfm and 150 PSI output) at different places within the jurisdiction of Rig Sub-Division, Belonia under DWS Division, Belonia
Water Supply scheme under JJM /SH Sinking of 18 Nos. Small bore tube well at different locations of Durga Chowmohani R.D Block during the year 2020-21 (2nd phase)/SH Construction of 5 nos SBDTW (Gr-II)
Dev. of Regulated Market at Pabiacherra Regulated market under Kumarghat Agri Sub-Division SH Installation of Mini Deep Tube Well of 125 x 100 mm size with Submersible pump set having capacity 2000GPH at 30.00 mtr. Head
Construction of 17 (seventeen) Nos. Small bore (150 mm x 100 mm) Deep tube well by manual means and equipment by the contractor including installation of pump set electrical panel board under Salema RD Block. (Gr.-XI).
Construction of 01(One)(150 x 100 mm) Small Bore Deep Tube Well (SBDTW) including laying of pipeline and installation of pump and providing domestic connection with other allied work under various Places of Mohanpur Municipal Council
Construction of 17 (seventeen) Nos. Small bore (150 mm x 100 mm) Deep tube well by manual means and equipment by the contractor including installation of pump set electrical panel board under Salema RD Block. (Gr.-XIV).
Water Supply scheme under JJM /SH Sinking of 18 Nos. Small bore tube well at different locations of Durga Chowmohani R.D Block during the year 2020-21 (2nd phase)/SH Construction of 5 nos SBDTW (Gr-III)
Construction of 2 nos Small Bore Deep Tube Well with storage tank, Laying of various dia Pipe Lines, Installation of Submersible Pump Motor set at Kanu Para and Sonairai Khil Para under Poangbari Block during 2019-20.
Construction of 05(five) Nos new Septic tank including pipe line for Type-II staff quarters and sinking of Mini Deep Tube Well at the Khowai Sub-Jail under Khowai Sub Division as per PWD SoR-2023
Construction of 2 nos Small Bore Deep Tube Well storage tank, Laying of various dia Pipe Lines, Installation of Submersible Pump Motor set at Suipru Ch Para and Brinda kishore Para under Rupaichari Block during 2019-20.
Water Supply scheme under JJM /SH Sinking of 18 Nos. Small bore tube well at different locations of Durga Chowmohani R.D Block during the year 2020-21 (2nd phase)/SH Construction of 5 nos SBDTW (Gr-I)
Construction of 1 Nos Small Bore Deep Tube Well by Contractors own Mini Rig, equipments including installation of Submersible pump motor, 8000 LPH IRP at Nalua BOP, 31 BN BSF within the jurisdiction of DWS Division Belonia
Construction of modified Iron Removal Plant along with sinking and commissioning of standby Deep Tube Well including rising pipeline to the water storage tanks of State Guest House under DWS Sub-Division-III, Kunjaban, Agartala. (Deposit Work).
Sinking of Tube Well 155 mm X 100 mm X 90 mtr depth in West Tripura District under PMKS YHKKP Ground Water Irrigation during the year 2019 20 Phase II For 33 nos SBTW AMC 2nd call
Renovation and Painting of main Temple including Nut Mandir, Painting of Boundary wall, Covering of existing side drain, repairing of tube well, one no. barricade for animal sacrifice, Sign board of Sri Sri Durga Bari Temple Agartala
Construction of of 1 No. Small Bore Deep Tube Well along with installation of pump set, laying of distribution line etc. at Jorabin Para under Paikhola GP under B.C Nagar R.D Block during the year 2019-20.
Construction of 17 (seventeen) Nos. Small bore (150 mm x 100 mm) Deep tube well by manual means and equipment by the contractor including installation of pump set electrical panel board under Salema RD Block. (Gr.-XVI).
Repair to compound wall and floors and providing borewell and IRP at FSD Churaibari Tripura
AUGUMENTATION OF WATER SUPPLY BY PROVN OF BOREWELL INCL ALLIED SERVICES AT MILITARY STATION AGARTALA
Construction of 09(nine) nos Small Bore Deep Tube Well including extension of pipeline, FHTC with post and platform as per AAP 2020-21, 2021-22 and 2022-23 under JJM under DWS Sub Division Mungiakami (Gr-XVI).
Construction of 10 (Ten) nos Small Bore Deep Tube Well including extension of pipeline, FHTC with hydrant post and platform with other allied works under DWS Sub-Division Kalyanpur during the year 2023-24(Gr-II) (2nd call).
Construction of 09(nine) nos Small Bore Deep Tube Well including extension of pipeline, FHTC with post and platform as per AAP 2020-21, 2021-22 and 2022-23 under JJM under DWS Sub Division Mungiakami (Gr-VIII).
Construction of 09(nine) nos Small Bore Deep Tube Well including extension of pipeline, FHTC with post and platform as per AAP 2020-21, 2021-22 and 2022-23 under JJM under DWS Sub Division Padmabil (Gr-XII).
Construction of 09(nine) nos Small Bore Deep Tube Well including extension of pipeline, FHTC with post and platform as per AAP 2020-21, 2021-22 and 2022-23 under JJM under DWS Sub Division Mungiakami (Gr-IX).
Construction of 09(nine) nos Small Bore Deep Tube Well including extension of pipeline, FHTC with post and platform as per AAP 2020-21, 2021-22 and 2022-23 under JJM under DWS Sub Division Padmabil (Gr-VIII).
Construction of 15 (Fifteen) nos Small Bore Deep Tube Well, Laying of various dia Pipe Lines, Installation of Submersible Pump Motor set including other allied works at Different Locations of B.C. Nagar Block under DWS Sub-Division, Barpathari.
Sinking of 06 Nos. SBDTW by Contractor Mini Rig and providing of distribution pipe line, electrical accessories, construction of masonry chamber,etc. commissioning of the tube well complete in different location under DWS Sub-Division KLS Gr-IV
Construction of 10 (Ten) nos Small Bore Deep Tube Well including extension of pipeline, FHTC with hydrant post and platform with other allied works under DWS Sub-Division Kalyanpur during the year 2023-24(Gr-I)(2nd call).
Construction of 09(nine) nos Small Bore Deep Tube Well including extension of pipeline, FHTC with post and platform as per AAP 2020-21, 2021-22 and 2022-23 under JJM under DWS Sub Division Mungiakami (Gr-XXIV).
Water supply scheme in Sepahijala District under JJM/ SH Re-Development of old serviceable Deep Tube Well with Contractors air compressor (300-450 CFM ) in different places of Sepahijala District under DWS Division, Bishalgarh during the year 2
Construction of 09(nine) nos Small Bore Deep Tube Well including extension of pipeline, FHTC with post and platform as per AAP 2020-21, 2021-22 and 2022-23 under JJM under DWS Sub Division Mungiakami (Gr-X).
Construction of 07(Seven) nos. Small Bore Deep Tube Well including extension of pipeline, FHTC with post and platform as per AAP 2023-24 and 2024-25 under JJM at different locations under DWS Division Kalyanpur(Gr-I).
Water supply scheme in Tripura/Re-Development of old serviceable Deep Tube Well with departmental air - compressor (300-450 CFM, 150 - PSI) in different places under Rig Sub - Division No -I,Badharghat year 2022-23 and 2023-24
Construction of 09(nine) nos Small Bore Deep Tube Well including extension of pipeline, FHTC with post and platform as per AAP 2020-21, 2021-22 and 2022-23 under JJM under DWS Sub Division Mungiakami (Gr-XVIII).
Construction of 09(nine) nos Small Bore Deep Tube Well including extension of pipeline, FHTC with post and platform as per AAP 2020-21, 2021-22 and 2022-23 under JJM under DWS Sub Division Mungiakami (Gr-XXII).
Sinking of 01 No. Small Bore Tube Well by manual means and equipments provided by the contactor, including installation of pump set, electrical panel board complete at Belonia ST Boys Hostel during the year 2021-22 (Deposit Work).
Construction of 09(nine) nos Small Bore Deep Tube Well including extension of pipeline, FHTC with post and platform as per AAP 2020-21, 2021-22 and 2022-23 under JJM under DWS Sub Division Mungiakami (Gr-XXI).
Construction of Deep Tube Well at Doigola of Dumarakari VC under Hezamara Block during the year 202223 SH Construction of pump house, installation of pump motor laying of distribution lines and other works under RIDF_XXVII Job No_TR_11_DTW_ NABA
Construction of 09(nine) nos Small Bore Deep Tube Well including extension of pipeline, FHTC with post and platform as per AAP 2020-21, 2021-22 and 2022-23 under JJM under DWS Sub Division Padmabil (Gr-X).