Loading…
Loading…
1,343 results • Best match
Construction of 2 nos Small Bore Deep Tube Well storage tank, Laying of various dia Pipe Lines, Installation of Submersible Pump Motor set at Ramprasad Para and Gagra Para under Rupaichari Block during 2019-20.
Drilling and Development of 50 Nos. Deep Tube Well with Contractors direct rotary drilling rig and other machineries including all materials in different locations of Jolaibari, Rupaichari, Satchand and Poangbari Block under DWS Division, Belonia
Sinking of 3Nos. SBDTW)by manual means and providing necessary electrical accessories, contruction of hydrant post etc. and commissioning of the tube well complete in different location under Kumarghat Block during the year 2019-20
Drilling and Development of 03 nos. SBDTW by Mechanical means in/c installation of pump set, electrical panel commissioning of the tube well in/c domestic connection of DWS SUB-DIVISION, Dharmanagar and Panisagar / Gr.VII
Drilling and Development of 06 Nos Deep Tube Well at different places of Dhalai District with Departmental Direct Rotary Normal capacity Rig Machine and other machineries and equipments for the year 2019 20 2nd call
Drilling and Development of 03 nos. SBDTW by Mechanical means in/c installation of pump set, electrical panel board commissioning of the tube well in/c domestic connection of DWS SUB-DIVISION, Dharmanagar and Panisagar
Drilling and Development of 03 nos. SBDTW by Mechanical means in/c installation of pump set, electrical panel commissioning of the tube well in/c domestic connection of DWS SUB-DIVISION, Dharmanagar and Panisagar / Gr.VIII
Drilling and Development of 03 nos. SBDTW by Mechanical means in/c installation of pump set, electrical panel commissioning of the tube well in/c domestic connection of DWS SUB-DIVISION, Dharmanagar and Panisagar / Gr.VI
Construction of Village Knowledge Center at South Durgapur SS Store under Khowai Agri Sub-division, Khowai District (RIDF-XXVII). /S.H- Construction of Main building including Sanitation, Installation of mini Deep Tube Well, Construction of Drinking
Drilling Development of 03 nos SBDTW by Mechanical means in c installation of pump set, electrical panel board commissioning of the tube well in c domestic connection of DWS SUB DIVISION Dharmanagar and Panisagar Gr.III
Sinking of 10 Nos. SBDTW by manual means providing of distribution pipe line , electrical accessories, construction of masonry chamber,etc.commissioning of the tube well complete at different location under DWS Sub-Division Kailashahar Gr-II
Sinking of 10 Nos. SBDTW by manual means providing of distribution pipe line , electrical accessories, construction of masonry chamber,etc.commissioning of the tube well complete at different location under DWS Sub-Division Kailashahar Gr-III
Sinking of Tube Well (155 mm x100 mm x 90 mtr depth) in Sepahijala District, Tripura under PMKSY(HKKP) - Ground Water Irrigation during the year 2019-20 (Phase-II) (For 30 Nos. SBTW) / (Jampuijala Block).
Ground Water Recharge Activities under JJM in North Tripura District 2023-24/Const. of 37 nos Dug, Injection Well at various location/existing bore well spots of Laljuri RD Block (37Nos) and Jampui Hill RD Block (2Nos) of DWS Sub-Division, Kanchanpur
Ground Water Recharge Activities under JJM in North Tripura District 2023-24/Const.of 81 nos Dug, Injection Well at various location/existing bore well spots of Kalacherra RD Block 52 Nos and Kadamtala RD Block 29 Nos of DWS Sub-Division, Dharmanagar
Installation of Mini deep tube well
Sinking of Tube Well 155 mm X 100 mm X 90 mtr depth in West Tripura District under PMKSY HKKP Ground Water Irrigation during the year 2019 20 Phase II For 27 nos SBTW Mohanpur Block
Construction of 2 (Two) nos Small Bore Deep Tube Well storage tank, Installation of Submersible Pump Motor set including other allied works at Balahari Majumder Para and Manik Kumar Para under Poangbari Block during 2019-20.
Drilling,Development of 01 no Deep Tube Well with Contractors own Direct Rotary drilling rig, ERW pipes, Pea-gravels, Pump House, Electrical accessories remodeling pipeline other allied works at Bhagarsing carner under DWS Sub-Division Santirbazar
Construction of 2 nos Small Bore Deep Tube Well with storage tank, Laying of various dia Pipe Lines, Installation of Submersible Pump Motor set at Chemfru Para and Munda Para under Satchand Block during 2019-20.
Construction of 09(Nine) nos. Small Bore Deep Tube Well including extension of pipeline, FHTC with post and platform as per AAP 2023-24 under JJM at different locations under Mungiakami DWS Sub Division (Gr-I)
Drilling Development of 20 (Twenty) Nos. Deep Tube Well with Contractor high capacity direct rotary drilling rig and other machineries equipments including providing of ERW pipes, Pea-gravels etc. in different locations of Khowai District, Trip
Construction of Water Supply Bosting Station Tank Scheme at Chaya Kr Roaja Para based on Deep Tube Well from DTW Scheme Tejendra KP under Paschim Chawmanu VC to Chaya Kr Roaja Para under Uttar Longtharai VC
Water Supply scheme under JJM/SH Sinking of 18 nos. Small bore tube well at different locations of Salema R.D Block during the year 2020-21 (2nd phase)/SH Construction of 5 nos SBDTW (Gr-I)
Sinking of Tube Well 155 mm X 100 mm X 90 mtr depth in West Tripura District under PMKSY HKKP Ground Water Irrigation during the year 2019 20 Phase II For 19 nos SBTW Lefunga Block
Sinking of 01 (One) No. Deep Tube Well at Uria Basti under Noangoan GP under DWS Sub-Division, Kamalpur/S.H-Construction of Semi-permanent pump house, electrification, and supplying, laying and distribution of pipeline. (2nd Call)
Drilling and Development of 10 nos. Deep Tube Well at different places of South Tripura District with Contractors Direct Rotary Drilling Rig and other Machineries and Equipments under DWS Division Belonia during the year 2019-20.
Sinking of Tube Well 155 mm X 100 mm X 90 mtr depth in West Tripura District under PMKSY HKKP Ground Water Irrigation during the year 2019 20 Phase II For 10 nos SBTW Belbari Block
Water supply scheme under Niti Aayog during the year 2020-21/SH Construction of 9(Nine) Nos. M-II tube well and allied works at various schools under DWS Sub-Division, Salema Dhalai Tripura (Deposit work).
Sinking of Tube Well 155 mm X 100 mm X 90 mtr depth in Khowai Tripura District under PMKSY HKKP Ground Water Irrigation during the year 2019 20 Phase II For 10 nos SBTW Kalyanpur Block
Construction of 2 nos Small Bore Deep Tube Well with storage tank, Laying of various dia Pipe Lines, Installation of Submersible Pump Motor set at Gola Chand Para and Rajnagar under Satchand Block during 2019-20.
Drilling Development of 15 (Fifteen) Nos. Deep Tube Well with Contractor high capacity direct rotary drilling rig and other machineries equipments including providing of ERW pipes, Pea-gravels etc. in different locations of Khowai District, Tr
Drilling and Development of 10 Nos. Deep Tube Well at different places of South Tripura District with Contractors high Capacity Direct Rotary Drilling Rig and other Machineries and Equipments under DWS Division Belonia during 2019-20.
Infrastructure Development of Krishi Vigyan Kendra at Salema SH i) Construction of Barbed wire fencing ii) Construction of Seed and planting material Product Structure iii) Preparation of fencing pillar iv) Installation of Mini Deep Tube Well
Construction of 09(Nine) nos. Small Bore Deep Tube Well including extension of pipeline, FHTC with post and platform as per AAP 2023-24 under JJM at different locations under Mungiakami DWS Sub Division (Gr-V)
Sinking of Tube Well 155 mm X 100 mm X 90 mtr.depth in West Tripura District under PMKSY HKKP -Ground Water Irrigation during the year 2019 20 Phase-II For 19 nos.SBTW Lefunga Block. 2nd call
Sinking of Tube Well 155 mm X 100 mm X 90 mtr depth in West Tripura District under PMKSY HKKP Ground Water Irrigation during the year 2019 20 Phase II For 21 nos SBTW Hezamara Block
Construction of 10 (Ten) nos Small Bore Deep Tube Well including extension of pipeline, FHTC with hydrant post and platform with other allied works under DWS Sub-Division Khowai during the year 2023-24(Gr-I)
Drilling and Development of 50 Nos. Deep Tube Well with Contractors direct rotary drilling rig and other machineries including all materials in different locations of Hrishyamukh, Bagafa, Rajnagar and B.C. Nagar Block under DWS Division, Belonia
Construction of 2 (Two) nos Small Bore Deep Tube Well storage tank, Installation of Submersible Pump Motor set including other allied works at Puspa Ram Para and Kabya Chowdhuri Para under Satchand Block during 2019-20.
JJM Schemes in the year 2021-22 / Drilling, Development of 07 SBDTW providing, installation of pump sets with all accessories, commissioning of tube well /domestic connection under Atal Jaldhara Mission of DWS SUB-DIVISION, Dasda Gr.II
Construction of 09(Nine) nos. Small Bore Deep Tube Well including extension of pipeline, FHTC with post and platform as per AAP 2023-24 under JJM at different locations under Mungiakami DWS Sub Division (Gr-III)
Construction of 2 nos Small Bore Deep Tube Well with storage tank, Laying of various dia Pipe Lines, Installation of Submersible Pump Motor set including other allied works under Satchand Block during the year 2020-21.
Water Supply scheme under JJM/SH Sinking of 18 nos. Small bore tube well at different locations of Salema R.D Block during the year 2020-21 (2nd phase)/SH Construction of 5 nos SBDTW (Gr-III)
Construction of 10 (Ten) nos Small Bore Deep Tube Well including extension of pipeline, FHTC with hydrant post and platform with other allied works under DWS Sub-Division Khowai during the year 2023-24(Gr-II)
Water Supply scheme under JJM/SH Sinking of 18 nos. Small bore tube well at different locations of Salema R.D Block during the year 2020-21 (2nd phase)/SH Construction of 5 nos SBDTW (Gr-II)
Construction of 09(Nine) nos. Small Bore Deep Tube Well including extension of pipeline, FHTC with post and platform as per AAP 2023-24 under JJM at different locations under Mungiakami DWS Sub Division (Gr-II)
Construction of 09(Nine) nos. Small Bore Deep Tube Well including extension of pipeline, FHTC with post and platform as per AAP 2023-24 under JJM at different locations under Padmabil DWS Sub Division (Gr-I).
Construction of 09(Nine) nos. Small Bore Deep Tube Well including extension of pipeline, FHTC with post and platform as per AAP 2023-24 under JJM at different locations under Tulashikhar DWS Sub Division (Gr-IV).
Construction of 09(Nine) nos. Small Bore Deep Tube Well including extension of pipeline, FHTC with post and platform as per AAP 2023-24 under JJM at different locations under Tulashikhar DWS Sub Division (Gr-I).