Loading…
Loading…
8,632 results • Best match
(A) Construction of (10+10) Ladies & Gents Toilet in DRM Office area Jhansi (B) Provision of lavatory with urinal (renovation work) including surrounding area at ELS/JHS. (C) Renovation of scrap yard using low height RCC walls and boundary walls with Concertina wire fencing on top at ELS/JHS.
REPAIR TO PATH, FENCING, BOUNDARY WALL, GATE, CLEANING AND MAINT OF SEPTIC TANK, SOAKAGE WELL, SEWAGE LINES, MANHOLES AND MISC ITEMS IN ARC SARSAWA UNDER GE (AF) SARSAWA
Cleaning of Jungle Topographical land survey and soil investigation and plate load test of proposed Kendriya Vidyalay School building staff quarter and boundary wall etc at Nanpara Bahraich UP Subwork/Packages: Main Work
Construction of A Type (Two Section) School Building 09 Nos staff Quarters Boundary wall ramp and other facilities including IEI and Fans etc. at Kendriya Vidyalaya Nanpara Bahraich (UP) Subwork/Packages: Main Work
Ward no.- 09 Mansarovar mein B-13 ke saamne evam Pinky Yadav ke makaan ke sameep evam Gangoni Park ki footpath boundary wall ki marammat evam rangai-putai ka karya.
PEELIKOTHI STHIT APAR NAGAR AYUKT JI KO AAWANTIT AWAS ME GATE VA WINDOW LAGANE VA STORE, TOILET VA BOUNDARY WALL KI RANGAI-PUTAI, MARAMMAT EVAM SANITARY, LIGHTING ITYADI KA KARYE.
SPL REPAIR TO BOUNDARY WALL SURROUNDING NEW KLP OF SINGLE OFFR ACCN AND ADDN AND ALTN TO FLOORING AND ALLIED WKS OF OFFICER ACCN AT AMC CC UNDER GE (EAST) LUCKNOW
M/O PARK/GREEN BELT (REPAIR OF BOUNDARY WALL STONE MASONARY WORK,WASHED STONE GRIT PLASTER AND COIL FANCING WORK ON GREEN BELT ALONG ROAD BETWEEN SECTO-71 AND 70) NOIDA
M/o Sewerage (Raising of Sewer Manhole Cover Frame Due to Construction of C.C. Road in Arawali Apartment Sector-52 and Re-Construction of Boundary Wall of UGR Gijhor Campus) Noida
Construction of C.c road and drain at Moh. Surender Nagar Abhinav House To Veera Colage Boundary wall and H/o E.E Er. Harsavroop Singh To Rajveer Singh House Bijnor LOT-09
In Ward-70, Suncity Colony, in front of the electricity house, the boundary wall of the park was constructed, painted, and installed, along with an open gym, swings, dustbins, and horticulture.
Construction of OHT, TW, Staff quarter, boundary wall, site development, Risingmain including material, labour complete in all respect including commissioning testing, trail and run, defect liabilities and handing over to UPEIDA
Construction of Bank building ,Boundary wall,01 No. septic and soak pit and Supply and Supply and installation of 02 No. India mark-II hand pump at special potato mandi Thathia
Construction of boundary wall at 11 KV switching station Noorbari and repair work of yard, control room and sub-division office at 33/11 KV power substation Uptron in Uptron, Lucknow.
Cleaning and removal of silt earth from nallah siltation area of mine towards OB Time Office along railway line up to double barrel culvert and NTPC boundary wall at Khadia Project
M/O Parks (R/O Boundary wall, Railing, main gate, z- gate and footpath of park in Front of C-112, C-51, C-23 and I- 35 sector-9 ) NOIDA
M/o Green Belt (C/o and R/o Boundary wall, Main Gate and Grit wash work of green belt between mandir and Petrol Pump Village- Hajratpur Wajidpur, Sector-63) Noida
M/o Park (Annual M/o Boundary wall footpath, gate, grill, toilet and painting work at Children Park, shivalik Park and green belt in front of Shivalik park sector-33A)Noida.
16 - Scraping, O.B.D, Apex and Painting work on Main gate, Internal both side park, Footpath and V.C. lodge and its Boundary wall at the time of 35th Convocation at University Campus.
Remaining construction work of the kitchen of the community centre (wedding hall) of the municipality located on Tehsil Road and repair/renovation work of the boundary wall of the wedding hall.
Construction work of Walking track in the park in front of B-101 in Ward No 69 Lohia Nagar soil filling in the park and painting on the boundary wall etc.
REPAIRS TO OPEN DRAINAGE WITH COVERS AND REPAIR TO BOUNDARY WALL , FENCING, RCC JALLI AND OTHER B/R RELATED WORKS ETC UNDER AGE B/R -II (W) OF GE (W) AGRA
REPAIR TO BOUNDARY WALL NEAR TEMPLE AT CQA(I) ESTATE, LADPUR DEHRADUN AND PROVISION OF RAIN WATER HARVESTING IN COMMUNITY HALL AT ORDNANCE FACTORY DEHRADUN UNDER GE (I) (P) (FY) KANPUR.
REPAIR/MAINT OF DRAIN FENCING FOOTPAH AND BOUNDARY WALL CLEANING OF SEWAGE LINE SEPTIC TANK AND SOAKAGE WELL IN ZONE F AREA OF AGE B/R II UNDER GE WEST LUCKNOW
Year of 2021-22 Repair work of Boundary wall, Chauki dar Room, doors and windows, tiles, sanatory, water supply and white wash and other sefty work at Inspection house Mujahidpur Kailadevi.
REPAIR TO SWT, HARDSTANDING, DRAIN, CULVERT, TRAVERSE WALL ETC AND REPAIR/ MAINTENANCE TO BOUNDARY WALL, SECURITY WALL, FENCING, BARBED WIRE, CONCERTINA COIL ETC AT AF STATION BAREILLY UNDER GE (AF) BAREILLY
Cleaning and removal of silt, earth from nallah, siltation area of mine towards OB Time Office along railway line up to double barrel culvert and NTPC boundary wall at Khadia Project
Work 61 Repair painting and construction of the footpath along the park boundary wall in front of House Number 191 A Block Sector 11 Ward Number 55 under the Vijayanagar Zone.
Repairing of pump house painting door window and const of boundary wall and other misc.work in word Hussainganj Sadar bajar Arya nagar Dada miya Loharbagh Awas vikas Munshiganj and civil lines
Constructions of 02 No. A.P.F of 6x20 M, Deep Drain, Boundary wall , 01 No. Gate and Gate Piller, around A.P.F Inter locking Work at Hatpat Chakwali under Mandi Simiti, Rampur Maniharan
Reconstruction of damaged boundary wall between Tehsil Tiraha to Mittal Gate, Bijli Ghar to Toilet Mokshya Dwar and Ambedkar Dwar to Kakori Gate at Government Industrial and Agricultural Exhibition Ground, Aligarh
Repair and painting work in the residence No. 8/3 of the Chief Development Officer in Chha Bangaliya Colony, Kanpur Nagar district and repair and painting work in the boundary wall
Dismantling fixing of Profile Sheet in old store of Electric Transformer Repair Workshop Bahraich district Bahraich and dismantlingreconstruction of boundary wall and interlocking soling work at Electric Transformer Repair Workshop Balrampu
Cleaning and removal of silt/earth from nallah/siltation area of mine towards OB time office along railway line up to double barrel culvert and NTPC boundary wall at Khadia Project
REPAIR/MAINT AND UPKEEPING OF E/M INSTALLATIONS AND REPAIR TO BOUNDARY WALL, GATES, FENCING, PATH AND CERTAIN MISC WORKS OF STATION AMENITIES UNDER AGE B/R-II AT GE JHANSI
Nagar Panchayat Kshetratargat Bhandariya Tola Pahi me sthit Pani ki tanki (Over Head Tank) Parisar Sthit me Jarjar Pump House and Opretor Awas Marramat Nirman Jarjar Boundary wall ka Nirman an
Cleaning and removal of silt, earth from nallah, siltation area of mine towards OB Time Office along railway line up to double barrel culvert and NTPC boundary wall at Khadia Project
Construction of Damage Boundary Wall and other Misc Civil Works at various 33 11 KV SubStation under EDD Milak and EDD II Rampur Distt Rampur under the Business Plan 2024 25
S R TO PROVIDING BOUNDARY WALL FENCING STUPA MOUND STANDING ON A GREAT IRREGULAR MOUND NEARLY A MILE DUE WEST OF NORTH WEST CORNER OF THE RAMNAGAR BAREILLY UP PHASE 2
Vikas khand Naujheel zila Panchayat Mathura ke prabandhadheen kanjihouse kasba Surir me stith Gou-Ashrya Sthal ke andar Kharanja ,Nand, Truss, Gate, Boundary Wall nirman/ Marammat and saaj sajja avses Karya
Cleaning and removal of silt earth from nallah siltation area of mine towards OB Time Office along railway line up to double barrel culvert and NTPC boundary wall at Khadia Project.
CONSTRUCTION OF COMMON TOILET , WATER SUPPLY, BOUNDARY WALL AND M and R OF EXISTING SGR, JE ROOM and OTHER MISCELLANEOUS CIVIL WORK AT 33/11 KV IDEAL SUBSTATION - JAHANABAD, DISTRICT-FATEHPUR
Construction work of 02 nos. Type V residences of judicial officers, construction work of boundary wall, connection road, drain for water drainage etc. in the outer court of Garautha Distt Jhansi
AR AND MO TO NATIONAL CPWD ACADEMY KAMLA NEHRU NAGAR GHAZIABAD DG 2024 25 SH REPLACEMENT OF OLD CONCERTINA COIL OVER BOUNDARY WALL OF NATIONAL CPWD ACADEMY GHAZIABAD DG 2024 25
Under District Lucknow, Boundary wall, railing, platform and other internal development works of the park located in front of building number E-4006 and E-4004 in Rajajipuram, Lot No 1
17 Mall Avenue colony stith awas no. BG-3 ke parisar ki shatigrast boundary wall ka nirmaan karya shatigrast shade ko puneh banane ka karya va anya awashyak civil sambandhi karya.
M/o Building ( Repair of floor, shed, toilet Boundary wall and class room and painting, distempering ,water proofing of slab etc in Noida Lok Munch Library building in Sector-15) Noida
Repair work of boundary wall, grill, gate, interlocking path with colored strip, RCC bench and painting in the park of Shankar Gupta in Ward No. 31 Suhag Nagar Sector No. 01.
Work of revitalization of boundary wall and inspection building to keep the land of inspection buildings free from encroachment under National Water Management Project, Sharda Canal Section, Shahjahapur (Lot No.-02
Under Loha Mandi Zone Swachh Survekshan-2024, RCC platform and painting work near the boundary wall and gate behind the CD waste collection point in plot number-315 located at Dehtora.