Loading…
Loading…
290 results • Best match
Granular Subbase, metalling, BM, BC, Side shouldering, road side drain portion from 0.00 Km to 8.00 km under Scheme for Special Assistance to States for Capital Investment for 2023-24.
Earthwork GSB WBM II WBM III BM BC road side Pucca drain Protection Work etc. Length 4.00 Km under Scheme for Special Assistance to States for Capital Investment for 2024 25
Patch repairing by grouting, patch metaling and patch carpeting, sand seal coating, etc.
Patch, metalling, carpeting sand seal coat etc. on Ramnagar to Jalabazar road.
Patch, metalling, carpeting sand seal coat etc. on DT road to Lalcherra and Dhupirbond School road.
Patch repairing by patch metaling, grouting, patch carpeting, sand seal coating, etc. (L-2.20 km).
Pot hole repair and patch carpeting, seal coating, etc.
Patch metalling, grouting, carpeting and sand seal coat etc
Refer DNIT93
Patch metalling, carpeting sand seal coat etc. complete on West Panisagar Sailenbari and BSF camp road
Metaling, grouting, PMC, Road Marking etc.
WBM Grouting Carpeting etc.
Patch repairing by grouting, patch metaling and patch carpeting, sand seal coating, etc.
SH- Grouting, bituminous concrete, paver block, surface drain, road marking and road reflector etc. and road refl
Patch WBM, Grouting, carpeting, sand seal coat etc.
Patch metalling, grouting carpeting and seal coating on i) In front of Jalabassa Panchayet office ii) Jalabassa HS School road and iii) Manipuri basti road
Construction of 1 (one) R.C.C Box Cell, Toe wall, R.C.C Retaining wall, Brick masonry Retaining wall, Pucca Drain , Soling, WBM3, Carpetting, Seal coat etc during the year 2021-22
Patch repairing by grouting, patch metaling and patch carpeting, sand seal coating, etc. (Gr-III).
Patch repairing by metaling, grouting, PMC and sand seal coat, etc. during the year 2025-26
Patch, metalling, Grouting, carpeting etc. on Bagbassa to Zaithang School road, Thangnang to NH-08 via Noagang Community Hall and Tingaria road
Patch, metalling, Grouting, carpeting etc. on Rajnagar PHC and Tilthai-Anandabazar road to Jubarajnagar School.
Patch metaling grouting carpeting and sand seal coat etc. during the year 2025-26
Patch repairing by metaling grouting carpeting sand seal coat etc. during the year 2025-26
FDR_Maintenance of road during the year 2024_25 _ Maintenanace of Road starts from Chandrapur NH(Rajarshi Motors) to Reshambagan BT road via Tata Kalibari road under AMC ward no 10 _SH_ Patch soling, Patch WBM ,PMC , Sand seal coating
Patch repairing by metaling grouting carpeting and sand seal coat etc during the year 2025-26
Patch repairing by metaling, grouting, carpeting, sand seal coat etc. during the year 2025-26
Patch repairing by patch metaling, grouting, and patch carpeting, sand seal coating etc
Metalling, grouting, PMC, etc. during the year 2025-26
Patch repairing by patch metaling, grouting, patch carpeting, full length sand seal coating, etc. (L-2.20 km).
Mtc of road by WBM-I,WBM-II, PMC and Seal coating etc
Patch repairing by metaling grouting patch carpeting and sand seal coat etc during the year 2025-26.
Patch WBM, Carpeting, Grouting and side berm lowering etc.
Patch repairing by patch metaling, grouting, and patch carpeting, sand seal coating, etc. (L 2.50 km)
Patch repairing by patch metaling, grouting, and patch carpeting, sand seal coating, etc. (L 2.50 km)
Metalling, grouting, PMC, road marking etc. during the year 2025-26
Patch repairing by metaling, grouting, carpeting, sand seal coat etc
Patch repairing by patch metaling, grouting, and patch carpeting, sand seal coating, etc
Patch metaling, grouting, patch carpeting and seal coating etc.
Patch metaling, grouting, patch carpeting and seal coating etc.
Patch repairing by patch metaling, grouting, patch carpeting, sand seal coating, etc. (L-1.50 km).
SH-Widening of existing road, road side pucca drain, RCC box culvert etc/ Phase-II (Re-carpeting from Ch. 1.95 km to Ch. 3.15 km, road side pucca drain).
Patch WBM, Carpeting, Grouting, and side berm lowering etc.
Periodical repair of PWD BT road from (i) Approach road of SDM office (L-0.09 km) (ii) Dhanchakma road to Tarachand Rupini para (L-1.70 km) (iii) T.K road (near Trishabari) to Khamarbari road (L-1.60 km) portion from 0.00 km to 1.20 km/SH- Patch meta
SH Pot holes repairs, re-carpeting, sand seal coat, katcha drain etc.
Metaling, grouting, PMC and sand seal coating, etc
Construction
WBM Gr-3, Grouting, re-carpeting, Seal coat and Seal coat on old bituminous road surface etc.