Loading…
Loading…
7,071 results • Best match
LIFTING OF IRREGULAR AND SAGGED SERVICE CABLE OF BUSTEE DWELLER BY SUITABLE ARRANGEMENT AT PARGHATAPARA AND SURROUNDINGS IN WARD NO. - 57.
Work for Laying of 01 No 33 KV 3C 400 Sqmm XLPE cable by micro tunneling and manual laying of length 2.095KM from Sugandha more to Harit 33 11 kv Sub-Stn under Tarakeswar (D) Division of Hooghly Region.
Laying of Heavy Duty HDPE Pipe by Micro tunnelling and Manual laying of 33KV3 400 Sq.mm XLPE cable having total length of 0.950Km for effecting enhanced contractual load Bulk connection of M/s East Hooghly Agro Plantation pvt ltd
Laying of 11 kV 3C 300sq mm XLPE cable of RL 0.440KM including Microtunnelling 0.390KM for effecting new HT Bulk service connection i.r.o. Dy. Chief Engineer (E) SD Department the KMC113 for Booster Pumping at Vivekananda Road , Sitala Park
Supplying and Laying of Stand by LT Cable with Feeder Pillar Box for Supplying power in case of fault in main line for Blood Bank of BMC and H, Purba Bardhaman (Electrical Work).
Restoration of cable fault at rotating bridge assembly of clariflocculator no.2 on emergency basis by providing laying, termination of new copper cable along with allied works at 30 MGD WTP, under JNNURM-II division, KMDA.
XLPE Cable for Working Voltages up to and Including 1.1 KV as per IS 7098 (Part 1) (Q2) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller OEM Authorization Certificate *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) -- Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 7 Bid Number : GEM/2025/B/6605932 Dated : 25-08-2025 Bid Document 1/6 Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 4 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No Splitting
XLPE Cable for Working Voltages up to and Including 1.1 KV as per IS 7098 (Part 1) (Q2) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller OEM Authorization Certificate *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) -- Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 7 Bid Number : GEM/2025/B/6484854 Dated : 23-07-2025 Bid Document 1/6 Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 4 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No Splitting
XLPE Cable for Working Voltages up to and Including 1.1 KV as per IS 7098 (Part 1) (Q2) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller OEM Authorization Certificate *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 7 Bid Number : GEM/2025/B/6880903 Dated : 12-11-2025 Bid Document 1/7 Number of Auto Extension count 1 Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 5 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No
XLPE Cable for Working Voltages up to and Including 1.1 KV as per IS 7098 (Part 1) (Q2) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No Document required from seller OEM Authorization Certificate *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 3 Bid Number : GEM/2026/B/7124560 Dated : 19-01-2026 Bid Document 1/6 Number of Auto Extension count 1 Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 4 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No
XLPE Cable for Working Voltages up to and Including 1.1 KV as per IS 7098 (Part 1) (Q2) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller OEM Authorization Certificate *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) -- Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 7 Bid Number : GEM/2025/B/6485139 Dated : 23-07-2025 Bid Document 1/6 Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 4 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No Splitting
XLPE Cable for Working Voltages up to and Including 1.1 KV as per IS 7098 (Part 1) (Q2) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller OEM Authorization Certificate *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) -- Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 7 Bid Number : GEM/2025/B/6505365 Dated : 28-07-2025 Bid Document 1/6 Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 3 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No Splitting
XLPE Cable for Working Voltages up to and Including 1.1 KV as per IS 7098 (Part 1) (Q2) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller OEM Authorization Certificate *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 7 Bid Number : GEM/2025/B/6881125 Dated : 12-11-2025 Bid Document 1/7 Number of Auto Extension count 1 Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 4 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No
XLPE Cable for Working Voltages up to and Including 1.1 KV as per IS 7098 (Part 1) (Q2) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller OEM Authorization Certificate *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 5 Bid Number : GEM/2025/B/6792868 Dated : 15-10-2025 Bid Document 1/6 Number of Auto Extension count 1 Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 3 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No
Manufacturing ,Testing, Supply and Delivery of ACSR Wolf and Panther Conductor.
SITC of lightning conductor in Uluberia Sub Divisional Court,Uluberia, Howrah.
SITC of Lightning Conductor at 48 Tangra RHE for 3 blocks.
Lightning Conductor Installation at Howrah Zilla School, Howrah. Project ID ES232409222S000.
Manufacture, testing, supply and delivery of ACSR Rabbit and Dog Conductor.
Manufacture, testing, supply and delivery of ACSR Squirrel, Weasel, Rabbit Conductor.
Composite Hardware Fittings for ACSR Weasel/Rabbit Conductor (30/50 Sq.mm.)
Manufacture, testing, supply and delivery of ACSR Wolf (150 sq.mm.) Conductor
SITC of Lightning Conductor at Ghoshpara RHE, total block 4 nos.
Manufacture, testing, supply and delivery of ACSR Squirrel, Weasel, Rabbit Conductor
Manufacture, testing, supply and delivery of ACSR Wolf (150 sq.mm.) Conductor.
Manufacturing ,Testing, Supply and Delivery of ACSR Wolf and Panther Conductor.
Empanelment of Vendors for ACSR Squirrel, Weasel,Rabbit and Dog Conductor
Ceramic ( Vitreous China ) Flushing Cisterns for Water Closets and Urinals conforming to IS 774 (Q3), PVC Insulated Unsheathed Cable with Flexible Conductor ISI Marked To IS 694 (Q2), Health Faucet (Q3), Connector Pipes for Washbasins/Sinks/Geyser (Q3), Plastic Seats and Covers for Water - Closets as per IS 2548 (Q3), Cushon with Cover for Chair Dining, PVC Seat for chair Dining, PVC Seat for chair verandah Seat and Back, Foam cushion size 22x21x4 inch thick 40 density, Cover made with tapestroy cloth with chain
Modification of 4 nos pump starter panel for incorporating motor protection relays alongwith replacement of power cable of starter panel 1 at Jinjira Bazar MPS under GRBU/SD.
Supply delivery and laying of power cable for internection from T.W to Panel of Diga water supply scheme block Onda under Bankura Mechanical Division PHE Dte. Dist Bankura
Supply, delivery and laying of power cable from feeder box to Loop box and fitting and fixing of luminaries to cater power of UGR at SWTP, under KMDA.
Supply and laying of power cable for V.T motor with other allied works at Pansuli Head Works Site under improvement of RCFAPart-III(Zone-I) Water Supply Scheme.
Repairing of the damaged power cable including servicing and overhauling of 35 Cusec SWF submersible pump unit no. 2 along with allied works at Joka DPS under GRBU.
Urgent restoration of 95sq mm HT power cable for 177 KW HT motor unit no.H with other allied works at DWF station of PBPS(Drg.)/S and D.
Supply and Delivery of Submersible flat cable and power cable for Rampurhat Medical College and Hospital Water Supply Scheme (Block- Rampurhat - I) under Bolpur Mechanical Division, PHE Dte
Providing LT power cable for power supply arrangement of Hangers Airtel GBDA DM Bungalow Police Control Room etc at Ganga Sagar in connection with Ganga Sagar Mela 2025
Replacement rerouting of power cable in between different Sub-Station toward important buildings through proposed masonary cable trench within the campus of IPGMER -SSKM Hospital, Kolkata----Phase II
Improvement of depressed road surface both sides and restoration of power cable distribution system from Sector-V Metro Station to AL-BL crossing at Sector-V, under NDITA.
Switchyard development, Construction of control and power cable trench, Equipment foundation and Switchyard fencing with M.S gate at Kalua Brindabon 33/11 KV sub Station Dist-Paschim Medinipur
Repairing with replacement of burnt out submersible motor power cable,mechanical seal and bearing with other allied works for pump unit no.6 at Jorabridge drianage pumping station.
Shifting of NVR, Supply and installation of LED Monitor, supply and laying of fibre optical and power cables, electrical wiring of room and associated works for relocation of CCTV monitoring system to newly constructed room at Garden Reach Flyover.
Construction of Balance portion of Control Room Building and Boundary wall ,Tube well,Approach Road,Cable tenches for both Power cables and control Cables,Switch yard development and allied works at Belgachia 33/11KV Sub-Station under Howrah Div.
Rewinding of stator including replacement of control cable ,broken bearings and mechanical seals of submersible motor of pump unit no.1 (475 LPS / 160 KW/ 415 Volt) at Nonadanga drainage pumping station
REPAIR / REPLACEMENT OF OLD U/S CI / GI / PPR / CPVC / UPVC PIPE LINE SLUICE VALVE GATE VALVE, VALVE CHAMBER CLEANING SERVICE TANK AND MISC ALLIED WORKS AND REPAIR / MAINT OF DG SETs DG SET PANEL E/M EQPT LIGHTENING CONDUCTOR AND ALLIED WORKS AT LAN
Construction of 01 nos G1 Surveillance cum OP Points at BOP Panitar 02 nos G2 surveillance cum OP point at BOP Gojadanga and Khalsi in AoR of 102 BN BSF under SHQ BSF Kolkata SH PROVIDING OF EI FANS Lightning Conductor 1000 WP SOLAR SYSTEM
REPAIR / REPLACEMENT OF OLD U/S CI / GI / PPR / CPVC / UPVC PIPE LINE SLUICE VALVE GATE VALVE, VALVE CHAMBER CLEANING SERVICE TANK AND MISC ALLIED WORKS AND REPAIR / MAINT OF DG SETs DG SET PANEL E/M EQPT LIGHTENING CONDUCTOR AND ALLIED WORKS AT LAN
REPAIR MAINT OF LT PANELS, SWITCHGEARS, LT CABLES OF DIFFERENT MD ACCNS AND REPAIR MAINT OF APFC PANELS LIGHTING CONDUCTOR, EARTHING, TRAFFIC SIGNAL LIGHTS INCL MISC WORKS AT SUB STN NO 7 TO 10, JSA ENCLAVE, JCO MAP PH-I ECIB UNDER GE FW KOLKATA
Supply & testing of 4 Core, 10 sq mm, LT power Copper cables, Solid Copper conductor, XLPE Insulated stranded, Cores Laid Up, PVC tape Innersheathed, Armoured (Glavanised wire) extruded PVC Type ST2 Sheathed, 650/1100 V Grade as per instruction of Engineer incharge at site.
Galvanizations of fabricated MS Channel, Angle and Flat of different size for the works of Augmentation of conductor size from 100sqmm ACSR to 150sqmm ACSR i.r.o 33KV overhead line between old Calcutta 33/11KV S/S to KMDA 33/11KV S/S Under IPDS
construction of cable trench and allied civil works for HT AVR and VCB room and supply and installation of dewatering pump set and supply and laying of XLPE Cable for Suri I,II and SAINTHIA flouride affected Water Supply Scheme, Birbhum.