Loading…
Loading…
1,166 results • Best match
Desilting of drains from Shiv Vihar Tiraha to Mukhiya market both side, Drain from Aggarwal sweet to Public toilet at Amar Vihar culvert (Both side), Phirni road (from Karawal Nagar road to Mukhiya market chwok and drain from Karawal Nagar road from
Cleaning/improvement of drain by surface dressing, dismantling/removal of damaged slabs/brick walls from Drain from Raj Ghat to culvert on Sachivalaya Road Gate no. 9 IG Stadium in Darya Ganj and Barapulla Nallah near Barapulla Bridge in Ward No. 1
Improvement / Development of adjusting culvert at near D-2 Shani Bazar road, Shop No.-2 Shani Bazar Road, White Mandir Veer Bazar Road, Devi Mandir Rithala, Rithala Phirni Road, C-13 Dharam Vatika and near D-15 Bangali Clinic, Azad Colony, Budh Vihar
Improvement to drainage system by covering the existing drain with SFRC slab RCC Work (for culvert) and fixing of CC Kerb Stone from Mother dairy (Near ESI Residential Quarters) to ESI Hospital Gate (On Approach Road of Basai Darapur) in Village Basa
Improvement of various roads under PWD Division NWR-2 during 2020-21. (SH- Modification of old broken storm water brick drain with RCC drain at Road no.3 from Begumpur culvert to Rohini Sector-22 Red Light under Sub Division NWR-25.
A/R and M/O Roads under North Roads Division, PWD, Delhi during 2025-26. (SH- Repairing of footpath, toe wall, culvert, chamber, drain wall, providing jersey barriers and covering of open drain on Mall Road Extension under Sub Division NR-12)
Desilting of Action plan drains Both side From Shiv Vihar Tiraha to Mukhiya Market ,One Side from Mukhiya Market chowk(Phirni Road) to Karawal Nagar Road ,Both side drain from Aggarwal sweets to Amar Vihar Culvert Near Public Toilet,and Sadat pur
CLEANING OF EXISTING SEWAGE LINE, SEPTIC TANK AND REPAIR TO DRAIN, CULVERT, FENCING, JAFFERY WALL, PATH, HARD STANDING ETC IN PINTO PARK, CAMP AREA / MAUDE LINE, AFSR AND OTHER MD ACCN UNDER AGE BR-II AT AF STN PALAM, DELHI CANTT-10
Replacement of old damaged RCC culverts over drains at various locations in JJ Cluster Shahbad daulatpur Block A, E and F. (PID 15060)
Improvement and development of culverts by providing Brick work, Cement plaster etc. on Ambedkar road kailash Vihar in Ward 41, M-II/RZ
Imp/dev. of culverts and drain by providing and fixing M.S gully grating (openable) at different places Devli in ward no -161/SZ
.
Reconstruction of culvert at various places in Ward No. 20/CLZ
Reconstruction of sunken culvert at Rohtak road Transport center,Punjabi Bagh.
REPAIR TO EXTERNAL DRAIN, CULVERT, FENCING, BOUNDARY WALL, HARD STANDING IN COMMON AREA AND MISC WORK AT DK-I, RR COLONY, TRG AREA, MES QTR AND ADJOINING AREA IN THE AREA OF AGE B/R-I UNDER GE (CENTRAL) DELHI CANTT-10
De-silting of fruit market drain both side from From Main seelampur road to chauhan bangar culvert SH1- 1st, 60 percent of Desilting of drain in 1nd Phase from 16.01.2025 to 15.06.2025 SH2- 40 percent of Desilting of drain in 2nd Phase from 16.06.202
De-silting of gokulpur drain from Jafrabad culvert to Road No-66 at Zero pusta point SH1- 1st, 60 percent of Desilting of drain in 1nd Phase from 16.01.2025 to 15.06.2025 SH2- 40 percent of Desilting of drain in 2nd Phase from 16.06.2025 to 15.01.202
Improvement Development of boundary wall from B-1 to B-65 B-block Vivek vihar Phase II by pdg. concertina coil, footpath of E-block Krishna Market Jhilmil colony by pdg. paver block two nos. culvert in Jwala Nagar by pdg RCC etc in Ward
Desilting/removal of drain Silt from wazirabad road to chand bagh culvert both sides in Ward No. 246,Sri ramcolony, shah (N) Zone. SH1- 60 percent of Desilting of drain in 1st Phase from 16.01.2026 to 15.06.26 SH2- 40 percent of Desilting of drain
Desilting/removal of silt from drain from Chand bagh culvert to sherpur chowk LHS and Drain from C block dayalpur drain to Tukhmirpur road outlet point in Ward No. 247,Sadatpur, shah (N) Zone.SH1- 60 percent of Desilting of drain in 1st Phase from 16
Desilting/removal of drain Silt from Fruit Market Nalla from Main road seelampur to chauhan bangar culvert both side SH1- 60 percent of Desilting of drain in 1st Phase from 16.01.2026 to 15.06.26 SH2- 40 percent of Desilting of drain in 2nd Phase fro
Desilting/Removal of silt from drain from Chand Bagh culvert to Sherpur Chowk LHS in ward no. 247, Sadatpur, Shah.(N) Zone. SH1- 1st, 60 percent of Desilting of drain in 1nd Phase from 16.01.2025 to 15.06.2025 SH2- 40 percent of Desilting of drain in
AR and MO various roads under PWD south west road -I during 2026-27. Repair of existing old drain Parallel to Railway over bridge Industrial area side, Culvert and Drain and improvement of footpath for Post office to ROB on Girdhari Lal Goswami Marg
AR and MO various roads under division south west road-I during 2025-26. SH Replacement of damaged/broken RCC drain and culvert slabs, P/L 200mm thick drain covers junction on Girdhari Lal Goswami Marg from post office to ROB Naraina under Sub Divis
A/R and M/o to various road Division South West Road-II PWD, New Delhi during 2021-22. (SH Repair of damage portion of drains/ culvert and other misc. work on various roads of under Sub Division-21, SWR-II, PWD, New Delhi.)
Desilting of covered drains from PWD Road to FCTS Behind Pacfic Mall, K-88 Shyam Nagar to J-85 Vishnu garden, harijan Basti Culvert to WZ-93 Harijan Basti, WZ-45 Chowkhandi Extn. to Lal Building School, A-1 Chowkhandi JJ Colony to Gurudwara Choukhand
A/R and M/O to Various Roads Sub-Division East Road-III under PWD Division East Roads/ (M-212), Delhi during 2022-23. SH- Designing and preparing the Structural Drawing for C/o Retaining wall at culvert on Traffic Signal of Ambedkar Road andGhazipur
CS for AE for Supervision of for const. of Underpasses VUP LVUP SVUP MNB CULVERT and Service Slip Road for long term mitigation measures on Potential BS location in Lakhnadon Khawasa sec Gwalior Nagpur corridor of NH44 under Road Safety in MP on EPC
Imp. Dev. of road drainage system by patch work and construction of culverts in msic. Location in Raj Nagar-2, Ward No. 134/NGZ.
Construction of Culverts in Goyla Dairy by pdg. B/w, 12mm Cement plaster, C/S RCC etc. in Ward No. 124/NGZ Nangli Sakrawati.
REPAIR/ REPLACEMENT OF CHEQUERED TILES AND REPAIR OF COMMON AREAS, FENCING, CULVERT AND MISC B/R WORK AT 61 CAV, URI ENCLAVE, 1 WEC, KARAN VIHAR AND ADJOINING AREA IN THE AREA OF AGE B/R-I UNDER GE (CENTRAL) DELHLI CANTT-10
Upgradation of side berms of Gautam Nagar Drain near Gautam Nagar culvert.
Improvement / Development of drainage system by repair of damaged culverts at various locations in Dera Village and Mandi Village in Ward No. 158 Bhatti /SZ
Construction of culverts in various locations at Trilokpuri in Ward No. 192/AC-55 under the jurisdiction of division EE-M-III-Shahdara (South) Zone.
Const.of drain from hosiyar singh hs to dayachand hs and culverts near yadav chowpal and near rohtash hs in ghummanhera village ward no.125/ngz
Improvement Development of drainage system by repair of damaged culverts at various locations i.e. Asola Village, Fatehpur beri Village in Ward No.158 Bhatti/SZ
REPAIR OF CULVERTS BY PDG. RCC AT VARIOUS LOCATION AND IMP/DEV OF DRAIN NEAR SHIV MANDIR KAKROLA VILLAGE IN WARD NO. 123 KAKROLA/NGZ.
Construction /Improvement of Culverts Near ADC Lab (D-137) and Near Janta Tent House Patparganj Village in Ward No. 197/SSZ in Patparganj AC-57
A/R and M/O of various roads under Division WR- 2 during 2023-24. (SH- Remodelling of brick drain and culvert from Sayyed Nangloi Marg to GH- 13, DDA Park (One Side) and beautification of footpath of Kashiram Shah Marg upto DDA Market under jurisdic
Desilting/Removal of silt from drain from Wazirabad road to Chand Bagh culvert both side in ward no. 246 Shah.(N) Zone. SH1- 1st, 60 percent of Desilting of drain in 1nd Phase from 16.01.2025 to 15.06.2025 SH2- 40 percent of Desilting of drain in 2nd
Desilting/removal of drain Silt from chand bagh culvert LHS to Sherpur chowk LHS in Ward No. 247,Sadatpur, shah (N) Zone. SH1- 60 percent of Desilting of drain in 1st Phase from 16.01.2026 to 15.06.26 SH2- 40 percent of Desilting of drain in 2nd Ph
Desilting of Gokulpur drain from Jafrabad culvert to Road No-66 at Zero pusta point 1- 60 percent of Desilting of drain in 1st Phase from 16.01.2026 to 15.06.26 2- 40 percent of Desilting of drain in 2nd Phase from 16.06.2026 to 15.01.27 in Ward No.
Construction of culvert/drain near YST1 to YSH15 and YSH15 to Y121 in Naraina Indl. Area Ph-II and Repair and covering of drain from MCD Store Pandav Nagar to Kirti Nagar Railway Line along A-Block DDA flats Pandav Nagar in Ward No. 139/KBZ
A/R and M/O to various roads under west road-2 New Delhi during 2023-24. (SH Repair and widening of RCC drain from Karala T-point to Sultanpur cut including Sultanpur culvert widening to prevent flooding on Karala Chowk under Sub Division WR-22)
Desilting/removal of silt from drain from Wazirabad road to Chand Bagh culvert both side in Ward No. 246 shah (N) Zone.SH1- 60 percent of Desilting of drain in 1st Phase from 16.01.2024 to 15.06.24 SH2- 40 percent of Desilting of drain in 2nd Phase f
Desilting of covered drains From FCTS to PWD Road Behind Pacific Mall, K-88 Shyam Nagar to J-85 Vishnu Garden, Harijan basti Culvert to WZ-93 in Harijan Colony, WZ-45 Chowkhandi Extn. to Lal Building School, A-1 chowkhandi in JJ colony to Gurudwa
CLEANING OF EXISTING SEWAGE LINE, SEPTIC TANK AND REPAIR TO DRAIN, CULVERT, FENCING, JAFFERY WALL, PATH, HARD STANDING ETC IN CAMP AREA, MAUDE LINE, AFSR AND OTHER MD/OTM ACCN OF AGE B/R-II AREA AT AF STN PALAM UNDER GE (AF) PALAM DELHI CANTT-10
Desilting/removal of silt from drains falls in ward No 240/52-E under the jurisdiction of EE(M-I) Shah.N.Zone-1. Desilting of nallah in Bhagirathi Vihar from Brijpuri culvert to Drain No.1 in W.No.261 Shah.North Zone. 2. Desilting of nallah in Ambedk
CLEANING OF EXISTING SEWAGE LINES, SEPTIC TANK AND REPAIR TO DRAIN, CULVERT, FENCING, JAFFERI WALL, PATH, HARD STANDING ETC IN CAMP AREA, MAUDE LINE, PINTO PARK, AFSR, CWE COMPLEX AND OTHER MD/ OTM ACCN IN THE AOR OF AGE B/R-II UNDER GE (AF) PALAM
Desilting of Fruit market Nalla from Main Road Seelampur to Chauhan Bangar Culvert both side Ward No.225 Seelampur Shah(N) Zone. SH-1 60 percent of Desilting of drain in 1st Phase from 15.01.2024 to 15.06.24 SH-2 40 percent of Desilting of drain in 2