Loading…
Loading…
2,954 results • Best match
Construction of Foot Bridge 6m Steel Truss Bridge and RCC Culvert at Samalang Nalah in GP Dunkhrigarh under APO SHAMSHI for the year 2025-26
Construction of Missing CD on MDR-67 Victory Tunnel to Dhalli by Pass. (SH Construction of R.C.C. Culvert at RD 1/600). (Near Green Hotel
Construction of Link road to village Chanjuin Km. 0/0 to 1/750 (SH Construction of 3.00 mtrs. span RCC culvert at Rd 0/080)
R/R Damages of Link road from Akash Hospital to Alpine School Nalagarh (SH-C/o Retaining wall at along RCC slb culvert at Nikkuwal))
R/D on Balla Badsar Jugher Kharti road Km 0/00 to 7/00 (SH- C/o 1.00 mtr span culvert at RD 0/050)
Restoration of rain damaged road near Kali Mata Temple Vikas Nagar SH C O Breast Wall 15m x 5 and culvert 6m Ward No 29
R/O rain damages on Missing Pipe Culvert various road under Ramshehar Sub Division (SH P/L P/L 900/600mm dia NP-2 HPC
C/O Drains for road side ,Providing R.C.C cover over catch pits,and P/L of P.C.C on road over the culverts near bifrucation of Power house road and P/L wire crates down stream of culvert.
C/o Link road from Kharial Basti to Chanoria Basti via Nai Basti,Chatak Basti ward No.2 GP Nalsuha (SH ROFD in Km 0/325 to 0/800, c/o Embankment in km 0/225 to 0/325 Retaining wall at Rd. 0/225 to 0/305nd solid causeway at Rd. 0/200 to 0/225) under
C/o link road from Lag to Harizan Basti, Rajput Basti, Ward No. 3 GP Baliana (SH Removal of Formation Deficiency, in Km 0/0 to 0/500, c/o Retaining wall at Rd. 0/250 to 0/285 solid causeway at Rd. 0/080. and 0/185 and CC pavement at Rd. 0/0 to 0/
SH C.O M.T work, wire crate hume pipe culverts etc
SH C.O M.T work, wire crate hume pipe culverts etc
SH C.O M.T work, wire crate hume pipe culverts etc
C/O R/wall, B/wall and hume pipe culverts
SH C.O 3.00mtr. span RCC slab culverts at Km. 29.240
C/O 3.00 mtr span RCC slab type Culvert with wing wall at RD 0/950, R/wall at RD 0/970 to 0/990 P/L CC Pavement at RD 0/900 to 0/950 0/955 to 1/050). (under MMGSY)
Construction of Rajgarh Yashwant Nagar via Badgalla road km. 0/0 to15/00(SH C/O 900mm dia RCC Hume pipe culverts along with both side wing wall at RD 11/210, 11/380, 11/750, 11/985, 12/415 and 12/690)
Job 6 Construction of Link road from Pritam ki Nehali to Moh. Loharan Chak Khad Village Khad ,Tehsil Haroli Distt. Una Sub Head P.L Earth filling in RD. 0-0 to 0-200 and C.O 900mm dia Hume pipe culverts Under MMGSY
Construction of link road from main road to ITI Bharmour Km 0/00 to 0/950 (SH Construction of 900mm dia HP culvert at various Rds
Channelization of Nallah near H/O Anuj towards H/O Jaswinder near Culvert at Kohlu Mohalla in Ward No. 6 RD 0/00 to 0/040
C/O Dhamechi to Bhad road Km.0/00 to 2/00(SH C/O Culvert formation defencies, Retaining Walls and Breast Walls at various RDs
C/o of link road/culvert from Jhhadhian Kalyanpur road to Parkash chand and Rattan Chand and others house, Mast Ram Nangal Nichla GP Gol Jamala.
C/o Link road from Dharonk Kainchi to Sehroli via Bandli Road in K.M. 0/00 to 7/00, C/o, Culvert at R.D. 1/920
Construction of road, road side drain and pipe culvert to plot No. 2-H,2-I, 2-J,Phase-II, Ind. Area Gwalthai Distt. Bilaspur (HP).
C/O Approach road for Culvert at RD 0/495on Link road from Amb Pathiar Sidhorapattan to Village Lahru in Km 0/000 to 0/500
R/O rain damages on SKRN road in km 94/00 to 102/180 (SH C/O damaged culvert and wire crate at RD 97/300).
Restoration of rain damages on motor able road ward no 1 village Rin G.P. Dhaloon District Kangra (HP) (SH-Construction of 2.00 mtr. span RCC culvert)
Road from Khadi Board to Gan Devta Mandir via British resort in Ward No 4 Annadale SH C O V Shape drain and Slabbed Culvert etc
C/O 1.00 meter span RCC slab culvert at RD 5/055, C/O wing wall at RD 5/045 to 5/054 and 5/056 to 5/065, C/O U- shape drain at RD 5/030 to 5/080 and C/O Breast wall in wire crate at RD 5/046 to 5/054 and 5/056 to 5/064
C/o U-shape drain with edge wall at R.D. 0/00 to 0/450 and 0/470 to 0/700, 1.00mtr. span slab culvert at R.D.0/420, R/wall at R.D. 0/00 to 0/060 and P/L CC pavement at R.D.0/00 to 0/450 and 0/450 to 0/700) Under Chief Minister Announcement work.
Construction of R/wall at Rd 3/990 to 4/00, 5/490 to 5/505, 5/180 to 5/190, 7/090 to 7/100, 7/285 to 7/310Providing and Laying Paver Block in various step at Rd 6/505 to 6/605, 7/210 to 7/260 an Construction of 2.00 mtr span RCC slab culvert at Rd
C/O solid causeway at RD o/510 to 0/560 and 0/930 to 0/980 missing CD
C/o 2 mtr span slab Culverts at RD 8/720
SH C.O 6.00 mtrs. Span RCC slab culverts at Km. 67.205
Construction of missing culvert on LPRR road km. 97/0 to 112/167(SH-Construction of 900 mm dia RCC Hume pipe clvert at RD 101/465)
Restoration of rain damages at various Location under Shimla Division No.III SH Construction of road side drain and repair of culvert near Himfed Petrol Pump at Rd08.105
Restoration of rain damages SH C O Culvert and Wire Crate R wall in the road from Shanan to Baba Balak Nath Temple in ward No 24
Improvement of Sultanpur to Chambi road Km. 0/0 to 1/0 (SH Construction of 6.00 mtr. Span RCC culvert ,Wing walls and lying of interlocking Paver)
Restoration of rain damages SH C O Culvert and Wire Crate R wall in the road from Shanan to Baba Balak Nath Temple in ward No 24
Job 9 Construction of Missing CD on Badehar Khui Pekhubela road km.0-0 to 3-600 Sub Head 3mtr. Span RCC culvert at RD.1-540
Construction of Link road from Kotli Bus Stand to Upparli Surrari Km. 0/00 to 4/120 under NABARD RIDF-XXXI, District Mandi (H.P.) MLA Priority 2021-22. (SH - ROFD, Formation Cutting, R/walls, RCC Hume Pipe, Slab Culverts and unlined surface drain etc
Construction of Taluna to Nishani (Badadarh) road Km 0/00 to 5/450 SH - F/C 5/7 mtr wide road in km. 1/00 to 2/00 and Construction of RCC hume pipe culverts at RD 0/315,0/610,1/070 and 1/600
Const and MT link road Nehri Santoo Tilla km 000 to 2000 in GP Nehri Naranga SH Formation cutting and filling including retaining walls between km 1000 to 1750 and 900mm dia RCC Hume pipe culverts at RD 1105 and 1135 and 1600 under MNP
F/C ,R/wal, causeway, Wire Crate wall and preparation of Sub Grade,GSB Km. 0/0 to 1/00
C/o link road Chilla Chogla Behal Sai Kanaitan Km. 4/150 (SH- C/o 3.00 meter span culvert at RD 1/180 with wing walls both sides)
Construction of link road Spedu to Goarth Km 0/00 to 2/00 (PDNA) (SW - F/C, R/Wall, Culvert, CC Pavement, Wire Crates, M/T Works etc)
C/O link road from (NH-205) Gara to Moru in Km. 0/0 to 2/0 (SH- C/o 6.00 meter span culvert at RD 0/900)
Construction of road, road side drains, culvert, water supply, sewerage system, leveling of site and protection work to plot at Ind. Area Pandoga Teh. Haroli Distt. Una (HP).
Construction of road from Kodewala. (SH- Construction of 10.80 mtr span RCC Box Cell culvert over Nimbu ka Khala at RD 1/0 to 1/015) Under MNP.