Loading…
Loading…
2,949 results • Best match
C.O LINK ROAD FROM HARIJAN BASTI KAKARBED INKM 0.0 TO 1.0 SUB HEAD 5.7 METER WIDE FORMATION CUTTING C.O R.WALL C.O 900MM DIA HUME PIPE CULVERT P.l gsb g-11 g-111 TARING IN KMM IN KM 0.0 TO 0.400 UNDER MMGSY
C/O link road from Tikkar to Dhauladhar km. 0/0 to 2/525(SH- Removal of formation deficiency ,C/O Retaining wall and Breast wall,C/O Hume pipe culvert providing and laying GSB km. 0/0 to 1/0) under SCSP
Job 8 Restoration of Rain damage link road Gurplah to Gondpur km 0-0 to 9-0 Sub Head C.O 600mm dia Hume Pipe culvert at RD 3-450 and P.L 600mm dia hume pipe Nallah at RD 3-300 to 3-450
C/O Kachinghatti Aur Galani Kalmu road Km.0/0 to 2/300 SH Formation Cutting in Km 1/000 to 2/300 C/O PCC R/Wal and B/Wall and C/O 90mm dia Hume Pipe Culvert at various Rd
Restoration of Rain Damages on Kaloa Pragpur Dhaliara Dada Siba Sansarpur terrace road km 0/00 to 9/00 (SH Construction of 900 mm dia Hume Pipe Culvert at RD 8/900, Approach path to School and U shape drain at various RDs )
Construction and M/T on link road from vill. Kalath Dhal Paliyara in G.P. Rajana (SH 5/7 mtr. Wide formation cutting from km. 1/705 to 2/360 and 900mm dia Hume Pipe Culvert at RD. 1/890 and 2/165)
C/O Sanoura Shimliya road km 0/0 to 8/150 (SH C/O 900 mm dia RCC Hume pipe culvert alnog with both side wing walls at RD 0/485 and u-shape drain at RD 0/475 to 0/575)
Construction of Bridge from MTN road to village Dial in GP Bari km 0.0 to 1.100 Under SCDP SH Construction of 900mm dia Hume pipe culvert at RD 2.265 and PL Wire create at RD 0.250 to 0.262.50 and 0.262.50 to 0.273
Construction of Flood control Embankment in Hume pipe Culvert D S Pong Dam Fatehpur Jassur road at Rd 34.352 near the house of Sher Singh Son of Sh. Kirpal Singh Village Lahroon Under MPLAD Deposit work Construction of both side Retaining wall
Temporary Restoration of Abandoned portion of NH 05 near Solding Bridge from Km 321/220 to 322/00 (SH. P/L Hume Pipe Culvert, R.wall in Wire crate and Filling in Embankment Between Km 0/420 to 0/530) under HPPCL Deposit
Job 6 Link road Gurodwara Tahlisahib from Samnal Baliwal road km.0-0 to 0-500 Sub Head Providing and Laying Hume Pipe culvert 900mm dia RD.0-290 and GSB and BC in km.0-0 to 0-500 Under MMGSY
Job 10 Construction of Link road to Village Bhatiara to Jongpur Tehsil Haroli Distt. Una Sub Head Formation cutting, Embankment, GSB in km 0-150 to 0-650 and C-O 900mm dia Hume pipe culvert at RD. 0-550 Under OTMNP
RRD on Kun galoo to Harizan Basti Padhar road km. 0/00 to 1/500. (SH- C/o 1200 mm DIA hume pipe culvert along with both side wing wall at Rd 0/290, 0/680 and 0/694) Under PDNA 2023
Reconstruction of B/Wall and C/o Hume pipe culvert.
Construction of R.C.C. Hume Pipe culvert at R.D. 1/035).
C/O RCC hume pipe culvert, soling, metalling and tarring.
C/o Hume Pipe Culvert , R/wall at various RDs
C/O Site Development and 900 mm Hume Pipe Culvert
Restoration of rain damages of path near Omni hotel Ward No. 2 S/H - Grade correction of path, C/o slab culvert road etc.
R R Damages to Link road village Kiterwari km 0 00 to 2 300 SH C o 6m slab culvert at RD 0 910
RR Damage on Koftu Karla PEkhadhar Bajashal road km 000 to 7500Sh ROFD Co 2 No 300 mtr span RCC Slab culvert 2700 2900
C/o link road from Dolowal to Bhogpur including 6 mtr RCC slab culvert AND approach, R/wall. (RD 0/00 to 0/300)
Job 3 A.R and M/O Una Takka road 0-0 to 1-500 Sub Head Extension of Slab culvert at RD 0-435.
Construction of link road from Thalla to Upper Thalla (SW - Construction of 3.00 mtrs. Span R.C.C Slab culvert at RD 0/080 (Deposit Work)
R R damage to Sheel Ganga Nagar Kupri Melthi road Km 0 00 to 10 00 SH 4m slab culvert at RD 6 220
Construction of link road from Thalla to Upper Thalla (SW - Construction of 3.00 mtrs. Span R.C.C Slab culvert at RD 0/080 (Deposit Work)
RRD on Sianj Kashan Road km. 0/00 to 5/00 (SH Repair of abutments of 6.00 mtr. Slab culvert at RD 1/780)
Construction of link road to Kaloh Babali from Babali SH Construction of R.C.C Slab culvert 3.00 mtr span at Rd 3/215.Under MMSY
Balance work of Dharamshala Yol Dadh Palampur road KM 27/000 to 33/000 (SW - C/o 2.50 Mtrs and 2.00 mtr Span RCC Slab Culvert at RD 31/776, C/o U-Shape drain , P/L Hume Pipe 900 MM dia i/c catchpit, C/o approaches for 2.50 mtrs Span RCC Slab Culvert)
C/o link road from Dadwal Helipad to village Dadrana Haryala Km. 0/0 to 3/500 (SH- C/o Retaining wall at various RDs, C/o 900mm dia hume pipe culvert at RD 0/180, 0/270 and 0/405 and C/o 3.00 meter span culvert at RD 0/480).
Restoration of rain damages on Darka Bhumteer road Km 0/00 to 7/000 (SH- Construction of 6.00 Mtr.span slab culvert at Km 3/800).
TMT Bar 20 mm dia, Shuttering Plywood 12 mm thick, Planks 50x50 mm L 1 point 80 M, Nails 15mm to 125 mm long, Binding wire 0 point 90 mm dia annealed conforming to IS 270-1978, Lifting strap one set for each culvert 6 ft lifting capacity 3 point 0 Ton, Ordinary Portland Cement OPC 43, Coarse sand sand shall be clean sharp, Stone aggregate shall be crushed stone 20mm
C/O Hume Pipe culvert at RD 13/0 and C/O Catch Pit, Wing wall for existing Hume pipe culvert at RD 13/040)PDNA 2025
C/O 6 mtr. span RCC slab culvert at RD 1/330 with approaches, C/O 900mm dia Hume pipe culvert at RD 0/075,solid causeway at RD0/730 to 0/740 and CC pavement in kms 1/570 to 1/630 and 2/175 to 2/250.
Balance work of road to shamshanghat, Bated, Balance work of channelization of Nalla Near park, Bated, G.P. Barotiwala, C/o slab culvert near park, Bated.
Ordinary to Kala Amb Paonta Dehradun road Km 46/00 to 103/00 on NH07 (SH Construction of RCC Slab culvert at RD 86/120)
C/O Ambulance road from APG University to village kawara km 0/00 to 0/450 (SH C/O Slab culvert at RD 0/160)
Construction of 4 m span RCC slab culvert C O Ambulance road from Shiv mandir noan to hara ward no 2 Nagar Panchayat Shahpur HP
Job 4 Restoration of rain damages for the C.O RCC slab culvert and U-shape drain at Una Amb road near Himotkrash G.P. School Lalsingi.
Construction of 6 meter span RCC slab culvert over Chatehar khad on link road vill. Narkhad km 00 to 1500 under GP Jole. Under MMGSY
R/R Damages of Link road from SH 16 to village Thanthewal SH C/o 8 mtr Span RCC slab culvert at RD 0/300
Construction of Neori Katwandhi road km 0.00 to 3.00 SH C.O 8.00 mtr. Span RCC slab culvert with both side wing wall at km. 0.450
R/R damages on Karsog Kunhu road Km. 0/0 to 10/0 (SH Protection work for abutment of slab culvert at RD 0/730)
Restoration of rain damages on Doghri Samana road Km 0/00 to 3/400 (SH - Construction of 6.00 Mtr.span slab culvert at Km 0/220).
R/R Damages on Marathu Tharolla Tahu Road in K.M. 0/00 to 17/100, Repair of abutment of slab culvert at R.D. 3/865
R R Damages to Rohru chirgaon Dodra kawar road km 0 00 to 92 250 SH Construction of 6m slab culvert at RD 88 670
CO and MT link road Harijan Basti Bhanjal km 0000 to 4000 SHCO 10meter span RCC slab culvert at RD 2395 ic approaches under MNP
R/R damages Solan Meenus Road km. 61/00 to 92/00 (SH C/O 4.00 mtr span RCC slab culvert at RD. 90/470)
R/R damages on Mari Ka Ghat Kerry Shutiya road km 0/0 to 23/00 (SH- C/O Slab culvert at Rd 19/660)
Balance work of road to shamshanghat, Bated, Balance work of channelization of Nalla Near park, Bated, G.P. Barotiwala, C/o slab culvert near park, Bated.