Loading…
Loading…
2,951 results • Best match
Construction of Link road Kathog (Bahni) to Village gharlahar Km 0/000 to 1/000 . (2 mtr RCC Slab Culvert at RD 0/380 (DEPOSIT)
R.R Damages on Ruturang Bridge to Bonning Saring road at Km 0.0 to 6.750 SH. C.O 8.00 Mtr Span R.C.C slab culvert at RD 5.540
C/O B/Wall, R/Wall hume pipe culvert and Soling.
C/o R/wall and Hume pipe culvert at various RDs
C.O Hume pipe culvert with wing wall at RD 1.960 PDNA
P/L laying 900mm dia Hume pipe culvert and retaining walls
Construction of 900mm dia Hume pipe Culvert at R.D. 8/200)
/o 900mm dia RCC hume pipe culvert at RD. 7/860)
Repair of 900mm dia hume pipe culvert at RD. 1/585
(SH- Hume Pipe culvert 900 mm dia at RD 3/815)
Provind and laying CC Pavement, R.Wall, B.Wall Hume pipe culvert) OTMNP
Construction of 900mm dia Hume pipe culvert at RD. 3/625
Repair and extension of Hume pipe culvert at RD 11/425
C/o hume pipe culvert 900mm dia at RD 1/125)
Formation deficiency and R/wall , Hume pipe culvert with wing walls
Constuction of 900 mm Hume Pipe Culvert at RD 3/470)
CONSTRUCTION OF LINK ROAD FROM KOTLA AMROH ROAD TO PATIYA BASTI IN GP AMROH TEHSIL JASWAN DISTT KANGRA HP UNDER INDUSTRIAL CORRIDOR SUB HEAD EMBANKMENTS 0.290 TO 0.600 P.L G-1 WIRE GRATE AT RD 0.290 TO 0.600 900MM DIA HUME PIPE CULVERT AT .345
Construction of link road Lower Jadrangal Sihund Baldhar linking Jassour Km 0/000 to 6/900 in Distt. Kangra (H.P.).(SH-Construction of 900mm dia Hume Pipe culvert at RD 1/930, 2/210, 2/600, 2/720 and 2/840 including both side approaches.)
Up gradation of Circular road around Awahdevi Temple km 000 to 1 800 in District Hamirpur HP SH Removal of formation deficiency C/O R wall C/O Parapet PCC side drain MT works CC pavement Paverblock Hume pipe culvert road furniture Under NABARD RIDF
C/o Link road from village Ratwa to kuna via Tholla Kulyari jarna Balaina km 0/00 to 7/00 (SH C/O 900 mm dia hume pipe Culvert at RD 0/090, 0/360, 0/510, 0/810, 1/030 and 1/645) MNP
Const of link road from Jawar Mairi road Near Ravi Dass Mandir to Khalmba in GP Jawar km 000 to 0980 SH Formation cutting including Rwalls Hume pipe culvert at RD 0227 and GSB WMM and Tarring between km 000 to 0500 under SCCP
C/O Link road to Village Bhawai Baleech km 0/0 to 2/870 (SH -SH -C/O 900 mm dia hume pipe culvert at RD. 0/495,0/665,1/045 and C/O PCC R/Wall from RD. 1/315 to 1/339)under MNP
Restoration of rain damages on link road Bharwain Aranwal road Km 000 to 500 SH CO 900mm dia RCC hume pipe culvert at RD 1820, ROFD in Km. 1720 to 1825 and CC pavement in Km 1410 to 1460 1695 to 2095 under PDNA2023
C/O link road Dharamshala Mahantan to Harijan Basti Godri Sidh km 0000 to 2220 SH Const of Retaining walls between RD 1412 to 2015 Gabrin wall between km 1412 to 1465 and 900mm dia RCC hume pipe culvert at various RDs under SCCP
C/O Ambulance road from Nirath NH-05 to Matena (Upper Nirath) Km 0/00 to 0/600 (SH. Formation cutting , C/O R/wall in PCC, C/O Hume pipe Culvert, C/O Drain and MT work between Km 0/00 to 0/600).
AR and MO link road Harijan Basti Bhanjal km 000 to 40 SH Providing and laying 80mm thick interlocking paver block between km 0075 to 0090 0290 to 0340 and 0450 to 0525 and CO 900mm dia RCC Hume pipe culvert at RD 0500
Construction of Garari Naichna Road km. 0/00 to 6/00 . (SH C/O Hume Pipe Culvert at RD. 1/060 ,1/550 and 1/770 with Wing Wall both side and C/O R/wall from RD. 0/080 to 0/090) Under MNP
Restoration of rain damages on Talara to Kutlahar road km. 0.0 to 2.750 SH P L G III and cement concrete pavement at RD 1.235 to 1.335 1.410 to 1.510 1.650 to 1.670 and construction of 900mm dia hume pipe culvert at RD 2.675.
CONSTRUCTION OF LINK ROAD FROM KALOHA SHANTLA ROAD TO SIDH PUNANI ROAD KM 0.0 TO 1.500 SUB HEAD 5.7 METER VIDE FORMATION CUTTING 900NN DIA HUME PIPE CULVERT NP2 AT RD 0.950 AND M.T IN KM 0.0 TO 0.200 AND 0.550 TO 0.850 UNDER OTMNP
Restoration rain damages on Chailla Neripul Yashwant Nagar Kumarhatti road Km 19/775 to 62/00 (SH Construction of Retaining wall and Breast wall between km 46/430 to 46/450 , 46/470 to 46/500, Hume pipe culvert at km 46/500 etc.under PDNA ).
Link road Heyon to village Bhuan shalyana km 0/00 to 8/500 (SH -SH -C/O 900 mm dia hume pipe culvert at RD. 0/030,0/195,0/630 and C/O PCC R/Wall from Rd. 0/500 to 0/520) Under MNP
Construction of link road from village Bharli to village Rudana Thada Zizla km. 0/0 to 4/00(SH- C/o 900mm dia Hume pipe culvert along with wing walls at RDs 2/730 , 2/920 and Breast walls at RDs 2/710 , 2/880)
Bela Ludharchan Thathi Haler Road at Km. 0.00 to 2.00 Under SCA SH Construction of RCC Hume pipe Culvert at R.D. 1.920 U shape drain at R.D. 0.660 to 0.810 and providing and laying Interlocking Cement Concrete paver block at R.D. 0.660 to 0.750.
Construction of Rister Panwa Dharoti Madhoura Nagol road km 0/0 to 6/500 (SH C/O formation cuting in Km. 1/500 to 1/950 C/O 900mm dia RCC Hume pipe culvert alongwith both side wing wall at RD 1/255). Under SCSP.
Job 7 Construction of link road Village Gondpur to Jaichand to Satsang Ghar via Dyala Moh Tehsil Haroli Distt. Una .HP Km 0-0 to 1-050 Sub Head C.O 900mm dia hume pipe culvert at RD 0-130, 0-140, 0-530 and C.o 2.00 mtre. Span Culvert at RD 0-840 U
Const of MT link road Chadda Mohalla in GP Deoli km 000 to 1130 SH Const of 900mm dia RCC Hume pipe culvert at RD 0800 1030 Causeway at RD 0050 and 0330 and Retaining walls at various RDs
C/O link road Gamarmod to Dharmana km 0/0 to 9/160 (SH C/O 2 Mtr Slab Culvert at RD 4/00) Under MNP
C/O Saleti to Bhinla Road Km 0/0 to 2/800 (Sh. C/O 8.00 Mtr RCC Slab Culvert at Rd 0/136 UNDR SCSP
Missing CD on Mahudhar to Nalwagi road Km 0/000 to 4/265 SH C/o RCC slab culvert 6.00 mtr span at RD 0/045
Restoration of rain damages on link road Sanoli to Melwan km.0.0 to 1.0 (SH C.O RCC Box slab culvert at RD.0.815) (Under DC Deposit)
Job 2 Construction of 2.50mtr. Slab culvert on link road to Abadi Khatrian of village Saloh at RD.0-550 to 0-750 Under Missing CD
C/O Guru kund talli road in km 0/0 to 12/00 (SH C/O wing wall at existing Slab culvert at RD 2/900).
R.R.Damages on Kun to Harizan Basti Padhar Km 0/00 to 1/500. (SH- C/O RCC slab culvert at Rd 1/380) Under PDNA 2023
R/R Damages on Ropru Padli road Km. 0/00 to 8/300(SH C/O 3.00 mtr span RCC Slab Culvert at RD 6/015)
Construction of link road Boh to Hambar Km. 0/0 to 1/500 (SH- Construction of 6.00 meter span RCC Slab culvert at RD 0/480).
Construction of Nalu to Ghiri KM 0/000 to 1/000 (SH- Construction of 3.000 meter span R.C.C. slab culvert at RD 0/120 ) Under OTMNP
Restoration of rain damages on SAKB road in km 50/0 to 70/0 (SH C/O 6.00 meter span slab culvert at Rd 58/600
Restoration of Rain damages on Nagujhor Mashna Thach road Km 0/00 to 10/500 (SH- Construction of 6.00 mtr.span slab culvert at Rd 3/100).
Construction of Link road Village Bambrad Km 0/0 to 2/00 (SH- Construction of 8.00mtrs Span RCC Slab culvert at RD 0/410)Under MNP
Ordinary repair to Kala Amb Paonta Dehradun road Km 46/00 to 103/00 on NH07 (SH Construction of RCC slab culvert at RD 86/050)