Loading…
Loading…
553 results • Best match
Construction of RCC slab Culvert near the house of Sudir Nag House at w-02 under Ambassa Municipal Council during the year 2024-2025
Approach Filling including palasiding work of Box culvert over Mukumui Twisa at Wanasa para of Kalyansingh VC under RD Gonda Twisa Division
Construction of RCC Box Culvert on the Brick soling road from Kunarghat to Balur Gang at Siman GP Under Mohanpur RD Block.
Mtc. of GM road under Teliamura Municipal Council during the year 2024-25/ Construction of RCC box culvert at Ch. 0.02 km
Construction of Single Cell Box Culvert (3.0m x 3.00m) at Dijapada para road under Bagma VC , Killa R.D.Block, Gomati District. (SOR-2023)
Construction of Double cell Box Culvert Near the house of Samir Kanti Dey at Paschim Khupilong GP under Tepania R.D.Block. (SOR-2023)
Demolishing of damaged existing RCC Box culvert including aprons over ghuramara chhera on Ranirbazar to Durganager road including dismantling materials 2nd Call.
Replacement of damaged slab culvert by RCC double cell box cell culvert (4.00MtrX4.00Mtr) on Churaibari to Dharmanagar road near Fulbari Panchayet and allied protection works etc. under PWD (RNB) Kadamtala SubDivision
Construction of RCC Slab Culvert (5x3)mtr near the house of Sunil Shil at ward-02 under Ambassa Municipal Council during the year 2025-2026
Construction of Sewerage RCC drain including slab culvert to JB school road at w-12 at under Ambassa Municipal Council during the year 2024-2025
Maintenance of Kulai baazar to Lalchari RCC Bridge approach road during the year 2019-20 SH- Construction of Slab culvert, drain (Length 90.00 metre) etc.
Constn. Of R.C.C single cell box culvert near the house of Laxmiram Gour at Natingcherra under South Unakoti V.C under Kumarghat R.D Block
Constructions of Box culvert on Nitya Bazar to Sukhmohan Bari road near Ahanti Hari Molsom under South Baramura VC of Killa R.D Block.
Construction of RCC earth protection wall near pond of Gopinagar CC road and pucca drain near box culvert at Gopinagar(PWD Sor 2020)
Construction of Single Cell Box Culvert (1.50X1.50mtr) near the house of Ramu Shil at Ward No-1, Ballavpur GP under Dukli RD Block
Construction of Single Cell RCC Box Culvert (3.00 mx3.00 m ) near Puskarbari Bardepha under Bishramganj GP of Charilam RD block.(PWD SoR 2020)
Construction of RCC Box culvert near the monky lal rubber garden at Ward No-5 under Paschim Fatikchera GP Under Mohanpur RD Block.
Construction of Box-culvert at the road near the land of Govinda Sarkar, w/no 02 of Gajaria GP under Mohanpur RD Block
Construction of RCC Box culvert (Single cell) near Sankar Deb house at Mohanbhog G.P under Mohanbhog R.D Block. (PWD SoR 2023)(2nd call)
Soling, WBM, paver block, carpeting, 2 nos. box culvert, drainage work etc
Construction of RCC Slab Culvert (4x3)mtr near the house of Dipak Paul at ward no-15 under Ambassa Municipal Council during the year 2024-2025
Constn. Of box culvert over Chalitacherra near the house of Abdul Mayub, Ward no.2 at Fulbarikandi G.P under Gournagar R.D Block.2nd Call
Construction of Box Culvert (4.00 mtr. X 3.00 mtr.) at Nagrai Twisa near Haricharan Jamatia House under South Sangang ADC Village, Ompi RD Block.
Construction of RCC single cell box culvert from Sankhala road to Ratanpur ADC village via Belfung at Uttar Nelka bari under Padmabil RD Block
Construction of Single Cell Box Culvert (3.00 m X 3.00 m) at Chichima Dam, Laltila under Noagaon GP of Old Agartala R D Block
Mtc.of road at Daspara portion from trijunction Shanitala to AMC CD SH Soling, Box culvert AND road side drain etc. During the year 202021
RCC Box-Culvert, WBM-III, Carpeting with sand seal coat and other allied works.
existing old and damaged culvert by providing i) single cell box culvert without footpath clear span 6.00 m clear carriage way 7.50 m and clear height 5.60 m ii) Double cell box culvert without footpath clear span (2x8.0m) 16.0m clear height 5.60m...
Restoration of Box culvert and CC road on the way of Chaimaruwa Bazar to Kharangsing para under North Brajendranagar VC, killa RD Block (SOR 2023)
Mtc of road from Industrial estate road to Ambedkarnagar via Molinabibi road during the year 2023 24 SH Construction of box culvert protection work etc
Strengthening of road from Pratapgarh bazar Box culvert to Central road extension via Surendrapally, Biswas para and Ghosh para under Pratapgarh Constituency Assembly 1.33 km
Construction of Hume Pipe Culvert at Jalai on Kailasahar- Kumarghat road NH-208
Construction of RCC Slab culvert near the house of Sunil Paul (near Chandraicheera Segregation Centre) at Ward No - 13 under Ambassa Municipal Council during the year 2024-2025.
Strengthening of road from Gabordi main road to Dhundrai via Bahumani para Length_4 km SH Slab Culvert Pucca drain GSB WBM_III Carpeting and other allied works 2nd Call
Construction of RCC Box Culvert NH of Rasendra Dey under Purba Fulbari GP Wno I under 54 Kadamtala Kurti AC under RD Dharmanagar Division Single Cell
Construction of Single Cell Box culvert near Manindra Debbarma land towards Rabindra Debbarma land at Kharia basti of Purba Bachai bari VC under Tulashikar RD Block
Construction of RCC Box Culvert (Single cell, 5.0 m x 4.0 m) near Gouranga Ashram, ward No-4, at Mohinipur GP under Mohanpur R D Block
Laying of Brick soling road from Pradip Kumar Jamatia Arecanut bagan to Mahpurush jamatia land near Box culvert under Dakshin Maharani VC under Matabari RD Block
Construction of R.C.C Double Cell Box Culvert (4.00mX4.00 m) width 4.5 mtr at Mohandaspara on the Sipling Cherra of Paschim Tamakari VC under Hezamara R.D. Block
Constn. of single cell box culvert 5mx5m near the house of Samiran Deb/ Achinta Deb at ward no.6 under Ichabpur G.P under Gournagar R.D Block
Construction of RCC Box culvert (Double cell) near the land of Naradmani Noatia at Uttar Taibandal VC under Mohanbhog R.D Block.(PWD SoR 2023).(3rd call)
Metaling, Carpeting, box culvert, pucca drain and protection work etc. during the year 2019-20. (3rd Call)
FDR/ Construction of double cell box culvert on Shyam Para Bali Para Road to Harbatali via IBBR at chainage 0.05km/ Construction of RCC boxcell culvert (2 cell, 4.00m x 4.00m) during the year 2024-25
Flood damage repair of road from Kamalasagar road to Pathariaduar G.P /SH-Replacement of damaged pipe culvert with double cell RCC Box Culvert (3.00 m x 3.00 m) during the year 2019-20.( 2nd call).
Construction of Box Culvert nh of Mainul Haque Ch under Kadamtala GP Wno I under 54 Kadamtala Kurti AC under RD Dharmanagar Division Single Cell 2nd CALL
Construction of 1 one Nos of Box Culvert Size 3.00 3.00 M at the road Bangalibasti to Deoacherra at CH 0.730 Km during the year 2025 26
Construction of Single Cell Box Culvert (1.80mX1.80mX5m) including R.C.C Retaining Wall near the house of Sudhanya Barman at Ward No-5, Maheshkhola GP under Dukli RD Block
Construction of Double Cell Box Culvert near Kishore Karbong land at Rupacherra GP span 10mx2m for karbong Community under Teliamura RD Block as per PWD SoR - 2020
Construction of Box culvert near the land of Amal Debnath house to Baldakhal SB School at Baldakhal of Gourangabazar GP under Rajnagar RD Block (PWD SoR-2023)
Construction of RCC Box culvert on Joyguru lane Padmapur near BBD Brick field at Dharmanagar Municipal Council area under 55 Bagbassa AC during the year 2025 26