Loading…
Loading…
553 results • Best match
SH-Earth work, P.C.C Work, R.C.C. work, C.C. block pitching, Brick soling, WBM-3 etc (2nd Call).
Construction of RCC culvert and pucca drain from the H.O Nantu Sarkar to PWD main road at S.D Mission under ward No 38 AMC.
Urgent Major Mtc. and strengthening of approaches of CDs, syphones, cut _ covers, aqueducts. Spun pipes, culverts, main canal in/c. branch canals of Right Bank Canal of KMIP (at Ch. 0.00 to 5500.00 Mtrs.) during the year 2025-26. (2nd Call)
Urgent Major Mtc. and strengthening of approaches of CDs, syphones, cut _ covers, aqueducts. Spun pipes, culverts, main canal in/c. branch canals of Left Bank Canal of KMIP (at Ch. 0.00 to 7500.00 Mtrs.) during the year 2025-26. (2nd Call)
Urgent Major Mtc. and strengthening of approaches of CDs, syphones, cut _ covers, aqueducts. Spun pipes, culverts, main canal in/c. branch canals of Left Bank Canal of KMIP (at Ch. 7500.00 to 17594.00 Mtrs.) during the year 2025-26. (2nd Call)
Urgent Major Mtc. and strengthening of approaches of CDs, syphones, cut _ covers, aqueducts. Spun pipes, culverts, main canal in/c. branch canals of Right Bank Canal of KMIP (at Ch. 5500.00 to 13600.00 Mtrs.) during the year 2025-26.(2nd Call)
Mtc of road from i Damcherra to Khedacherra via Cremationghat at Ch 0.00 Km to 1.00 Km ii Box cell culverts extension of slab at Ch 0.50km iii Under Ground water storage tank at PWD quarter complex under Damcherra Sub Division
Maintenance of different culverts in/c protection works etc.
Construction of RCC road i/nc drain,earth filling and palasiding at Dargapara road (Golaghati road to culvert) under Bishalgarh Municipal Council W/No-12
Construction of drain, paver block and culvert from the H.O Narayan Debnath to H.O Dilip Shil at Subhashnagar Jagat palli Under ward No 43 AMC.
Construction of Culvert near the house of Rabindra Acharjee at Shyamaprasad Palli ward no-1 under Sabroom Nagar Panchayat during the year 2022-23.( Size 4mX3m)
Construction of 1(One) no. of single cell Box Cell culvert (2000X2000mm) near the house of Amal Sur at ward no.03, under Santirbazar Municipal Council
Construction of Paver block road with cross culvert from main road to Terttiary Center at West Chandrapur under Dharmanagar Municipal Council for the year 2024-2025.
Construction of cross drain culvert at Pragati road near Deep ice cream factory and RCC drain near Durga Chowmuhani under Ward No-18, Agartala Municipal Corporation
F.D.R/ Construction of RCC Box-Cell Culvert over Nowacherra on the road from Yubarajghat to Karatiamura at Rangamura under Melaghar Sub Division during the year 2019-2020
Construction of Drainage Channel with Soak Pit near Matai PWD Office to near Samir Bose house culvert under Matai GP of Hrishyamukh RD Block (PWD SoR-2020)
UWS Schemes in North Tripura District during the year 2026-27/SH- Remodelling of DI pipeline at Natunpatty link road near culvert under DWS Sub-Division Dharmanagar
Proposed Const. work for 2 nos of RCC Culvert one at East side and one of West side of Banamalipur Dighi under ward no21,AMC 2nd call
Mtc.of road from Damcherra Khedacherra road at Khedacherra under Damcherra Sub Division during the year 2021 2022 SH Box Cell Culvert, Wing wall etc. at Ch.20.30 KM.
2. Replacement of existing damaged Spun pipe culvert near South baramura V.C. office on the road from Pitra to Nityabazar under Killa block during the year 2023-24
Works
Replacement of damaged spun pipe culvert with box cell culvert (4 Nos.).
Construction of RCC Culvert at KajachiCharra near the land of Anil Debbarma land under Bijoynagar ADC village under Boxanagar RD Blockunder Sepahijala Districtduring the year 2022-23(PWD SOR 2020).
Construction of following RCC Drains 1. from Rasaraj Nath house to Anjan Nath house ward No.8. 2.from Montu Paul to culvert ward No 12 Under Panisagar Nagar Panchayat.
Mtc. of road from Birmohan PWD road(Near Manindra Debbarma House) to Purbo Birmohan Culvert during the year 2025-26/SH Flat Brick soling, WBM-3, PMC etc.(L-700Mtr)
Improvement of road from Burighat to Gachirampara during the year 2021-22. SH Subgrade, GSB, Metalling, carpeting, spun pipe culvert, kutcha drain, pucca drain, sand cement block, etc. Length 0.90Km
Construction of RCC Box Cell Culvert (Single Cell, 4.0 X 4.0, width-7.0 mtr) at Aprangkhor in between Modibari to Dashgaria road under Shankhola VC of Hezamara R D Block
2. FDR Maintenance of road starting from NH8 near Harina upto the RCC boxcell culvert at Thaibong SH patch metalling patch carpeting CC side drain etc during the year 2019 20
Construction of pucca drain with brick wall from Purkaniya Madrassa to CD culvert at Putia GP under Boxanagar RD Block during the year 2020-21 (L-100 m)( PWD SoR 2020).
Construction of 3 nos culvert along with brick soling and CC earth protection wall at Khunia NBCC road to Sarkhi via old Khunia Para under Lowgang ADC Village, Karbook RD Block
Construction of Approach Road with both side Retaining Wall (50 M) Mechanical Cutting Carrying of Earth for Newly Constructed Culvert under MGNREGA near Bamutia Bazar, Purba Bamutia under Bamutia RD Block
FDR of road from Kanchanpur to Jalabassa under Jampui Hill Sub Division, PWD RnB during the year 2023 2024 SH Boxcell Culvert at Ch 9.50 Km approx. and Protection Wall etc.
COMPREHENSIVE MAINTENANCE TO IBB ROAD ID-104,105,106 AND 107(BP NO. 2075 TO 2120) UNDER SUB-DIVISION-I IN SOUTH TRIPURA DURING 2025-26. SH: ORDINARY REPAIR AND PATCH REPAIR, FLOOD DAMAGE REPAIR, RCC CULVERT, RCC RETAINING WALL AND BRICK WORK ... RCC CULVERT , ...
Urgent FDR on Jainbari Stadium road to Khakchang under killa PWD(RandB) Sub-Division during the Year 2024-25./S.H Construction of Wing walls of Culvert, RCC Drain cum protection wall etc
FDR of road from Kanchanpur to Jalabassa under Jampui Hill Sub Division, PWD RnB during the year 2024 2025 SH 1 nos 2.00 X 2.00 Boxcell Culvert at Ch 4.10 Km approx.
COMPREHENSIVE MAINTENANCE OF IBB ROAD ID- 110, 111,112 & 113, 114 UNDER SUB DIVISION-III IN SOUTH TRIPURA FROM 2218/1RI DURING 2022-23, 2023-24 & 2024-25. SH: ORDINARY REPAIR, SOLING, WBM, PREMIX CARPETING CULVERT RETAINING WALL, DRAIN AND ANCILLARY ... CARPETING, CULVERT , ...
Construction of RCC Box (Single cell) culvert ( 3.00 x 3.00 m) from Ratanpur High School on the wat to Chandranath Sardar Para Under Purba Ratanpur VC within Jampuijala RD Block. (PWD SoR 2020).
Replacement of spun pipe culvert by construction of box cell culvert (1.50 X 1.50Mtr) with protection work
SH- Patch Soling, Protection work,,Brick masonry culvert,(Clear 1.0 mx1.0 m spun pipe culvert, drain etc.
Mtc of road from Tolakona Pump House to Tripurasundari Nursing College via Jatindra Kabiraj Para SH Construction of 2 two nos single RCC boxcell culvert of clear opening 1000MM X 1000 MM 2nd Call.
Construction of Brick Soling road with 1 (one) no. CC Culvert approx measurement 5 x10 from the house of Dukhai Sarkar house to Laxmi Majumder house, Ram Thakur Para under AMC Ward No.47
OR N Work of NH08 at Ch 311point80 Km Panisagar Nagar Panchayet in the state of Tripura during the year 2021 22 SH Construction of RCC Box cell culvert and drain including catch pit
Construction of RCC Drain Near Sabroom English Medium H.S School Boundary to Culvert of Harinarayanpur Road via Pintu Paul house at ward No-2 under Sabroom Nagar Panchayat during the year 2024-25.(75mtr)
Const. of pucca drain ,road soling ,fiberglass sheet roofing and park grill mtc.i.ramkrishna Ashram road ii.Vidyasagar market.iii.Near ward office park repairing.iv.Bibekananda road existing culvert to river side brick soling under ward no.28,AMC.
Mtc of road from Bhuiermatha to Dinadayal Chowmuhani under Amtali Sub-Division during the year 2023-24/SH Construction of RCC box cell culvert 3point00 m X 3point00 m at Ch 1point00 km from Bhuiermatha
Establishment of Brood Bank at Mandwi FSC, Mandwi under RKVY-RAFTAAR(2021-22)_SH_ Construction of RCC drain along with cross drain culvert in the periphery of the western and northern side of Mandwi FSC
Mtc of KK road from Dakbanglo to Forest Drop gate during the year 2023-2024 SH Construction of Box cell culvert near Mahadeb bari road approach and Brick soling at DK.Das road to mahadebbari road.
FDR of road from South Anandanagar to Dukhiya kubra during the year 2024_2025_SH Strengthening of RCC Box Cell culvert at Padmamohan Para by construction of wing wall, protection wall, appron along with other allied works
Grouting, Patch Soling, Patch WBM-III, Carpeting, Seal coat, Painting of Bridges, Culverts and other allied works.
Flood damage repairing (FDR) of PWD road under Belbari R.D block during the year 2020-21 SH Construction of RCC box cell (3x3m) culvert at Ch 1.50 Km on Dasharam to Harinath Sardar via Kalasathi road.