Loading…
Loading…
553 results • Best match
Replacement of slab culvert by construction of Box-cell culvert (2.00 x 2.00 Mtr) with wing walls on Lalcherra to Dastilla PWD road at Ch. 1.00 Km near Bagantilla AWC
Construction RCC drain and box cell culvert including approach etc.
REPAIRS TO CULVERTS, STORM WATER DRAIN IN OFFRs, ORs MD ACCN AT MIL STN AGARTALA
REPAIRS TO CULVERTS, STORM WATER DRAIN IN OFFRS, ORS MD ACCN AT MIL STN AGARTALA
SH- Patch carpeting, Grouting, Sand seal coat, Protection work, RCC Box culvert (clear 2.0 x 3.5m), brick masonry wing walls, drain etc.
Construction of Brick masonry retaining wall (L 78.00 mtr) at Aralia from Box culvert to Harbal Das pond under Bishramganj Sub-Division
SH GSB WBM2 WBM3 Carpeting Construction of Pucca drain RCC Covered Drain Box culvert Retaining wall and allied works at different stretches
1. Construction of road side Drain and Culverts at District Hospital Complex, Tepania, Udaipur, Gomati Tripura
REPAIRS TO CULVERTS, STORM WATER DRAINS IN OFFRS AND OR MD ACCN AT MIL STN AGARTALA
SH- Widening of existing road, road side pucca drain, RCC Box Culvert etc./Phase-I (Re-carpeting 1.50 km, pucca drain only excluding widening).
Construction of Cement Concrete Gravity Retaining Wall (L-33.00 Mtr) and Rehabilation of damaged wing wall of Das Para Slab Culvert, Re-carpeting and Patch Carpeting etc.
SH RCC Box Culvert (1.50 Mtr x 1.50 Mtr) at Ch. 0.35 Km ReCarpeting with Sand Seal Coat WBM3 Pucca Drain and other allied works
Earthwork, Erosion Control and Drainage, Granular Sub-bases, Bases (Non-Bituminous), Bases and Surface Courses (Bituminous) ,Box Culvert and Toe Wall and Traffic signs etc.
Re carpeting,grouting,CD ,side drain
SH- Construction of WBM, Carpeting,seal coat on both side of the bridge approaches, in/c pucca drain and slab culvert (Span 1.00 M and Height 1.00 M).
Site Clearance ,Earthwork , Drainage Works, Protection work, Granular Sub-bases, Bases (Non-Bituminous) and Shoulders, Bases and surface course Traffic Signs, Markings and Box culvert etc.
Road improvement items, culvert construction items
Construction of Box-culvert (1.50 x 1.50 mtr) at ch. 46.06 km near Natun Bazar in/c WBM-2, WBM-3, DBM, Carpeting and sand seal coat
SH-Providing Patch Soling, Patch Metalling, Grouting and Re-Carpeting, Box culvert, Pucca Drain etc. Under BADP Scheme./ Phase-I and (Re-surfacing L-2.10 km only).
Construction of RCC box cell culvert on Policeline - Khupilong road at ch. 3.80 km during the year 2021-22/ SH Rcc Box cell culvert and allied works etc
SH-Widening of existing road, road side pucca drain, RCC box culvert etc/ Phase-II (Re-carpeting from Ch. 1.95 km to Ch. 3.15 km, road side pucca drain).
Construction
Construction work
Construction
Construction
Construction of Box-culvert (1.50 x 1.50 mtr) at Ch. 46.06 km (near Natun Bazar) in/c WBM-2, WBM-3, DBM, Carpeting with sand seal coat and other allied works.
Mtc of Box cell culvert of (i) 2 nos RCC Box Cell Culvert single cell over Local cherra on the road from Subhal Nama shop to Kukrania AWC (ii) 1 nos RCC Box Cell Culvert single cell over Local cherra on the road from Nalchar to killamura
REPAIR TO STROM WATER DRAINAGE CULVERT AND FOOTPATH AT MIL STN AGARTALA
Protection of culvert and construction of Rcc drain(Barabhaiya-Khupilong road) at West Khupilong Panchayet during the year 2020-21
Const. of RCC slab st. from Culvert near the H/O Sambhu Banik to the culvert point near water supply link road near joy guru under ward no.24, AMC
SH Earth work ,PCC work , RCC work , CC Block pitching, soling etc.
SH Site clearance Earth Work Protection Work Road Side Drain Granular Sub Bases Non Bituminous and Shoulders Bases and Surface Courses Bituminous Traffic Sign Markings and Other Road Appurtenances Box Culvert Re Plantation
Site Clearance, Earthwork, Protection Work (Retaining Wall and Toe wall), Drainage works, Granular Sub-bases, Bases (Non-Bituminous) and Shoulders, Bases and Surface Courses (Bituminous), Traffic Sign, Markings and other Appurtenances, Box Culvert.
Excess soil removal, Missing soling, Surface drains, Stone grouting, Patch metalling (Jhama Brick), Tack coat using hot bitumen, Re-carpeting using mechanical means (Paver finisher), Brick masonry drains, Box culvert, Traffic signs and markings .....
SH-Patch metalling, grouting, carpeting in/c sand seal coat, protection work , brick masonry drain and allied works. Gr. No-I /Protection from Routhkhala to Kashbha upto Box culvert (0.00 km to 5.00 km).
civil
Road Work
RCC construction
Development of culvert and other axillary roads to Joynagar-Rajnagar under AMC Ward No.34 and 36.
Construction
SH Construction of Box culvert approaches, patch soling, metalling, patch metalling, patch carpeting, premix seal coat sand seal coat etc with construction of RCC drain (portion from Ch 1 Km to Ch 1 pt 60 Km)
Maintenance of minor bridges and culverts under Gonda Twisa Sub-Division jurisdiction, PWD (RandB) during the year 2023-24/SH- Wearing course, mtc. of railings, painting etc.
civil works
Improvement of brick soled road from adjacent of PMGSY road to Dormitor Camp 1 at Haduklau Bru settlement (L -2.50 Km) under Ambassa RD Block / SH- Construction of wing wall by CC block of existing Slab Culvert at Ch. 0.65 Km.
FDR/Mtc of Road from UK main road to Salgharabarri / SH Construction of 1 No Box Culvert(Single cell), size 3.00m x 5.00m at Ch. 0.40km under PWD(RnB) Kakraban Sub Division during the year 2020-21.
Construction of RCC Box cell culvert
Formation of road with culvert from Dhaliarkandi market to Arabindanagar Colony under Gournagar RD Block.
Urgent Mtc. of road from Kanchanpur to Jalabassa under Jampui Hill Sub-Division, PWD(R and B) during the year 2023-2024 SH Boxcell Culvert near Govt.English Medium School, Boxcell culvert Approach road, Pucca drain etc.
Construction work
Construction of Cut off wall, Wing wall and Toe wall