Loading…
Loading…
1,770 results • Best match
CONSULTANCY SERVICES FOR PREPARATION AND SUBMISSION OF DETAILED PROJECT REPORT FO 1)CONSTRUCTION OF LIFT IRRIGATION SCHEME FOR FORMERS LAND IN AYANUR VILLAGE IN SINDHANUR TALUK OF RAICHUR DISTRICT. 2) CONSTRUCTION OF BARRAGE CUM BRIDGE IN BETWEEN KALAMGI AND BUKNETTI, KATAKA IN MASKI CONSTITUENCY OF RAICHUR DISTRICT.3)PROVIDING NEW LIFT IRRIGATION SCHEME FROM BALAGANUR-BADDILAPUR-UDBAL VILLAGE HALLA TO (SAGAR VILLAGE) IN MASKI CONSTITUENCY OF RAICHUR DISTRICT.T. (Package-3)
Annual Maintenance to (a) Malagund Barrage to Malapur road via Karekyatanhalli-Byatnal km 0.0 to 3.20, Km 4.20 to 5.00, Km 5.171 to 7.70 and km 8.394 to 8.70 (b) Hosa aladkatti-Honkan to Birur-Sammasagi SH-76 via Inamyellapur, Kondoji km 0.0 to 8.20 (c) Makarvalli to Malapur via Sheshgeri to Byatnal km 0.0 to 5.10 in Hangal taluk of Haveri district for the year 2025-26.
Construction of Bridge cum barrage to Lakshmisagara tank kodi halla near Tavarekere village, Construction of causeway in Sy.No 236 of Hendore village, Construction of checkdam & causeway near Tarur village, construction of causeway to halla across Yaladabhagi to Mudumadu road, Construction of checkdam cum bridge in Sy.No 99/1 of Chikkahulikunte village, Construction of causeway to Mudigere tank halla across the road which connects between Bacchikatte and Mekerahalli village in Gowdagere Hobli, Sira taluk
Providing man power for security of the chulkinala dam for the year 2025-26
Maintanance of road SH -155 Pattan Cross to Narayanpur Dam Km 34.63 to 98.46 km (Working Reach 66.40 to 98.46 from Km 82.46 to Km 92.46 & Km 93.46 to Km 98.46in Jewargi and Yadrami Taluka. Under 3054 SH Road Maintenance for the year 2025-26 (work Reserved for ST Category)
Annual Maintenance to Hidakaldam Hattialur Paraknati Road Km 0.00 to 5.00,and Pashchapur Paraknatti Ankalgudakshetra Hidakal Dam Road Km 0.00 to 2.53 and Km 5.00 to 7.30 in Hukkeri Taluka Belagavi District Under HOA 3054-04-337-1-10-200 Major District Roads Maintenance for the Year of 2025-26.
Consultancy service for submission of Detailed Project Report for the work Construction of Check dam cum bridge Guntumadu, Mannapur and Malekoppa villages in Yalaburaga Taluk of Koppal district with report, detailed surveying, Design and other relevant information required for DPR along with DTS 6 (Six) sets along with one soft copy.
Detailed Estimate for the work annual maintaince for repairs & replacement of parts of submersible pump set, motor cable, control panels, internal & external wiring, water supply mechinaries in SWM Site, H N Park, Eco Prak koral kute kere, reddy ... chiravathi dam in ...
Providing the 250 mm Dia DI Gate Valve in Naveelu Teerta Dam Site Jackwel Aria
Construction of Check dam near Bukkapatna Village in C.N.Durga Hobli in Koratagere Taluk, Tumkur District
Removal of silt and jungle clearance at vulnerable reaches from Ch 0.000 to 2.000 of RBC and LBC of Harinala, Removal of jungle clearance and scarifying in selected reaches of road from Navalgatti RC centre 1 to Hiremele and Removal of jungle ... Harinal dam .
Annual Maintenence work of 1) Chikkamaluru Tank in Kodigenahalli Hobli. 2) Protection Works to existing Check dam Cum Cause way near Veerapura Kalenahalli in Kodigenahalli Hobli, Madhugiri Taluk. 3) Protection Work in Hosakote tank Atchkat area in Koratagere Taluk. 4) Protection Work near Kallugutarahalli in C N Durga hobli Koratagere Taluk, Tumkur District.
Consultancy service for submission of Detailed Project Report for the work Constrction of Check Dam Across Tail Channel of Budshetnal tank in Budshetnal village in Koppal taluk of Koppal district with report, detailed surveying, Design and other relevant informations required for DPR along with DTS 6 (Six) sets along with one soft copy
AME
Improvements to Gambyapur-Kalghatagi Via Muttagi MDR Chainage Km 0.00 to Km 6.00 (At Selected Reaches) and Construction of Box Culvert at Chainage Km 4.00 and Improvements to Gambyapur-Devlingkoppa MDR Chainage Km 0.00 to Km 4.26 of Kalghatagi Taluk ... Waste Weir of ...
Survey Estimation for Improvements to Bramhasandra Tank in Tumkur Taluk Tumkur District.( RESERVED FOR CAT-IIA CONTRACOTRS)
The overhauling of Overhauling, servicing, repair of various capacity pumps at ADPH which includes repair, reconditioning of following pumps.1. Complete dismantling Kirloskar make split casing 120HP capacity model UP 200 38 cooling water pumps recondition with consumable spares like wear rings, bearings, O-rings and assembling and test run. 2. Complete dismantling Beocon make split casing 50HP capacity model SDCC 125150 cooling water pumps recondition with consumable spares like wear rings, shaft sleeves, bearings, O rings and assembling and test run. 3. Dis mantling of pump with motor of Dewatering pump capacity 180HP and replacement of sleeve nut of shaft and re assembly and test run. 4. Decoupling of motor of drainage pump of capacity 75HP and replacement of bearing with new one and assembly and test run.
Providing Manpower to Amarja Dam at Sangolgi Village Aland Taluka Kalaburagi District for the year 2026-27
Construction of Multi Aarch Check Dam at Sawantwadi patil at Managuatti village in Hukkeri Taluka Belagagvi Dist
GOODS INDENT
Replacement of Existing 1300HP VT pumps, providing trash rack to Head regulator, EOT crane for the maintenance of gate valves & NRVs, servicing and overhauling of air chamber surge protection, CC thrust blocks to 1500mm dia PSC pipe line joints and ... check dam across ...
Construction of Multi Aarch Check Dam at Kallappa Sunagar field at Yamakanmaradi RC Village Hukkeri Taluka Belagavi Dist
Conducting detailed survey at the project site as per Conditions in Bid Document and Directions of Engineer Incharge, Preparation of Detailled Estimates as per approved designs, Supplying Required number of DPRs for placing before TAC and attending to the observations of TAC/TSC,till it accords clearance to the Project and supplying the finalized DPRs in Required numbers to accord administrative approval and technical sanction etc,complete as per the directions of Engineer in charge.
CONSULTANCY SERVICE FOR DETAILED SURVEY, INVESTIGATION, PREPARATION OF DESIGN, DRAWINGS AND DETAILED ESTIMATE FOR CONSTRUCTION OF BRIDGE CUM BARRAGE ACROSS LOCAL NALA NEAR CHNADORI VILLAGE IN KAMALANAGAR TALUKA AND BIDAR DISTRICT
Detail consultancy Estimatefor the work of Construction of a series of Shirpur model check dams in the local streams near the villages of Kattituganv, Dongaragi, Kotagyal, Chimkod, and Marakhal in Bidar District, along with stream rejuvenation works and construction of recharge shafts.
Overhauling, servicing of EOT Crane 14 Ton and 7 Ton Capacity and replace requisite spare parts at Herkal South and Herkal North LIS Headwork
Removal of jungle and silt from Ch 23.40 Km to 26.4 km of D-5 of HBC and Removal of jungle and silt from Ch 26.40 Km to 30.50 km of D-5 of HBC, Removal of jungle and silt from Ch 30.50 Km to 35.00 km of D-5 of HBC and Removal of jungle and silt from Ch 35.00 Km to 40.00 km of D-5 of HBC
Repairs to damaged portion of CC lining at selected reaches and SR formation at selected reaches from Ch 11.00km to 22.00km of ARBC main canal and its distributary and Repair and restoration of gates of dy 18 and escape gates under DC-1 of TLIS
Removal of silt and jungle of Main canal from km 0.00 to 10.00 km 40.00 to 50.40,Lateral-3 of Dy-4 and Lateral-2,3,4 of Dy-14 (Selected Reaches) under Main canal DC - 1 of TLIS.
Removal of silt and jungle of Dy -19,20,21,and 22 and Laterals 06 and their Sub Laterals of Dy 10, Dy-17 and Dy -18 their Laterals Under DC-1 of TLIS.(Selected reaches)
Repair/Replacement of damaged distributory outlet gates under West main canal of Herkal South LIS.
Removal of silt and jungle of dy 6 and Dy7 and their Laterals, Dy-8, Dy-9 and Dy 10 and Laterals 01, 03 and Laterals 04,05,and 07 and their Sub Laterals of Dy 10, Dy11, Dy-12and Dy-13 their Laterals under DC-1 of TLIS (Selected reaches)
Restoration of Damaged Aquaduct at Ch. 2.750 Km and CTC at Ch. 1.395 Km of Kotegudda Sub Dty on Dty-1U/S of NLBC
Removal of silt and jungle from , Dy No 5,6, and 7 and lateral -1 of Dy No 6 , Dy No 8,9, and 10 and lateral -1 of Dy No 8, Dy No11 and lateral -1,2,3, and 4 of Dy No 10 under DC-2 of TLIS (at selected reaches)
Removal of jungle and silt from ch 0.00km to 3.00 km Manjlapur minor Distry under D-5 of HBC, Removal of jungle and silt from ch 3.00km to 5.94km Manjlapur minor Distry under D-5 of HBC and Removal of jungle and silt from Manjalapur Distributary of D-5 of HBC (Reserved for CAT-IIA)
Removal of jungle, silt and Improvements to SR for Selected Reaches from KM 0.00 to 14.50 KM of Dty-3D of NLBC, Removal of jungle, silt and Improvements to SR for Selected Reaches from KM 0.00 to 7.77 KM of Hanamasagar Sub Dty of Dty-3D of NLBC, Removal of jungle and silt at Geddalamari pick up on 3D of NLBC and Removal of jungle and silt at Rajankollur and Eedalabhavi pick up and its feeder canal on Lat-01 of D2 of HBC (Reserved for CAT-IIA)
Repairs to damaged portion of CC lining at selected reaches and SR formation at selected reaches from 22.00 to 33.00 km and its distributaries ARBC Main canal.
Removal of jungle and silt from Ch. 0.00 Km to 11.10 Km of D-5 of HBC, Removal of jungle and silt from Ch. 19.30 Km to 23.40 Km of D-5 of HBC, Removal of jungle and silt from Hanumnal pickup under D-5 of HBC (Reserved for SC)
RESTORATION TO CC LINING
Providing and Fixing solar water heater and TV to CE Quartes of Narayanpur Camp(Reserved for Cat-II(A))
Repairs and improvements to QC and R&R office building at Narayanpur (Reserved for SC)
Reconstruction of CTCs at Ch. 2.00 km and Road crossing at CH 2.90 km on 2A, CTC at Ch. of 2.50 km on 3B and CTC at Ch. of 2.10 km on 3C and CTC at Ch. of 3.40 km on D1 of NLBC (Reserved for Cat-I)
Construction of Pallakki katte/Pilgrims rest house near Chaya Bhagavti temple (Reserved for Cat-II(A))
Repairs and Improvements to 10 Nos of F type quarters at Narayanpur Camp (Reserved for Cat-II(A))
Overhauling, Servicing and replacement of requisite spares Transformer 7.5 MVA and 6.3 MVA of Capacity and supply of electrical spares at ARBC and TLIS Headwork
Removal of silt and jungle of Lateral-2 of Dy-10 Under DC-1 of TLIS(Selected Reaches). 2.Removal of silt and jungle of Distributories under Main Canal Ch Km 20.00 to 28.00km of DC-2 of TLIS.
Removal of jungle for selected reaches from 10.00 Km to 23.00 Km of NLBC, Removal of jungle for selected reaches from 23.00 Km to 35.50 Km of NLBC (Reserved for Cat-IIA)
Restoration Of CC Lining and Embankment
Repairs to damaged portion of CC lining
Repairs and improvements to B type quarters at Narayanpur Camp (Reserved for SC)