Loading…
Loading…
1,770 results • Best match
1Removal of silt and jungle of Dy 1,2 and 3 Under DC-1 of TLIS (Selected Reaches).2.Removal of silt and jungle of Dy-16 and Dy-23 under DC - 1 of TLIS(Selected Reaches).
Providing Manpower (Typist, Peons, Drivers,) to the Sr Health office & its Sub division Offices for the year 2024-25.
Providing Manpower for water management (Tank filling) of Dy No 26, 33 of BMC and Dy No 3,4,7 of HHBC under MLI stage-3 canal network for the year 2025-26.
Providing Manpower for operation and Maintenance of 1 MW Solar photo voltaic system & 11KV line and terminal Bay of solar plant at Ch .11.00km of ARBC main canal top for the Year 2025-26
Restoration of guide wall from Ch 0.00 km to 0.1 km and Reconstruction of Drop at Ch 0.5km and Ch 0.9km on SD2 of D5 of HBC and Reconstruction of Drop at Ch. 25.20 Km and D-5 of HBC
Removal of jungle and Improvements to SR for Selected Reaches from 0.00 KM to 6.00 KM of NLBC, Removal of jungle and Improvements to SR for Selected Reaches from 6.00 KM to 12.00 KM of NLBC and Removal of jungle, silt and and Improvements to SR for Selected Reaches from KM 0.00 to 4.00 KM of Dty 1A of NLBC and from 0.00 to 1.55 Km of Dty 1B of NLBC
Removal of jungle and silt from Hanumnal Canal under D-5 of HBC
Repairs and improvement to 10 Nos E-type quarters at Narayanpur camp
AME for Water Management of Main Canal from km 0.00 to 53.06km and its Distributaries Network (Dy No. 1 to 24) coming under DC-1 of Thimmapur LIS for the Year 2025-26
Operation and maintenance of Science Park by repairing and repainting of science models at Landscape garden
Removal of jungle for selected reaches from 0.00 Km to 10.00 Km of NLBC, Removal of jungle and silt for Selected Reaches from 0.00 to 4.00 KM of D-1A, from KM 0.00 to 4.00 KM D-1, from KM 0.00 to 1.55 KM of D-1B of NLBC, Removal of jungle and silt for Selected Reaches from KM 0.00 to 10.98 KM of D-2 and from KM 0.00 to 2.52 KM of D-1C of NLBC
Operation and maintenance of Electrical portion of Landscape garden i.e. Path lights, Road lights, Bollards, internal cabling etc by providing spares and providing high mast lighting at Ticket counter.
AME of Inspection bunglow at Narayanpur Camp
Removal of jungle and silt for selected reaches from Km 0.00 to 3.95 Km of D-1U/s and from Km 0.00 to 4.00 Km of Kotegudda sub Dty and from Km 0.00 to 6.00 Km of Rayangola Sub Dty of NLBC,Removal of jungle and silt for Selected Reaches from Km 0.00 to 14.50 Km of Dty-3D of NLBC, Removal of jungle and silt for selected reaches from Km 0.00 to 7.77 Km of Hanamsagar Sub Dty of Dty-3D of NLBC and from Km 0.00 to 5.91 Km of D2 of HBC
Excavation and removal of silt and silt mixed with sand from canal bed by manual means including disposing off the same in spoil or on Removal of Silt and Jungle clearance In the pump Chamber, forebay and intake canal under herkal North LIS
Reconstruction of Drop at Ch. 18.40 Km of D-5 of HBC
Maintenance of turfing on LBED of Narayanapur for two year
Operation and Maintenance of Electro-mechanical equipments, sub station and head work repairs & painting of Rajankollur LIS for two year
Reconstruction of CTC at Ch. 0.37 Km, 5.70 Km, 6.48 Km, 6.60 Km of Kakkera Major Distry
AME of water supply section of Narayanpur Camp
AME for Water management of Main Canal from km 0.00 to 27.88km and its Distributary Network (Dy No1 to 11) coming under DC-2 of TLIS for the year 2025-26
Supplying and Installing AMR(Automatic Meter Reading) Meter, Supplying and fixing RCC Pole with accessories, and Other Routine Maintenance Materials.
Providing Computers, Xerox machine, Scanner and Internet connection to the Gates Sub Division Office
Supply of Man Power for Maintanance of colony , inspection Bugalow, water supply & office Building in Narayanpur Camp for 2025-26
Repairs and improvements to 5 Nos of D type quarters at Narayanpur Camp
Reconstruction of Drop at Ch. 22.60 Km of D-5 of HBC
Overhauling, servicing and replacement of requisite spares for Pump No 5 6 at Herkal North LIS
Removal of jungle
Restoration of approaches on both sides of Herkal South Intake canal Bridge at kaladagi Village of Bagalkot District.
Rate contract for supply of necessary Articles like Water Filter ,Furnitures & Electrical Appliances ,accessories , for Day to Day Office Work for all Offices under Chief Engineer ,KBJNL,O&M Zone,Narayanapura
Restoration of Damaged Aquaduct Piller foundation at Ch. 0.125 Km, CTC (Deck Slab) at Ch. 2.120 Km, at Ch. 5.780 Km on Hanamasagar Sub Dty and Restoration of Damaged CC lining from Ch. 0.00 to 0.030 Km on Lat-2 of Hanamasagar Sub Dty of 3D of NLBC
Restoration of CTCs at ch.9.380 KM on D2 of NLBC and CTC at ch. 1.420 KM on D-3B of NLBC and Restoration of CTCs at ch. 0.850 KM, 3.080 KM on D-2A of NLBC
Removal of jungle and silt from Channapatna minor Distry under D-5 of HBC
Removal of jungle and silt from Ch 6.00 Km to 9.00 km of Kakkera major distry of D-5 of HBC, Removal of jungle and silt from Ch 9.00 Km to 13.10 km of Kakkera major distry of D-5 of HBC
Removal of jungle and silt from Ch 0.00 Km to 3.00 km of SD-2 of D-5 of HBC and Removal of jungle and silt from Ch 3.00 Km to 6.00 km of SD-2 of D-5 of HBC, Removal of jungle and silt from Ch 6.00 Km to 9.00 km of SD-2 of D-5 of HBC and Removal of jungle and silt from Ch 9.00 Km to 12.00 km of SD-2 of D-5 of HBC
Removal of jungle and silt from Godihal Feeder Channel under D-5 of HBC and Removal of jungle and silt from Raygera Feeder Channel under D-5 of HBC, Removal of jungle and silt from Ch 0.00Km to Ch 3.00km of Raygera Distributary of D-5 of HBC and Removal of jungle and silt from Ch 3.00Km to Ch 6.30km of Raygera Distributary of D-5 of HBC
Operation and maintenance (AME) of Herkal LIS (North& South)headwork for the year 2025-26 and 2026-27 (Labour and Material)
Rate contract for supply of Tyres,Tubes and Batteries for Government Vehicles for all Offices under Chief Engineer ,KBJNL,O&M Zone,Narayanapura
Repairs and Restoration of Approaches of SP and CC Lining At CH Km 14.90,15.10 and 15.44 Under Main Canal of DC 1 TLIS. Rising of Embackment at Ch 2.02km in Dy-10 and In main canal at Ch 10.50km (selected reached) under DC-1 of TLIS
Removal of jungle and silt from Kakkera pickup under D-5 of HBC, Removal of jungle and silt from Manjlapur pickup under D-5 of HBC, Removal of jungle and silt from Hirehalla pickup under D-5 of HBC
Removal of jungle and silt for Selected Reaches from Km 0.00 to 8.890 Km of HBC including its MCPC and Lat-1R from 0.00 to 2.500 Km of 3D1 of NLBC,Km 0.00 to 11.30 Km of Dty-D3 of HBC,0.00 Km to 1.29 Km of Dty-D4 of HBC,from KM 0.00 to 4.290 KM and Laterals from Km 0.00 to 2.24 KM of Lat-01,Km 0.00 to 2.20 Km of Lat-02 of Dty-D1 of RKLIS,from KM 0.00 to 2.840 KM and Laterals from Km 0.00 to 2.54 KM of Lat-01,Km 0.00 to 2.65 Km of Lat-02,Km 0.00 to 1.170Km of Sub-Lat of Lat-02 of Dty-D2 of RKLIS
Supply, erection, testing and commissioning of Potential Treansformer(PT) at Herkal North LIS Headwork.
REMOVAL OF SILT & JUNGLE
Removal of jungle at IP side in Main Canal from Km Ch 10.00 to 20.00 and removal of silt in Dy 10 from Km Ch 5.00 to 8.00 Removal of silt jungle for Lateral No.1 from CH 0.00 to 2.80 km Lateral No.3 from Km 0.00 to 0.640 km of Dy-10. for Lateral No.4 from CH 0.00 to 1.24 Km.& Lateral No.5 from Km 0.00 to 2.20 km of Dy 10 for Lateral No.7 from CH 0 to 8.46 Km of Dy 10 .for Sub Lateral No1.2.3 4 of Lateral No 6 of Dy 10 under under DC1 of TLIS Selected Reaches
Reconstruction of CTC at Ch. 2.20 Km, 2.50 Km, 2.53 Km of Hunasihole Distry under D-5 of HBC
Operation and maintenance (AME) Of ARBC Headwork and Timmapur LIS Headworks for the year 2025-26&2026-27(Labour&materials)
Reconstruction of Drop at Ch. 22.30 Km of D-5 of HBC
Removal of jungle and silt for Selected Reaches from KM 0.00 to 4.30 KM of D-2A, from KM 0.00 to 1.36 KM of D-3A and from KM 0.00 to 2.77 KM of D-3B of NLBC, Removal of jungle and silt for Selected Reaches from KM 0.00 to 4.50 KM, from KM 0.00 to 10.50 KM Hulikeri Sub Dty on 3C of NLBC
Providing Manpower (Typist, Peons, Drivers,) to the Senior Health office & its Sub division Offices for the year 2025-26.
Operation of Maintanace of (AME) of Herkal LIS(North & South) headwork for the year 2024-25 (Material Man Power )