Loading…
Loading…
1,770 results • Best match
Repairs Of Distributary Gates No-3, 4 & 7, Repairs to the demaged portion of Distributary No.7 CC Lining and Tailing Off of Distributary No-3 of Huvina Hipparagi Branch Canal under MLI Stage-III.
1Removal of silt and jungle of Dy 4 and Dy-5 under DC - 1 of TLIS(Selected Reaches).2.Removal of silt and jungle of Laterial no 8 and Sub Laterial no 7 of distributory no 10 under DC - 1 of TLIS.3.Removal of silt and jungle clearance From km 22.00 to 33.00 km at (Selected Reaches) and its Distributaries under ARBC.
Repairs and improvements to 3 Nos C type quarters at Narayanpur Camp (Reserved for SC)
Repairs to 2 Nos of D and 3 Nos of E type quarters and AEE quarter at Kakkera Camp( Reserved for Cat-II(A))
Restoration of Damaged CC lining from Ch. 0.285 to 0.295 and Sopanum at Ch. 0.550, 0.785, 0.950, 1.250 Km on HBC (Reserved for SC)
Reconstruction of Drop at Ch. 18.10 Km of D-5 of HBC (Reserved for ST)
Repairs to damaged portion of CC lining
Reconstruction of Damaged CC lining for selected reaches from Ch. Km 0.00 to 2.600 Km of Dty-D1 and from Ch. Km 0.00 to 1.500 Km of Dty-D2 of RKLIS (Reserved for SC)
AME for water management of main canal and its distributary Network under Herkal LIS(North & South) for tank filling purpose for the year 2025-26
Maintenance of Canal system, intakes for supply of water to field for irrigation purpuse duly maintening / operation of sluice gates / head regulater / escape regulators, removal of jungle of all types on SR & IP , slopes of the canal, removal of silt and obstructions during flow of water in the canal, filling up / maintaining SR & IP including rain cuts of canal embankment / cutting etc, complete as directed by the Engineer -in - charge.
Providing and Fixing of Pump cooling pipeline and filter assembly at Herkal South Headwork.
AME of Electrical Section of Narayanpur Camp (Reserved for CAT-II(A))
Overhauling, Servicing and replacement of requisite spares of EOT Crane 30/5 and 15/5 Ton Capacity and servicing of 25 KV DG set at ARBC and TLIS Headwork.
Removal of silt and jungle clearance under East main canal of Herkal South LIS
Providing Man power for day to day observing the water levels of Almatti Reservior for the year 2025-26 & 2026-27.
Repairs to damaged portion of Head regulators
Overhauling, servicing, and replacement of requisite spares for Pump No 6 8 & 9 at Herkal South LIS
Operation and Maintenance of Toilet blocks coming under landscape gardens
Repairs to 5 Nos of D and 5 Nos of E type quarters and AEE quarter at Kodekal Camp (Reserved for SC)
Operation and Maintenance of Colour Static Moghal Garden Fountains
Repairs and improvements to helipad at Narayanpur Camp (Reserved for ST)
Restoration of Damaged CC lining for selected reaches from Ch. 0.00 to 11.30 Km and Restoration of damaged CTC (Deck slab) at Ch. 0.330 Km and Repairs to DPO 1 & 2 of at Ch. 0.370 Km DPO 4 at Ch. 1.60 Km, DPO 9 at Ch. 2.350 Km, Lat-1R offtake at Ch. 3.060 Km DPO 12 at Ch. 3.980 Km, DPO 13 at Ch. 4.430 Km, DPO 15 at 4.950, Lat-1L offtake at Ch. 5.050 Km, DPO 18 at 5.70 Km, DPO 24 at 7.02 and Restoration of damaged drop at Ch. 2.370, 2.535 Km and Construction of Drop at 5.065 Km Dty-D3 of HBC (Reserved for Cat-IIA)
Removal of Silt and Jungle for Lateral No - 6. from Ch No - 0.00. To 6.305.Km of Distributory No 10. under DC - 1. of TLIS.
Reconstruction of CTC at Ch. 8.50 Km, 8.10 Km, 9.10 Km, 11.00 Km of Kakkera Major Distry (Reserved for SC)
Replacing of damaged railing of Don aqueduct from ch. Km 22.270 to 22.800 of NLBC and AME for two years (Reserved for Cat-II(A)
Restoration of damaged CC lining from ch. 1.230 to 1.600 km Lat-7 of D-2 of NLBC (Reserved for CAT-IIA)
Restoration of guide walls from Ch 0.53 km to 0.63 km of Hunasihole distry under D5 of HBC (Reserved for CAT-I)
Restoration of Guide Walls from Ch 0.0 to 0.03km and Drop at Ch 0.35 km of SD-1 of D5 of HBC (Reserved for SC)
Removal of jungle and silt from Hosur major Distry of D-5 of HBC, Removal of jungle and silt from Hosur minor Distry of D-5 of HBC (Reserved for SC)
Removal of jungle, silt and Improvements to SR for Selected Reaches from KM 0.00 to 4.290 KM of Dty-D1 of RKLIS, from Km 0.00 to 2.24 KM of Lat-01& from Km 0.00 to 2.20 Km of Lat-02 of Dty-D1 of RKLIS, Removal of jungle, silt and Improvements to SR for Selected Reaches from KM 0.00 to 2.840 KM of Dty-D2 of RKLIS and from Km 0.00 to 2.54 KM of Lat-01, from Km 0.00 to 2.65 Km of Lat-02 & from Km 0.00 to 1.170Km of Sub-Lat of Lat-02 of Dty-D2 of RKLIS (Reserved for ST)
Removal of jungle and silt from Ch 0.00 Km to 3.0 km on SD-1 under D-5 of HBC, Removal of jungle and silt from Ch 3.00 Km to 5.50 km on SD-1 under D-5 of HBC and Removal of jungle and silt from ch. 12.00 km to 19.30 km D-5 of HBC (Reserved for ST)
Removal of jungle and Improvements to SR for Selected Reaches from 12.00 KM to 18.00 KM of NLBC, Removal of jungle and Improvements to SR for Selected Reaches from 18.00 KM to 24.00 KM of NLBC, Removal of jungle and Improvements to SR for Selected Reaches from 24.00 KM to 30.00 KM of NLBC and Removal of jungle and Improvements to SR for Selected Reaches from 30.00 KM to 35.50 KM of NLBC (Reserved for CAT-I)
Removal of jungle, silt and Improvements to SR for Selected Reaches from KM 0.00 to 3.95 KM of D-1U/S of NLBC, Removal of jungle, silt and and Improvements to SR for Selected Reaches from KM 0.00 to 6.00 KM of Rayanagola Sub Dty 1 U/S of NLBC, Removal of jungle, silt and and Improvements to SR for Selected Reaches from KM 0.00 to 5.00 KM of D-1D/S of NLBC and Removal of jungle, silt and Improvements to SR for Selected Reaches from KM 0.00 to 4.00 KM of Kotegudda Sub Dty of NLBC (Reserved for SC)
Removal of silt and Jungle at Dy-3,4 & 7 (at selected reaches) of HHBC under BMC, Ch 12.00 to 14.50km (at selected reaches) of Dy-26 of BMC , Ch 0.00 to 11.20Km (at selected reaches) of Dy-33 and its laterals of BMC.
Restoration of CC lining from Ch.4.50 to 5.50Km of west main canal under Herkal South LIS
Restoration Of CC Lining and Embankment reach from chainage 8.50KM to 9.60Km and Grounting (Water proofing) of Aqueduct including trough joint from Chainage 6.70Km to 8.20Km of west main canal under Herkal south LIS.
Restoration of damaged portion of canal and SR formation at 4.2km to 4.5km of DC-2 Main Canal of TLIS
Restoration of damaged portion of canal & SR Foramtion at 21.20km to 21.40 & 24.50 km to 24.60km of DC-2 Main Canal of TLIS
Restoration of CTC at Ch. 10.635, 11.145, 11.765 Km on Dty-3D of NLBC (Reserved for SC)
Rate contract for supply of Essential Stationery Items Printer cartridge,& Printing Equipment etc for Day to Day Office Work for all Offices under Chief Engineer ,KBJNL,O&M Zone,Narayanapura
Operation and Maintenance of water supply jackwell to the colony and gardens at Almatti D S for the year 2025-26
Operation & Maintenance Musical Dancing Fountain & Laser show & 3D Projection Mapping inside Landscape garden at Almatti D S
Repairs Of Distributary Gates No-3,4A,7,10B,12 of ARBC and Repairs to damaged portion of CC Lining from ch 2.10 km to 2.78km of dy 7 of ARBC
Providing Man Power Typist, Peons, Drivers, Watchmans and House Keeping Labors to the Managing Director KBJNL Almatti office for the year 2025-26.
Repairs, painting of Head work of Bonal LIS
Providing Furnitures and Cubics to New CE office Building at Narayanpur Camp
Operation & maintenance of Lazy River fountains, Dome, Surprise, Fun, Fast Action, Rocky & Marble fountains inside Landscape garden at Almatti D S
Removal of silt and jungle clearance under West main canal of Herkal South LIS
Dredging and desilting work in Pumps Bowl chamber, Forebay and Removal of Silt in intake canal under Herkal South LIS Headwork
Overhauling, Servicing of Transformer 9.00Mva and 2.50Mva of capacity and requisite spare parts at Herkal South and Herkal North LIS Headwork.