Loading…
Loading…
1,770 results • Best match
Periodical post monsoon maintenance of crest gate, river sluice gate, gantry crane and canal sluices includes wire rope, radicon gear unit, motor assembled unit, pullys and line shafts provided in Kabini dam for the year 2025-26.
Construction of Bridge(Box Culvert) to Pattan Cross to Narayanpur Dam Road SH-155 at Ch 120.40 & Ch 129.20 in Hunasigi Taluka, Yadgir District. Under 5054-80-190-0-01-132 KRDCL for the year 2025-26
CONSTRUCTION OF PROTECTION WALL ON PATTAN CROSS TO NARAYANAPUR DAM ROAD SH-155 at KM 131.00 IN HUNASAGI TALUK YADGIR DISTRICT. UNDER 5054-03-337-0-16-154 STATE HIGHWAY BRIDGE IMPROVEMENTS FOR THE YEAR 2024-25
Construction of Bridge (Box Culvert) to Pattan cross to Narayanpur Dam SH-155 at Ch 118.80 and Ch 120.00 in Hunasigi Taluka Yadgir District. Under 5054-80-190-0-01-132 KRDCL for the year 2025-26
M & R to Sambargi-Naganur, Sambargi-Naganur (Devamane Tota), Bevanur, Malabad, Naganur, Kiranagi (Site-3), Naganur P.A. (Site-2), Ugar, Mangasuli (Site-1), Mangasuli (Site-2), Ajur Halla, Kiranagi (Site-2), Ainapur-Shedabal, Pandegaon (Khotawadi), ... Bandhara/ Barrage / ...
Construction of R.C.C One way surge tank Supply and fixing of air valves and zero velocity valves and allied works at different chainages for rising main pipelines laid from Head works at Yargol dam to 13 MLD capacity WTP at Bangarpete 13 MLD ... Yargola Dam as ...
Providing Consultancy Services for Survey, investigation, design, estimate and preparation of Detailed project Report (DPR) for Water Supply Scheme from Vanivilas Sagara Dam to Tumakuru Industrial Township (CBIC) via Metikurke Industrial Area and Sira Industrial Area (2nd Call)
Preparation and Submission of Detailed Project Report for 1) Construction of Check Dam Cum Bridge Across Suvarna Mukhi Halla Near Ankasandra Village, 2) Construction of Checkdam Cum Bridge Across Halla Near Marenadu Palya Village, Chikkanayakanahalli Taluk, Tumkur District.
Providing out sourcing Man power for Manchanabele dam, MP sub division office, Manchanabele Project division office and Drivers to office vehicles of Executive Engineer, MP Division, Assistant Executive Engineers No1 MP sub division for the year 2026-27
M & R to Khotanatti ((Site-1) & (Site-2)), Hosatti, Aigali (Halalli tota), Kohalli (Site-1), Kohalli (Site-2), Ramthirth, Adahalli (Kenchannavar tota), Adahalli (Bhajantri Tota), Adahalli, Yalihadalagi (Vitthal Nagar), Yalihadalagi (Biradar Tota), ... Bandhara/ Barrage /BCB ...
Consultancy services for Survey, Investigation, Detailed Designs, Drawings, Preparation of Estimates for Amasebailu Lift Irrigation and Madamakki Lift Irrigation Schemes for Construction of Barrage and Lifting water from Varahi River for providing Irrigation facility to lands in Amasebailu, Hengavalli, Rattadi, Macchattu, Madamakki, Shedimane, Belve and Hiliyana Villages in Kundapur Taluk of Kundapur Vidanasabha Constituency of Udupi District.
Improvement to feeder canal from Madulur tank to Melkunte tank, providing protection works to beside lands and checkdam in halla which runs from Lingadahalli tank to Kotta tank in Kasaba Hobli, Providing protection works to Sy.No 72 of Thimmanahalli ... cum barrage to ...
Dismantling and repairing the 160KVA transformer 11000/433 Volts oil cooled distribution transformer by providing new winding (both three phase HV & LV) in place of damaged winding including cost of copper conductor. (After deducting old copper scrap ... Diversion Weir Site.
Flood Protection work for Holeneralekere near waste weir in Tadasa Village in Bhadravathi Taluk Shimoga District
Consultancy service for preparing a Detailed Project Report DPR and conducting a topographical survey to lead the excess water from Hebballa pickup to fill Gundal dam and also to the Kabini Right Bank Canal in Kollegala taluk Chamarajnagar District
Construction of check dam on the stream flowing near the land of Scheduled Tribes land Survey No. 312, 861, 862 & 863 of Kanajanahallli Village in Dharmaura hobli and Survey No. 251 of Kariyala Village Javanagondanahalli Hobli in Hiriyur Taluk
Improvements to Road from Pattan Cross to Narayanpur Dam Road SH-155 Km 127.10 to 130.10 (Working Reach Km 129.00 to 132.03) in Hunsagi Taluka, Dist. Yadgiri (Under 5054 SH Road Improvements Appendix-E for the year 2024-25)
CONSULTANCY SERVICES FOR SURVEY WORK FOR THE WORK OF CONSTRUCTION OF CC BOX DRAIN FROM SRI MAHADESWHARA TEMPLE TO GANIGARA NINGAIAHANA LANDS, CONSTRUCTION OF CHECK DAM AND PROTECTION WALL IN KEMPASIDDANA HUNDI VILLAGE CHIKKAIANA CHATA HOBLI NANJANAGUD TALUK MYSURU DISTRICT
Re-sectioning of Halla including jungle clearance for Water let out from Yettinahole gravity canal offtake Ch.32.500 Km to VVS dam through Avuthi Halla from Ch.14.455 Km to 132.800 Km in Chikkamagaluru and Kadur Taluk ( In selected reaches)
Maintanance of road SH -155 Pattan Cross to Narayanpur Dam Km 34.63 to 98.46 km (Working Reach 34.63 to 66.40)from Km 34.63 to Km 46.63 in Jewargi and Yadrami Taluka. Under 3054 SH Road Maintenance for the year 2025-26
Construction of Series of Shirpur Pattern Check Dam, Nala Deepening & Widening and Recharge Shaft from Gonal to Bendebemballi, From Haranagera to Hothpet and From Mavinmatti to Alu-Ammapur Villages of Yadgir District (Under 4702-APB for the year 2025-26)
Estimate for Annual Maintenance at Ch.11.27 to 14.10km of Budikote to Markondeya Dam and Join SH-99 Road Via Join Malur Taluk Toralakki Road (Ch.11.27 to 14.10km) for 2026-27 in Bangarpet taluk, Kolar Dist. (Reserved for Cat-IIA)
Custom Bid for Services - supply of 6969 Unskilled mandays for cleaning of PWD road and drains and attending plant civil works jungle cleaning works inside tailing dam and assistance to survey work at civil department for the FY 2024 25
Facility Management Services - LumpSum Based - Office of the Executive Engineer KNNL GRBCC Division No 2 Hidkal Dam; Computer operators with relevant certificates 12 nos And Driver with HMV or LMV Licenses 04 Nos and Group D workers 07 Nos; C..
Removal of silt and jungle from Ch. 0.00 Km to 25.00 km (Upto Kodihalli Village), and Providing Embakament for Service Road in Selected Reaches and Reconstruction of Damaged Wall and Escape Sluice of Relieving Weir at Ch. 4.90 km (near Hunasehalla) and Repairs to Gates of Selected Distributories of RBC under DB Kere Pickup Project
ROAD SAFETY WORKS ON HIGHWAY CONNECTING PATANA CROSST TO NARAYANAPURA DAM ROAD (SH-155) TO NARAYANAPURA DAM FROM KM 159.30 TO 160.30KM SURPUR TALUK YADGIR DISTRICT.
1. MANUAL DIAPHRAGM VALVE, FLANGE END, RUBBER LINED, WEIR TYPE NON-INDICATING STEM. SIZE-25MM, 2. MANUAL DIAPHRAGM VALVE, FLANGE END, RUBBER LINED, WEIR TYPE NON-INDICATING STEM. SIZE-40MM, 3. MANUAL DIAPHRAGM VALVE, FLANGE END, RUBBER LINED, WEIR ... LINED, WEIR TYPE ... LINED, WEIR TYPE ... LINED, WEIR TYPE ...
Replacing olddamaged sponge rubber,Removing and refixing M.S GatesFixing of New MS Gates,M 25 concrete for super strcure.
Consultancy service for Preparations of DPR for the Construction Of Check Dams across kushavathi halla near Upparahalli Village, Byarasandra Village, Nallaguttahalli Village, and Yasagalahalli Village Chinthamani Taluk, Chickkaballapur District
Construction of Bridge cum barrage to halla across the road which connects between Honnenahalli to Gomardhalli villages, construction of checkdam in Sy.No 4/1 of siddapura village, Sy.No 53 of Honnenahalli village, construction of checkdam & causeway to Sy.No 67 of Gowdagere village and Providing protection works to existing checkdam constructed across Chikkasandra tank kodi halla in gowdagere hobli, Sira taluk
M & R to Belagundi, Gajapati, Sulaga, Kukadolli, Rakaskoppa, Yalebail-Sonoli, Kallehol, Hindalaga, Mutnal (Site-I), Mutnal (Site-II), Kukadoli-Veerpankoppa, Hindalaga-2, Aralikatti, Desur, Aralikatti-Bassapur, Aralikatti-Hulikatti, Mannur-Sulaga, ... / Barrage /BCB ...
EXECUTION OF WORK UNDER MW (CONS) TO THE WHOLE LENGTH OF THE REMAINS OF THE ANCIENT CHALUKYAN CITY WALLS INCLUDING MOAT AND MOAT WALLS AND ALL ANCIENT GATES AND ANCIENT DAM FORMING THE WESTERN BOUNDARY OF THE BHUTANATH TANK AT BADAMI, DIST.
Construction of Causeway , improvements to road from Dy30 to Choranahalli village and Construction of Low level Causeway , improvements to road adjoining SNO 92 of Devalapura village and Construction of Check dam /Bridge to Halla near Marigowdanahundi village in Mysuru Taluk. (Packege No-01)
IMPROVEMENTS TO ROAD FROM SH-86 TO JOIN ANTHRASANTHE ROAD (SH-33) VIA NAGANAHALLI, TARAKA DAM FROM CH.15.70 to 16.99 km & IMPROVEMENTS TO ROAD FROM H.D.KOTE-MURKAL ROAD AGASANAHUNDI CIRCLE TO GOWDI MACHANAYAKANAHALLI ROAD (SELECTED REACHES) IN H.D KOTE TALUK, MYSORE DISTRICT.
Annual maintenance, servicing of the lifting mechanism and associated electrical and mechanical components for the dam, MLBC and gallery motor, including inspection and lubrication of hoists, winch, wire rope, pulleys, couplings, motor bearings, control panel, and safety devices etc. for 2025-26
Conducting Total Station Survey, Analysis and Designs of Proposed Head Works in TB Dam Backwater / Other Sources, WTP at Suitable Location and Feeder Mains and Distribution Network Re-Zoning along with Conditional Assessment Survey of Existing ELSR under KMERC to Hosapete City
Providing Security arrangements to Halhalli and chandapur Bridge cum Barrage on Manjira River in Bidar district for the year 2025-26
Repairs to gates , new gates concrete work for approach road, retainig wall.
Vertical Slurry Sump Pumps along with motors and accessories. Model-100 RV SP/Equivalent, Make-Weir Minerals/ Warman/Equivalent
As per bid document
IMPROVEMENTS IN SELECTED REACHES TO BANASHANKARI MAHAKUT ALMATTI DAM SH-135 ROAD FROM KM 43.90 TO 44.90, 45.35 TO 47.00 50.80 TO 55.30 & 61.10 TO 62.65 IN BAGALKOTE TALUK OF BAGALKOTE CONSTITUENCY (UNDER 4059-80-051-0-60-132 FOR THE YEAR 2025-26)
Maintenance work of Budikote Railway Feeder Road from Ch.0.00 to 5.00km (Ch.0.00 to 11.27km) and Budikote to Markondeya Dam & join SH-99 Via Malur taluk Toralakki Road from Ch.11.27 to 14.10km (Ch.11.27 to 14.10km) for Year 2025-26 in Bangarpet taluk.
Providing Security Arrangement to Lower Mullamari Dam for the year 2025-26
Consultancy service for Preparations of DPR for the Reconstruction / Restoration Of Existing Check Dams across kushavathi halla near Kotagal Village, Upparahallli Village, Byarasandra Village and Gudisalahalli Village in Chinthamani Taluk, Chickkaballapur District.
Construction of Series of Shirpur Pattern Check Dams, Deepening &Widening of Nala and Recharge Shaft Works up to Kudiganur Nala, Local Nala Near Gola-B Village, from Korwar Bridge Wacchha BCB- Indanakal-Mattimadu, from Mogha-Margol up to Kagina River, from Bhosga Tank-Kapnoor Near Malgatti Village, from Naachawara up to Devnoor Village, Bilawar via Shivapur and Amberkhed towards Hangarga (K) from Hatagunda-Hunsihadagil up to Malli, from Kadani Minajgi up to Bhimalli Nala in Kalaburagi District (Under 4702 APB for the Year 2025-26)
As per bid document
Road, CC drain, Pipe Outlet, Tank Boundry Trench.
Consultancy service for Preparations of DPR for the Reconstruction / Restoration Of Existing Check Dams across kushavathi halla near Digava Gollahalli Village,Vegalahalli Village, Bhoopanahalli, Seetharamapura Village and Nallaghuttahalli Village in Chinthamani Taluk, Chickkaballapur District.
Maintenance of Pattan Cross to Narayanpur Dam SH-155 Road Km 97.30 to 170.60 (WR Km 128.63 to 134.00. Km 142.30 to 142.90, Km 147.35 to 148.00, Km 150.88 to 155.40 and Km 159.20 to 169.00) in Shorapur Taluka (Under 3054 SH Road Maintenance for the year 2025-26)
AME Removing & Errection of gates 1) Halsitugaon (Srimalli) Bandhara 2) Tugaon (H) Babdhara 3) Dawargaon Bandhara 4) Chitta Bandhara 5) Uchaa Bandhara 6) Nawadgi Bandhara 7) Attarga Bandhara 8) Nagoor (K) Bandhara 9) Dongapur Bandhara 10) Dadgi ... Mehkar Barrage in ...